C train: Delays, On-Time Rate & Reliability

80%trips on time (subway: 82.9%)
#14 of 23most on-time lines
16.7%trips 5+ min late
1,197delayed trains a month

How reliable is the C train?

Share of trips reaching the last stop within 5 minutes of schedule, by month, vs the whole subway.

The C train ran 80% of its trips on time (October 2025 – September 2026), worse than the subway as a whole (82.9%). It ranks #14 of 23 lines, where #1 is the most on time. Its on-time rate improved by 4.8 points compared with the 12 months before (75.2%).

Why is the C train delayed?

Delayed trains by cause, October 2025 – September 2026. "Planned ROW work" is scheduled track work.

The C train averaged about 1,197 delayed trains a month. The main causes: infrastructure & equipment (37%), planned row work (20%), police & medical (19%).

Report card

October 2025 – September 2026. Major incidents are counted per line, so the subway total is the sum.

C trainWhole subway
Trips on time80%82.9%
Trips 5+ minutes late16.7%15%
Extra wait on the platform91 sec79 sec
Extra time on the train6 sec31 sec
Gaps kept to schedule, rush hour71.7%–
Major incidents (50+ trains delayed)25865
Trips a month on this line (MTA estimate)5,306,187–

Other lines

All lines ranked 42 St Shuttle Franklin Av Shuttle Rockaway Park Shuttle 7 J/Z L G M 1 3 R 5 4 C D 6 A E Q F 2 N B

Questions

How reliable is the C train?

The C train ran 80% of its trips on time (October 2025 – September 2026), worse than the subway as a whole (82.9%). It ranks #14 of 23 lines, where #1 is the most on time.

Why is the C train delayed?

The C train averaged about 1,197 delayed trains a month. The main causes: infrastructure & equipment (37%), planned row work (20%), police & medical (19%).

How often is the C train late?

About 16.7% of C train trips took at least 5 minutes longer than scheduled (subway: 15%). Riders waited on average 91 seconds longer on the platform than the schedule says.

Is the C train getting better or worse?

Its on-time rate improved by 4.8 points compared with the 12 months before (75.2%).

More NYC transit data

Let's talk about transit data

Found something surprising about your station? Have a question the data could answer, or an idea for what to dig into next (congestion pricing, a train line, an event)? I'd love to hear it, and I'm always up for talking about transit data.

Get in touch → · Suggest an idea on GitHub

Share this page: RedditBlueskyXLinkedInFacebook

Data (data.ny.gov): Terminal On-Time Performance, Customer Journey-Focused Metrics, Trains Delayed, Wait Assessment, Major Incidents. Updated Oct 28, 2026. The MTA's own charts: metrics.mta.info.
Source code: github.com/MantieReid/mta-data-analysis · Analysis by Mantie Reid II (CC BY 4.0).