Housing violations · Parkchester
1430 Parkchester Road, Bronx
10462 · 107 apartments · 13 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster31
- Other repairs16
- Leaks and water damage15
- Mold6
- Missing smoke or CO detector5
- Roaches2
- Broken doors or locks2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 11 closed · NYC typical: 87 days
from 29 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2026 · fix by Dec 2, 2026 · Violation #19355029
- COther repairs& 309 m/d law abate the nuisance consisting of plywood covering at north wall at public hall, 1st storyIssued Nov 6, 2026 · fix by Nov 12, 2026 overdue · Violation #19355031
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor closet at public hall, 6th storyIssued Nov 6, 2026 · fix by Nov 20, 2026 · Violation #19355030
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340717
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340720
- BBroken doors or locksProperly repair or replace the broken or defective entry door in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340721
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19340719
- BElectrical problemsProperly repair or replace the broken or defective electrical wall outlet at south wall in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19340716
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283431
- BMoldTrace and repair the source and abate the visible mold condition less than ten square feet at north wall in the private hallwayIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17760294
- CMoldTrace and repair the source and abate the visible mold condition more than thirty square feet at north wall and east wall in the private hallwayIssued Nov 12, 2024 · fix by Dec 8, 2024 overdue · Violation #17408397
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jul 8, 2024 · fix by Aug 12, 2024 overdue · Violation #17101430
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2023 · fix by Sep 12, 2023 overdue · Violation #16165478
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from north at eastIssued Aug 8, 2023 · fix by Sep 12, 2023 overdue · Violation #16148178
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Aug 8, 2023 · fix by Sep 12, 2023 overdue · Violation #16148180
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the private hallwayIssued Aug 8, 2023 · fix by Sep 12, 2023 overdue · Violation #16148177
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the foyerIssued Aug 8, 2023 · fix by Sep 12, 2023 overdue · Violation #16148175
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north at westIssued Aug 8, 2023 · fix by Sep 12, 2023 overdue · Violation #16148181
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 3rd room from northIssued Aug 8, 2023 · fix by Sep 12, 2023 overdue · Violation #16148182
- BOther repairsProperly repair with similar material the broken or defective wood window stool in the 3rd room from northIssued Aug 8, 2023 · fix by Sep 12, 2023 overdue · Violation #16148183
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the foyerIssued Aug 8, 2023 · fix by Sep 12, 2023 overdue · Violation #16148176
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Jan 18, 2023 · fix by Feb 22, 2023 overdue · Violation #15668826
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and east walls in the 2nd room from eastIssued Jan 18, 2023 · fix by Feb 22, 2023 overdue · Violation #15668827
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Jan 18, 2023 · fix by Feb 22, 2023 overdue · Violation #15668830
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Jan 18, 2023 · fix by Feb 22, 2023 overdue · Violation #15668829
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 18, 2023 · fix by Feb 22, 2023 overdue · Violation #15668828
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Jan 18, 2023 · fix by Feb 22, 2023 overdue · Violation #15668831
- BOther repairs& 309 m/d law abate the nuisance consisting of consisting of temporay metal and plywood installed at the ceiling in the bathroomIssued Sep 1, 2022 · fix by Oct 6, 2022 overdue · Violation #15336612
- BOther repairs& 309 m/d law abate the nuisance consisting of consisting of temporay metal and plywood installed at the ceiling in the kitchenIssued Sep 1, 2022 · fix by Oct 6, 2022 overdue · Violation #15336610
- BOther repairs& 309 m/d law abate the nuisance consisting of consisting of temporay metal and plywood installed at the ceiling in the 2nd room from eastIssued Sep 1, 2022 · fix by Oct 6, 2022 overdue · Violation #15336611
- BOther repairs& 309 m/d law abate the nuisance consisting of consisting of temporay metal and plywood installed at the ceiling in the 4th room from eastIssued Sep 1, 2022 · fix by Oct 6, 2022 overdue · Violation #15336613
- BOther repairs& 309 m/d law abate the nuisance consisting of consisting of temporay metal and plywood installed at the ceiling in the 3rd room from east at southIssued Sep 1, 2022 · fix by Oct 6, 2022 overdue · Violation #15336614
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchenIssued Jun 13, 2022 · fix by Jul 18, 2022 overdue · Violation #15211800
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st private hallway from northIssued Jun 13, 2022 · fix by Jul 18, 2022 overdue · Violation #15211801
- BMoldTrace and repair the source and abate the visible mold condition at north wall (approx.2 sq.ft.) in the 4th room from north at westIssued Apr 7, 2022 · fix by May 12, 2022 overdue · Violation #15102570
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling & walls in the 4th room from north at westIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711412
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711413
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling & west wall in the private hallwayIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711414
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711415
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north & west walls in the kitchenIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711416
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711417
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling & walls in the bathroomIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711408
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711407
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at south wall in the bathroomIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711409
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north at westIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14711411
- BMoldTrace and repair the source and abate the visible mold condition on east wall approx. 6 sq ft., south wall approx., 4 sq ft. north wall approx. 9 sq ft., and…Issued Aug 12, 2021 · fix by Sep 16, 2021 overdue · Violation #14474747
- BMoldTrace and repair the source and abate the visible mold condition approx 8 sq ft at south wall, 4 sq ft at east wall, 2 sq ft at west wall and 6 sq ft at…Issued Dec 14, 2020 · fix by Jan 18, 2021 overdue · Violation #13934445
- BMissing smoke or CO detectorRepair or replace the smoke detector inoperative in the entire apartmentIssued Dec 14, 2020 · fix by Jan 18, 2021 overdue · Violation #13934444
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the 2nd private hallwayIssued Mar 12, 2020 · fix by Apr 16, 2020 overdue · Violation #13644949
- BMoldTrace and repair the source and abate the visible mold condition approximately 15 sq ft at east wall in the 1st room from north at eastIssued Mar 12, 2020 · fix by Apr 16, 2020 overdue · Violation #13644950
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north at eastIssued Mar 12, 2020 · fix by Apr 16, 2020 overdue · Violation #13644951
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the east wall in the 1st room from north at eastIssued Mar 12, 2020 · fix by Apr 16, 2020 overdue · Violation #13644952
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Sep 9, 2019 · fix by Oct 14, 2019 overdue · Violation #13266606
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall, south wall and ceiling in the kitchenIssued Jul 19, 2019 · fix by Aug 23, 2019 overdue · Violation #13150790
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Jun 10, 2019 · fix by Jul 8, 2019 overdue · Violation #13110928
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, in the 4th room from northIssued Mar 12, 2019 · fix by Apr 16, 2019 overdue · Violation #12953226
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling in the 4th room from eastIssued Feb 8, 2019 · fix by Mar 15, 2019 overdue · Violation #12339142
- BMissing smoke or CO detectorRepair or replace the smoke detector defectiveIssued Jan 8, 2019 · fix by Feb 12, 2019 overdue · Violation #12838232
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Dec 10, 2018 · fix by Jan 14, 2019 overdue · Violation #12796651
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Jun 18, 2018 · fix by Jul 23, 2018 overdue · Violation #12433090
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.