Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Highbridge

1345 Plimpton Avenue, Bronx

10452 · 24 apartments · 6 stories · City Council district 16

By · Updated · Data from NYC HPD

C
139open immediately hazardous violations · 579 per 100 apartments
B106Hazardous, open
A26Non-hazardous, open
!258Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

33 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Open problems

All open violations in the building, by type.

  1. Other repairs
    71
  2. Mold
    47
  3. Peeling paint and plaster
    38
  4. Broken doors or locks
    23
  5. Leaks and water damage
    19
  6. Mice or rats
    17
  7. No heat or hot water
    16
  8. Roaches
    16
  9. Plumbing, sinks and toilets
    12
  10. Missing smoke or CO detector
    6
  11. Bedbugs
    3
  12. Electrical problems
    2
  13. Lead paint
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C98 days
from 135 closed · NYC typical: 87 days
B112 days
from 90 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19362697
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at boiler room at cellarIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19343880
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 2, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19343862
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 28, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19336340
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19336343
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 22, 2026 · fix by Oct 28, 2026 overdue · Violation #19317532
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 22, 2026 · fix by Oct 21, 2026 overdue · rent impairing · Violation #19317531
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 21, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19316510
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316516
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from eastIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316515
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316513
  • B
    Other repairsProvide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 4th storyIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316520
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19316511
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19316517
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19303321
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 15, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19303317
  • C
    Broken doors or locksProvide ready access to buildings heating system boiler room door locked at cellarIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19288520
  • C
    Broken doors or locksProperly repair or replace the broken or defective lower glass panel at building entrance door at public hall, 1st storyIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19288523
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 8, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19288515
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281362
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in south west corner of boiler room at boiler roomIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19281845
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak concealed leak at ceiling in the kitchenIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19281335
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19281341
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base sink base cabinet in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281346
  • C
    Leaks and water damageProperly repair or replace the broken or defective leaking boiler at boiler roomIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19281853
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281350
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281355
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19281361
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective entrance door to apartment in the entranceIssued Oct 7, 2026 · fix by Oct 21, 2026 overdue · Violation #19281378
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19281327
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 6, 2026 · fix by Oct 6, 2026 overdue · rent impairing · Violation #19281321
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basementIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19273513
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at…Issued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19273515
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 2, 2026 · fix by Oct 1, 2026 overdue · rent impairing · Violation #19267839
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19241263
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash window in the 4th room from northIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19241261
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 23, 2026 · fix by Oct 19, 2026 overdue · Violation #19241266
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19226448
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19226447
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft but less than 30 in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19226449
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19226459
  • C
    Other repairsProperly repair or replace the broken or defective boiler at boiler roomIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · Violation #19180548
  • C
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in drain glogged at cellarIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · rent impairing · Violation #19180545
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 1, 2026 · fix by Aug 29, 2026 overdue · rent impairing · Violation #19180524
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19159321
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 24, 2026 · fix by Aug 21, 2026 overdue · rent impairing · Violation #19159319
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 20, 2026 · fix by Aug 19, 2026 overdue · rent impairing · Violation #19152828
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 20, 2026 · fix by Aug 19, 2026 overdue · rent impairing · Violation #19152840
  • C
    Other repairsProperly repair or replace the broken or defective glass at window at north wall at public hall, 1st storyIssued Aug 20, 2026 · fix by Aug 26, 2026 overdue · Violation #19152352
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Aug 20, 2026 · fix by Aug 26, 2026 overdue · Violation #19152842
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at intermediate landing [ north and west wall ] at public hall, 1st storyIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19152832
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at west wall at public hall, 1st storyIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19152830
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash window [ west wall window ] in the 1st room from east at southIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19152825
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19152824
  • C
    Other repairsProvide ready access to buildings heating system no access to boiler room at public hall, 1st storyIssued Aug 20, 2026 · fix by Aug 26, 2026 overdue · Violation #19152358
  • C
    Other repairsProperly repair or replace the broken or defective glass at building entrance dooe at public hall, 1st storyIssued Aug 20, 2026 · fix by Aug 26, 2026 overdue · Violation #19152353
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 20, 2026 · fix by Aug 19, 2026 overdue · rent impairing · Violation #19152335
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Aug 13, 2026 · fix by Aug 19, 2026 overdue · Violation #19140788
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 13, 2026 · fix by Aug 12, 2026 overdue · rent impairing · Violation #19140787
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at north wall and west wall at intermediate landing to 2nd story at…Issued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19096226

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

212017
532018
642019
72020
1132021
872022
302023
1082024
2412025
1122026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 895 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.