Rockaway Park Shuttle: Delays, On-Time Rate & Reliability

95.8%trips on time (subway: 82.9%)
#3 of 23most on-time lines
9.6%trips 5+ min late
189delayed trains a month

How reliable is the Rockaway Park Shuttle?

Share of trips reaching the last stop within 5 minutes of schedule, by month, vs the whole subway.

The Rockaway Park Shuttle ran 95.8% of its trips on time (October 2025 – September 2026), better than the subway as a whole (82.9%). It ranks #3 of 23 lines, where #1 is the most on time. Its on-time rate improved by 0.5 points compared with the 12 months before (95.3%).

Why is the Rockaway Park Shuttle delayed?

Delayed trains by cause, October 2025 – September 2026. "Planned ROW work" is scheduled track work.

The Rockaway Park Shuttle averaged about 189 delayed trains a month. The main causes: external factors (41%), infrastructure & equipment (23%), planned row work (22%).

Report card

October 2025 – September 2026. Major incidents are counted per line, so the subway total is the sum.

Rockaway Park ShuttleWhole subway
Trips on time95.8%82.9%
Trips 5+ minutes late9.6%15%
Extra wait on the platform57 sec79 sec
Extra time on the train-38 sec31 sec
Gaps kept to schedule, rush hour94.1%–
Major incidents (50+ trains delayed)0865
Trips a month on this line (MTA estimate)59,138–

Other lines

All lines ranked 42 St Shuttle Franklin Av Shuttle Rockaway Park Shuttle 7 J/Z L G M 1 3 R 5 4 C D 6 A E Q F 2 N B

Questions

How reliable is the Rockaway Park Shuttle?

The Rockaway Park Shuttle ran 95.8% of its trips on time (October 2025 – September 2026), better than the subway as a whole (82.9%). It ranks #3 of 23 lines, where #1 is the most on time.

Why is the Rockaway Park Shuttle delayed?

The Rockaway Park Shuttle averaged about 189 delayed trains a month. The main causes: external factors (41%), infrastructure & equipment (23%), planned row work (22%).

How often is the Rockaway Park Shuttle late?

About 9.6% of Rockaway Park Shuttle trips took at least 5 minutes longer than scheduled (subway: 15%). Riders waited on average 57 seconds longer on the platform than the schedule says.

Is the Rockaway Park Shuttle getting better or worse?

Its on-time rate improved by 0.5 points compared with the 12 months before (95.3%).

More NYC transit data

Let's talk about transit data

Found something surprising about your station? Have a question the data could answer, or an idea for what to dig into next (congestion pricing, a train line, an event)? I'd love to hear it, and I'm always up for talking about transit data.

Get in touch → · Suggest an idea on GitHub

Share this page: RedditBlueskyXLinkedInFacebook

Data (data.ny.gov): Terminal On-Time Performance, Customer Journey-Focused Metrics, Trains Delayed, Wait Assessment, Major Incidents. Updated Oct 28, 2026. The MTA's own charts: metrics.mta.info.
Source code: github.com/MantieReid/mta-data-analysis · Analysis by Mantie Reid II (CC BY 4.0).