Housing violations · Highbridge
1324 Ogden Avenue, Bronx
10452 · 36 apartments · 5 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs18
- Peeling paint and plaster16
- Broken doors or locks14
- Lead paint14
- Mice or rats6
- Mold5
- Roaches4
- Leaks and water damage4
- No heat or hot water2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 12 closed · NYC typical: 87 days
from 6 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19374239
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19311102
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19311103
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 20, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19311100
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311101
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 20, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19311099
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19311104
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 3rd room from east at northIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19241280
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19241335
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19241505
- CBroken doors or locksProperly repair with similar material the broken or defective masonry door saddle in the bathroomIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19241317
- BBroken doors or locksProperly repair with similar material the broken or defective cement subfloor under door sadle in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19241315
- COther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from eastIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19241324
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19241506
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the bathroomIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17551104
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at east wall in the foyerIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17551106
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at entrance door in the foyerIssued Dec 13, 2024 · fix by Dec 27, 2024 overdue · Violation #17551107
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balance at west wall in the 3rd room from north at westIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17551105
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Dec 13, 2024 · fix by Jan 17, 2025 overdue · Violation #17551103
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at apartment door in the entranceIssued Dec 10, 2024 · fix by Dec 24, 2024 overdue · Violation #17542348
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17199861
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 22, 2024 · fix by Jun 15, 2024 overdue · Violation #16994625
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 22, 2024 · fix by Jun 15, 2024 overdue · Violation #16994630
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued May 22, 2024 · fix by Jun 15, 2024 overdue · Violation #16994631
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 22, 2024 · fix by Jun 15, 2024 overdue · Violation #16994626
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 22, 2024 · fix by Jun 15, 2024 overdue · Violation #16994627
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 22, 2024 · fix by Jun 15, 2024 overdue · Violation #16994628
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued May 22, 2024 · fix by Jun 15, 2024 overdue · Violation #16994629
- BMoldTrace and repair the source and abate the visible mold condition approx 10 sqft at the south wall in the 3rd room from eastIssued May 22, 2024 · fix by Jun 26, 2024 overdue · Violation #16988977
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Dec 5, 2023 · fix by Dec 29, 2023 overdue · Violation #16501502
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 4, 2023 · fix by Dec 28, 2023 overdue · Violation #16501387
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 4, 2023 · fix by Dec 30, 2023 overdue · Violation #16496069
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 4, 2023 · fix by Dec 28, 2023 overdue · Violation #16501385
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 4, 2023 · fix by Dec 28, 2023 overdue · Violation #16501384
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 4, 2023 · fix by Dec 28, 2023 overdue · Violation #16501383
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective repair/adjust latch set at door in the entranceIssued Dec 4, 2023 · fix by Dec 18, 2023 overdue · Violation #16496066
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 4, 2023 · fix by Dec 28, 2023 overdue · Violation #16501388
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 4, 2023 · fix by Dec 28, 2023 overdue · Violation #16501386
- BBroken doors or locksProperly repair or replace the broken or defective the marble saddle at the door in the entranceIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #16164657
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 3rd room from northIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #16164654
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 16, 2023 · fix by Sep 11, 2023 overdue · Violation #16164653
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #16164652
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 16, 2023 · fix by Sep 11, 2023 overdue · Violation #16164651
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east and south walls in the foyerIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #16164658
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north and east walls in the kitchenIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #16164655
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 8, 2023 · fix by Apr 3, 2023 overdue · Violation #15759032
- BMoldTrace and repair the source and abate the visible mold condition 2 sqft at north wall in the 1st room from east at southIssued Jul 6, 2022 · fix by Aug 10, 2022 overdue · Violation #15252960
- CMice or ratsAbate the infestation consisting of miceIssued Nov 19, 2021 · fix by Dec 15, 2021 overdue · Violation #14688833
- BElectrical problemsProperly repair the broken or defective electrical light switch at west wall in the 2nd room from northIssued Nov 19, 2021 · fix by Dec 24, 2021 overdue · Violation #14688838
- BMoldTrace and repair the source and abate the visible mold condition all wall and ceiling. in the bathroomIssued May 11, 2021 · fix by Jun 15, 2021 overdue · Violation #14330582
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 3, 2020 · fix by Sep 29, 2020 overdue · Violation #13794890
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.