Housing violations · Highbridge
1360 Ogden Avenue, Bronx
10452 · 35 apartments · 5 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
38 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Open problems
All open violations in the building, by type.
- Other repairs123
- Peeling paint and plaster112
- Leaks and water damage57
- Mold51
- Broken doors or locks40
- Mice or rats32
- Roaches29
- Electrical problems14
- Plumbing, sinks and toilets14
- Missing smoke or CO detector8
- No heat or hot water6
- Bedbugs3
- Lead paint3
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 154 closed · NYC typical: 87 days
from 160 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 16, 2026 · Violation #19383788
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19383786
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Nov 6, 2026 · fix by Dec 2, 2026 · rent impairing · Violation #19357200
- COther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods off guides at 2nd fire escape from south at east exterior wall…Issued Nov 6, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19357197
- BBroken doors or locksProperly repair with similar material the broken or defective mortise lock at building entrance door courtIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19289815
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at 2nd fire escape…Issued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202198
- BElectrical problemsRemove all encumbrances consisting of electric bikes at public hall, 1st storyIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19202197
- COther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods off guide at 2nd fire escape from south at east exterior wall…Issued Sep 4, 2026 · fix by Sep 10, 2026 overdue · rent impairing · Violation #19195054
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19195051
- BOther repairsRemove all encumbrances consisting of bikes and bike frames at public hall, 1st storyIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19188833
- BOther repairsRemove all encumbrances consisting of mattress at public hall, 5th storyIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19188832
- BOther repairsProperly repair with similar material the broken or defective wood floor at area of radiator on west wall in the 5th room from eastIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19172367
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak concealed leak at ceiling in the bathroomIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19172357
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiiling and closet at south wall in the 1st room from east at northIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19172381
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from eastIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19172405
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak concealed leak at ceiling in the 1st room from east at northIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19172379
- BPlumbing, sinks and toiletsRepair the broken or defective connection at wash basin waste line in the bathroomIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19172401
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the bathroomIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19172403
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west wall and east wall in the bathroomIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19172391
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd private hallway from northIssued Aug 7, 2026 · fix by Aug 13, 2026 overdue · Violation #19119948
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19119941
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19119939
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19119954
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19119953
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077117
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at westIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077119
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north at eastIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077115
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north at westIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077116
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st private hallway from northIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077118
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at westIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19046298
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19046297
- BPlumbing, sinks and toiletsRepair the broken or defective connection at wash basin waste line. in the bathroomIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19049017
- BBroken doors or locksProperly repair or replace the broken or defective closet doors at east wall in the 3rd room from north at westIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19046296
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at westIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19046294
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from eastIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19049023
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19046301
- COther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at westIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19046295
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 1, 2026 · fix by Jul 27, 2026 overdue · Violation #19042986
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 1, 2026 · fix by Jul 27, 2026 overdue · Violation #19042985
- BOther repairsProperly repair or replace the broken or defective spring balance on lower window sash in the 1st room from northIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19041293
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Jun 29, 2026 · fix by Jul 5, 2026 overdue · Violation #19041317
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from northIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19041301
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jun 25, 2026 · fix by Jul 1, 2026 overdue · Violation #19028867
- COther repairsProperly repair with similar material the broken or defective wod floor in the 2nd room from north at eastIssued Jun 25, 2026 · fix by Jul 1, 2026 overdue · Violation #19028869
- COther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at westIssued Jun 25, 2026 · fix by Jul 1, 2026 overdue · Violation #19028868
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 3rd room from north at westIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19028864
- BMoldTrace and repair the source and abate the visible mold condition over 10 sqft at ceiling in the bathroomIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19028863
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Jun 24, 2026 · fix by Jun 30, 2026 overdue · Violation #19033334
- COther repairsProperly repair with similar material the broken or defective wood subfloor in the 1st room from east at southIssued May 7, 2026 · fix by May 13, 2026 overdue · Violation #18899035
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Apr 10, 2026 · fix by May 6, 2026 overdue · Violation #18777269
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 10, 2026 · fix by May 6, 2026 overdue · Violation #18777313
- COther repairsProperly repair with similar material the broken or defective wood at subfloor in the 1st room from north at eastIssued Apr 10, 2026 · fix by Apr 16, 2026 overdue · Violation #18777250
- BOther repairsProperly repair or replace the broken or defective hydrophonic heater cover at north wall in the 1st room from eastIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756548
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood sink base cabinet and counter top in the kitchenIssued Apr 2, 2026 · fix by Apr 8, 2026 overdue · Violation #18756525
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at kitchen sink wastline in the kitchenIssued Apr 2, 2026 · fix by May 7, 2026 overdue · rent impairing · Violation #18756516
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west and north wall in south bathroom in the bathroomIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18756505
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling west and north wall in the bathroomIssued Apr 2, 2026 · fix by Apr 8, 2026 overdue · Violation #18756512
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 5, 2026 · fix by Mar 31, 2026 overdue · Violation #18692568
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 5, 2026 · fix by Mar 31, 2026 overdue · Violation #18692567
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 5, 2026 · fix by Mar 31, 2026 overdue · Violation #18692575
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.