Housing violations · Inwood
117 Dyckman Street, Manhattan
10040 · 61 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint9
- Mice or rats7
- Broken doors or locks7
- Roaches6
- Peeling paint and plaster6
- Other repairs4
- Leaks and water damage3
- Electrical problems3
- Mold2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 10 closed · NYC typical: 87 days
from 5 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective lower counter -balance springs at the 2nd window from east at south in the 2nd room from eastIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18738089
- BOther repairsProperly repair or replace the broken or defective lower counter-balance springs at the 2nd window from south at west in the 5th room from eastIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18738086
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 27, 2026 · fix by Apr 22, 2026 overdue · Violation #18738088
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 27, 2026 · fix by Apr 22, 2026 overdue · Violation #18738087
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18639363
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at northIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18639360
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 2nd room from east at northIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18639361
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 13, 2026 · fix by Mar 11, 2026 overdue · Violation #18639362
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at northIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18639359
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak on the west wall and the ceiling in the bathroomIssued May 12, 2025 · fix by Jun 16, 2025 overdue · Violation #17871371
- BBroken doors or locksProperly repair or replace the broken or defective wood door frame at east wall in the 1st room from eastIssued May 12, 2025 · fix by Jun 16, 2025 overdue · Violation #17871384
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued May 12, 2025 · fix by Jun 5, 2025 overdue · Violation #17896153
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at the ceiling in the kitchenIssued May 9, 2025 · fix by Jun 13, 2025 overdue · Violation #17871385
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 2nd room from east at northIssued May 9, 2025 · fix by Jun 13, 2025 overdue · Violation #17871383
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock at building # 5 entrance door at public hall, 1st storyIssued Nov 15, 2024 · fix by Nov 21, 2024 overdue · Violation #17417991
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Mar 7, 2022 · fix by Mar 31, 2022 overdue · Violation #14986062
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 4, 2022 · fix by Mar 28, 2022 overdue · Violation #14984902
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 4, 2022 · fix by Mar 28, 2022 overdue · Violation #14984901
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Mar 4, 2022 · fix by Mar 28, 2022 overdue · Violation #14984900
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 4, 2022 · fix by Mar 28, 2022 overdue · Violation #14984899
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Mar 4, 2022 · fix by Mar 28, 2022 overdue · Violation #14984897
- BBroken doors or locksProperly repair the broken or defective mortise lock assembly in the entranceIssued Apr 26, 2021 · fix by May 31, 2021 overdue · Violation #14308362
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 26, 2021 · fix by May 22, 2021 overdue · Violation #14308363
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 26, 2021 · fix by May 22, 2021 overdue · Violation #14308366
- CBroken doors or locksArrange and make self-closing the doors in the entranceIssued Apr 26, 2021 · fix by May 22, 2021 overdue · Violation #14308365
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 26, 2021 · fix by May 22, 2021 overdue · Violation #14308364
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 26, 2021 · fix by May 22, 2021 overdue · Violation #14308367
- BOther repairsRemove all encumbrances consisting of household items at public hall, 1st story, section ''bldg 1''Issued Apr 19, 2021 · fix by May 24, 2021 overdue · rent impairing · Violation #14264353
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed on door leading to fire escape in the 1st room from east at southIssued Apr 19, 2021 · fix by May 24, 2021 overdue · Violation #14264320
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed on door leading to fire escape in the 1st room from east at northIssued Apr 19, 2021 · fix by May 24, 2021 overdue · Violation #14264377
- BOther repairsRemove all encumbrances consisting of household items at public hall, 5th story, section ''bldg 1''Issued Apr 19, 2021 · fix by May 24, 2021 overdue · rent impairing · Violation #14264358
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 6, 2019 · fix by Nov 27, 2019 overdue · Violation #13323797
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2019 · fix by Nov 27, 2019 overdue · Violation #13323798
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Dec 30, 2015 · fix by Feb 3, 2016 overdue · Violation #11051252
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Dec 30, 2015 · fix by Feb 3, 2016 overdue · Violation #11051267
- BMice or ratsAbate the nuisance consisting of miceIssued Sep 18, 2015 · fix by Oct 23, 2015 overdue · Violation #10865400
- BRoachesAbate the nuisance consisting of roachesIssued Sep 18, 2015 · fix by Oct 23, 2015 overdue · Violation #10865401
- BBroken doors or locksProperly repair the broken or defective mortise door lock assembly in the entranceIssued Sep 18, 2015 · fix by Oct 23, 2015 overdue · Violation #10865408
- BMoldTrace and repair the source and abate the nuisance consisting of mold north wall, in the bathroomIssued Aug 15, 2011 · fix by Sep 19, 2011 overdue · Violation #9056324
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.