Housing violations · Mott Haven-Port Morris
750 East 134 Street, Bronx
10454 · 133 apartments · 8 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building is about the same.
6 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster21
- Broken doors or locks13
- Other repairs10
- No heat or hot water6
- Roaches4
- Electrical problems4
- Leaks and water damage2
- Missing smoke or CO detector2
- Mice or rats1
- Lead paint1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 20 closed · NYC typical: 84 days
from 17 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomNotice not sent yet · inspected Nov 21, 2026 · Violation #19417417
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and south walls in the 1st room from northNotice not sent yet · inspected Nov 21, 2026 · Violation #19417418
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st bathroom from east at northIssued Nov 19, 2026 · fix by Dec 24, 2026 · Violation #19398631
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 19, 2026 · fix by Dec 15, 2026 · Violation #19398624
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the east wall in the bathroomIssued Nov 19, 2026 · fix by Dec 24, 2026 · Violation #19398629
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the east wall in the bathroomIssued Nov 19, 2026 · fix by Dec 24, 2026 · Violation #19398630
- BElectrical problemsProperly repair or replace the broken or defective 1st electrical outlet from north at east wall in the kitchenIssued Nov 19, 2026 · fix by Dec 24, 2026 · Violation #19398625
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling at public hall, 5th storyIssued Nov 19, 2026 · fix by Dec 24, 2026 · Violation #19400241
- CBroken doors or locksProperly repair or replace the broken or defective glass at fire door to staircase a creating a cut hazard at public hall stairs, 4th storyIssued Nov 19, 2026 · fix by Nov 25, 2026 · Violation #19398634
- BOther repairsProperly repair or replace the broken or defective intercom system at building front to return buzzer at the west wall in the foyerIssued Nov 19, 2026 · fix by Dec 24, 2026 · Violation #19398633
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures at bathtub in the bathroomIssued Nov 19, 2026 · fix by Dec 24, 2026 · rent impairing · Violation #19398627
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st bathroom from east at northIssued Nov 19, 2026 · fix by Dec 24, 2026 · Violation #19398632
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 18, 2026 · fix by Nov 18, 2026 overdue · rent impairing · Violation #19398623
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 18, 2026 · fix by Dec 14, 2026 · Violation #19398638
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 18, 2026 · fix by Nov 18, 2026 overdue · rent impairing · Violation #19398637
- COther repairsProperly repair with similar material the broken or defective wooden parquet floor tiles causing trip hazard in the kitchenetteIssued Nov 18, 2026 · fix by Nov 24, 2026 overdue · Violation #19398636
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 18, 2026 · fix by Nov 18, 2026 overdue · rent impairing · Violation #19398635
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 18, 2026 · fix by Nov 24, 2026 overdue · Violation #19398626
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 18, 2026 · fix by Nov 18, 2026 overdue · rent impairing · Violation #19398628
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, and south wall in the 2nd room from north at westIssued Nov 16, 2026 · fix by Dec 21, 2026 · Violation #19371617
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 16, 2026 · fix by Dec 21, 2026 · Violation #19371618
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 16, 2026 · fix by Dec 21, 2026 · Violation #19371619
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 16, 2026 · fix by Dec 21, 2026 · Violation #19371615
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Nov 16, 2026 · fix by Dec 21, 2026 · Violation #19371616
- CBroken doors or locksProperly repair or replace the broken or defective broken glass pane at stair a exit door from 5th story stairwell to 4th story public hall causing a potential…Issued Nov 13, 2026 · fix by Nov 19, 2026 overdue · Violation #19371620
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and west wall in the private hallwayIssued Nov 6, 2026 · fix by Nov 12, 2026 overdue · Violation #19355040
- COther repairsProperly repair with similar material the broken or defective fire retardant material at at west wall at public hall, 1st storyIssued Nov 6, 2026 · fix by Nov 12, 2026 overdue · Violation #19355044
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south wall in the 2nd room from eastIssued Nov 6, 2026 · fix by Nov 12, 2026 overdue · Violation #19355041
- BOther repairsAbate the nuisance consisting of pests. evidence of at west wall at public hall, 1st storyIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19363144
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355043
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355042
- COther repairsProperly repair with similar material the broken or defective fire retardant material on lower wall through-out (two foot cut/flood cut) at public hall, 6th…Issued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19336079
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at all walls at public hall, 6th storyIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19318379
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 23, 2026 · fix by Nov 18, 2026 overdue · Violation #19318374
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assembly at door from street to vestibule at public hall, 1st storyIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318385
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at west wall at public hall, 1st storyIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318383
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at walls and ceiling at public hall, 1st storyIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318381
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 1st room from north at eastIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318378
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south wall in the 1st room from north at eastIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318377
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318376
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and west wall in the foyerIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318373
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the foyerIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318372
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318371
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 23, 2026 · fix by Nov 18, 2026 overdue · Violation #19318375
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19299604
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 15, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19299603
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19280454
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective frame at building entrance door , 1st storyIssued Aug 31, 2026 · fix by Sep 14, 2026 overdue · Violation #19176552
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from northIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129842
- CLead paintProvide ready access to buildings heating system basement door locked leadind to boiler at boiler roomIssued May 26, 2026 · fix by Jun 1, 2026 overdue · Violation #18956537
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued May 26, 2026 · fix by Jun 1, 2026 overdue · Violation #18948826
- CBroken doors or locksProvide ready access to buildings heating system locked boiler room at boiler roomIssued May 21, 2026 · fix by May 27, 2026 overdue · Violation #18942683
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 18, 2026 · fix by May 24, 2026 overdue · Violation #18934829
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 18, 2026 · fix by May 24, 2026 overdue · Violation #18934827
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 14, 2026 · fix by May 20, 2026 overdue · Violation #18913181
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued May 11, 2026 · fix by May 17, 2026 overdue · Violation #18909903
- CBroken doors or locksProvide ready access to buildings heating system locked at boiler roomIssued May 11, 2026 · fix by May 17, 2026 overdue · Violation #18909902
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall at public hall, 6th storyIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18909907
- CBroken doors or locksProvide ready access to buildings heating system locked at boiler roomIssued May 11, 2026 · fix by May 17, 2026 overdue · Violation #18909900
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 24, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.