Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Williamsbridge-Olinville

3604 Olinville Avenue, Bronx

10467 · 49 apartments · 6 stories · City Council district 12

By · Updated · Data from NYC HPD

C
65open immediately hazardous violations · 133 per 100 apartments
B69Hazardous, open
A14Non-hazardous, open
!127Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyHEIGHTS REALTY CO LLC
Landlord (head officer or owner)Shimon Greisman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    30
  2. Other repairs
    24
  3. Mice or rats
    22
  4. Broken doors or locks
    19
  5. Missing smoke or CO detector
    14
  6. Roaches
    13
  7. Lead paint
    12
  8. Leaks and water damage
    6
  9. Plumbing, sinks and toilets
    5
  10. No heat or hot water
    1
  11. Missing window guards
    1
  12. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C74 days
from 49 closed · NYC typical: 87 days
B98 days
from 118 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341431
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19341432
  • B
    Other repairsProperly repair with similar material the broken or defective the ceramic tiles at north wall in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341433
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341434
  • B
    Other repairsProperly repair with similar material the broken or defective the masonary floor saddle at entrance in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341435
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective the wood base cabinet under wash basin in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341436
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341437
  • B
    Other repairsReplace the broken or defective the shut off valve handle to radiator at west in the 1st room from east at northIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19341445
  • B
    Other repairsProperly repair or replace the broken or defective upper sash balance to 1st window at west in the 4th room from east at northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341425
  • B
    Other repairsProperly repair or replace the broken or defective the upper and lower sash balance to 2nd window at west in the 4th room from east at northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341426
  • B
    Other repairsProperly repair or replace the broken or defective upper glass pane to 1st window at west in the 4th room from east at northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341427
  • C
    Broken doors or locksProperly repair or replace the broken or defective the mortise lockset at entrance door toIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19341442
  • B
    Broken doors or locksReplace with new the missing door knob to closet at south in the foyerIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341440
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19341438
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341428
  • B
    Other repairsProperly repair or replace the broken or defective the upper and lower sashes to 1st window at west in the 1st room from east at northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341443
  • B
    Other repairsProperly repair or replace the broken or defective the upper and lower sash balances to 2nd window at west in the 1st room from east at northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341444
  • B
    Broken doors or locksRefit entrance door toIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341441
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341446
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective the wood floor to base cabinet under sink in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19341430
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193811
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193819
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the 1st room from eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193820
  • B
    Broken doors or locksProperly repair or replace the broken or defective door lock in the entranceIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193821
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193822
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193823
  • B
    Other repairsProperly repair with similar material the broken or defective reglaze porcelain enemel at bath tub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193818
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19193816
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193815
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193813
  • B
    Other repairsProperly repair or replace the broken or defective lower sash window glass pane in the 1st room from eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193817
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193812
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193810
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193809
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 19, 2026 · fix by Aug 25, 2026 overdue · Violation #19146633
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Aug 19, 2026 · fix by Aug 25, 2026 overdue · Violation #19146632
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the foyerIssued Aug 19, 2026 · fix by Sep 2, 2026 overdue · Violation #19146631
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146629
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146627
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146626
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Aug 19, 2026 · fix by Aug 25, 2026 overdue · Violation #19146634
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18708179
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18708177
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 13, 2026 · fix by Apr 8, 2026 overdue · Violation #18708180
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the yard at east , 1st storyIssued Feb 27, 2026 · fix by Apr 3, 2026 overdue · Violation #18669747
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Feb 27, 2026 · fix by Mar 25, 2026 overdue · rent impairing · Violation #18669748
  • B
    Other repairsProvide escutheon plate at riser at ceiling in the bathroomIssued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18493257
  • B
    Other repairsProperly repair or replace the broken or defective missing/ gaps (grout) at east wall (floor) in the bathroomIssued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18493261
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall & west wall in the 3rd room from north at westIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18493255
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 10, 2025 · fix by Jan 5, 2026 overdue · Violation #18493259
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 1, 2025 · fix by Aug 15, 2025 overdue · Violation #18122227
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Aug 1, 2025 · fix by Aug 7, 2025 overdue · Violation #18122228
  • C
    Other repairsProperly repair or replace the broken or defective lower window sash glass pane at second window from east at south in the 2nd room from eastIssued Aug 1, 2025 · fix by Aug 7, 2025 overdue · Violation #18122226
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 21, 2025 · fix by Feb 16, 2025 overdue · Violation #17631897
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 21, 2025 · fix by Jan 19, 2025 overdue · rent impairing · Violation #17631898
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 21, 2025 · fix by Feb 16, 2025 overdue · Violation #17631900
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Jan 21, 2025 · fix by Jan 27, 2025 overdue · Violation #17631899
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Dec 5, 2024 · fix by Dec 19, 2024 overdue · Violation #17499867
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enameal finish at bathtub in the bathroomIssued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17414639
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2024 · fix by Dec 3, 2024 overdue · Violation #17402297

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

72017
582018
92019
82020
752021
582022
752023
1652024
332025
622026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 613 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.