Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · University Heights (North)-Fordham

2629 Sedgwick Avenue, Bronx

10468 · 30 apartments · 5 stories · City Council district 14

By · Updated · Data from NYC HPD

C
75open immediately hazardous violations · 250 per 100 apartments
B123Hazardous, open
A53Non-hazardous, open
!218Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

17 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companySEDGWICK AVENUE DIGNITY DEVELOPERS LLC
Landlord (head officer or owner)John Warren

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    70
  2. Peeling paint and plaster
    56
  3. Broken doors or locks
    24
  4. Roaches
    19
  5. Mold
    14
  6. Plumbing, sinks and toilets
    13
  7. Mice or rats
    13
  8. Lead paint
    12
  9. Leaks and water damage
    12
  10. No heat or hot water
    8
  11. Missing smoke or CO detector
    6
  12. Missing window guards
    2
  13. Electrical problems
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C78 days
from 43 closed · NYC typical: 87 days
B120 days
from 54 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Lead paintProperly repair or replace the broken or defective latch at door leading to south yard. at public hall, 1st storyIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19369682
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective latch at door leading to south yard at public hall, 1st storyIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19369681
  • B
    Broken doors or locksProvide lock and assembly allowing re-entry at fire door at 1st public hall bulkhead from north, section ''north''Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19350219
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at fire door at 1st public hall bulkhead from north, section ''north''Issued Nov 2, 2026 · fix by Nov 16, 2026 · Violation #19350216
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 21, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19312175
  • C
    Other repairsProperly repair with similar material the broken or defective the ceiling at public hall, 1st storyIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19311022
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at westIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19311018
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311014
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311015
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at eastIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19311019
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tile grout around bathtub in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311021
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above the fire retardant ceiling at public hall, 1st storyIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311024
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the 4th room from north at eastIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311020
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at westIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19311017
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19311013
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Oct 19, 2026 · fix by Oct 19, 2026 overdue · rent impairing · Violation #19307226
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19307230
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 19, 2026 · fix by Oct 19, 2026 overdue · rent impairing · Violation #19307225
  • C
    Broken doors or locksProvide ready access to buildings heating system locked boiler room at boiler roomIssued Oct 16, 2026 · fix by Oct 22, 2026 overdue · Violation #19297656
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 16, 2026 · fix by Oct 22, 2026 overdue · Violation #19300565
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at northIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19296419
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of tv blocking fire escape window at south wall in the 2nd room from eastIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296418
  • B
    MoldTrace and repair the source and abate the visible mold condition observed greated than 10 sq ft at south wall and ceiling in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19297097
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19297096
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 15, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19297095
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditoner at 5th story balcony at 2nd stack from south at…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19296422
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19296411
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditions at 4th story balcony at 1st stack from south at east…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19296421
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east at northIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19296420
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective latch set at fire door leading to north yard at public hall, 1st storyIssued Oct 14, 2026 · fix by Oct 28, 2026 overdue · Violation #19296427
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19296428
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19296412
  • C
    Missing window guards& 309 m/d law abate the nuisance consisting of window guard installed at fire escape window at 1st window from south at east in the bathroomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19296413
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 14, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19296410
  • B
    Broken doors or locksProvide acceptable latch set at door that allows re-entry to public hall at 2nd public hall bulkhead from east, 5th story, section ''a-c''Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19296432
  • C
    Broken doors or locksRemove the illegal fastening panic bar device installed at door at 2nd public hall bulkhead from east, 5th story, section ''a-c''Issued Oct 14, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19296431
  • C
    Other repairsProperly repair with similar material the broken or defective marble saddle in the bathroomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19296414
  • B
    Broken doors or locksProvide acceptable latch set at door that allows re-entry to public hall at 1st public hall bulkhead from east, 5th story, section ''d-f''Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19296430
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19296415
  • C
    Broken doors or locksRemove the illegal fastening panic bar device installed at door at 1st public hall bulkhead from east, 5th story, section ''d-f''Issued Oct 14, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19296429
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 1st storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19296425
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19296424
  • B
    Other repairsFire egress defective. remove the obstruction in fireproof passageway refuse and construction materials at fire passage wayIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19296423
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19296416
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 14, 2026 · fix by Nov 9, 2026 overdue · Violation #19296417
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · rent impairing · Violation #19291486
  • B
    Other repairsReplace with new the missing escutcheon plate at ceiling in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19277766
  • B
    Other repairsProperly repair with similar material the broken or defective marble saddle in the entranceIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19277765
  • B
    Other repairsProperly repair or replace the broken or defective cabinet draw in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19277772
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19277771
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19277770
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch lock and assemblies at apartment entrance door in the entranceIssued Oct 8, 2026 · fix by Oct 22, 2026 overdue · Violation #19277775
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19277764
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19277763
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective hinges at door leading to west yard at public hall, 1st storyIssued Oct 8, 2026 · fix by Oct 22, 2026 overdue · Violation #19277778
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance door in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19277774
  • B
    Broken doors or locksRemove the illegal fastening consisting of panic bar installed on roof door that do not allow re entry from roof to public hall. at 1st public hall from north,…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19277762
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective calking around bathtub in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19277768
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and west wall in the 3rd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19277767
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19277777

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1142017
312018
992019
342020
752021
392022
892023
642024
362025
1512026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,182 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.