Housing violations · Kingsbridge Heights-Van Cortlandt Village
2734 Sedgwick Avenue, Bronx
10468 · 58 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
22 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks27
- Other repairs24
- Peeling paint and plaster22
- Lead paint12
- No heat or hot water8
- Leaks and water damage8
- Plumbing, sinks and toilets4
- Roaches4
- Mold4
- Missing smoke or CO detector3
- Mice or rats3
- Missing window guards2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 26 closed · NYC typical: 87 days
from 20 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelin enamel finish by method of reglazing at bathtub in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19355291
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash at 2nd window from north at east in the 1st room from east at northIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19355292
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19355293
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19175759
- CBroken doors or locksRemove the illegal fastening consisting of unacceptable two motions locking device installed at building entrance door at 2ndIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · rent impairing · Violation #19175764
- BBroken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty motise lock and assemblies at building entrance door at 2nd…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175762
- CBroken doors or locksRemove the illegal fastening consisting of unacceptable two motions locking device installed at building entrance door at 2ndIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · rent impairing · Violation #19175761
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175760
- CBroken doors or locksProperly repair or replace the broken or defective glass pane at building entrance door at 2nd storyIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19175763
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at fire escape at west exterior wall at…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175765
- BBroken doors or locksRemove the illegal fastening consisting of unacceptable electromagnetic locking device installed at building entrance door , 1st storyIssued May 22, 2026 · fix by Jun 26, 2026 overdue · rent impairing · Violation #18946837
- CBroken doors or locksProperly repair or replace the broken or defective locks and assembly at building entrance door , 1st storyIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · Violation #18660434
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 26, 2026 · fix by Jan 25, 2026 overdue · rent impairing · Violation #18594653
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 26, 2026 · fix by Jan 24, 2026 overdue · rent impairing · Violation #18590275
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 26, 2026 · fix by Jan 25, 2026 overdue · rent impairing · Violation #18594654
- BOther repairsProperly repair or replace the broken or defective intercom /bell buzzer system in the entire apartmentIssued Sep 15, 2025 · fix by Oct 20, 2025 overdue · Violation #18226278
- BOther repairsProperly repair with similar material the broken or defective the commercial tile floor in the kitchenIssued Sep 15, 2025 · fix by Oct 20, 2025 overdue · Violation #18226280
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective rotted wood cabinet under the sink in the kitchenIssued Sep 15, 2025 · fix by Oct 20, 2025 overdue · Violation #18226279
- CBroken doors or locksProvide heavy duty lock set at building entrance door , 1st storyIssued May 12, 2025 · fix by May 18, 2025 overdue · Violation #17889924
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north, west and east walls in the 2nd private hallway from eastIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861716
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st private hallway from eastIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861714
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyerIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861713
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east and west walls in the kitchenIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861712
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and east and west walls in the kitchenIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861711
- BBroken doors or locksProperly repair or replace the broken or defective door in the 3rd room from east at northIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861710
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861709
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south and west wall in the 2nd room from eastIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861708
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 3rd room from east at northIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861707
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north, west and east walls in the 2nd private hallway from eastIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861717
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north, west and south walls in the bathroomIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861718
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from eastIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861721
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861722
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861723
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 1, 2025 · fix by May 27, 2025 overdue · Violation #17861724
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 1, 2025 · fix by May 27, 2025 overdue · Violation #17861725
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the 3rd room from east at southIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861715
- BBroken doors or locksRefit door in the entranceIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17861727
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 1, 2025 · fix by May 15, 2025 overdue · Violation #17872797
- CNo heat or hot waterProvide hot water at all hot water fixtures in the kitchenIssued Apr 16, 2025 · fix by Apr 16, 2025 overdue · rent impairing · Violation #17828712
- BBroken doors or locksRefit door in the entranceIssued Apr 1, 2025 · fix by May 6, 2025 overdue · Violation #17791238
- CBroken doors or locksReplace with new the missing heavy duty lock and assembly at building entrance door , 1st storyIssued Mar 6, 2025 · fix by Mar 12, 2025 overdue · Violation #17739807
- CBroken doors or locksProvide heavy duty lock and assembly at building entrance door , 1st storyIssued Jan 28, 2025 · fix by Feb 3, 2025 overdue · Violation #17651760
- CBroken doors or locksRemove the illegal fastening electromagnetic lock at building entrance door , 1st storyIssued Jan 28, 2025 · fix by Feb 3, 2025 overdue · rent impairing · Violation #17651759
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from eastIssued Dec 17, 2024 · fix by Jan 21, 2025 overdue · Violation #17563217
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sqft at ceiling and all walls in the bathroomIssued Dec 17, 2024 · fix by Jan 12, 2025 overdue · Violation #17563210
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color wallsand ceiling in the foyerIssued Dec 17, 2024 · fix by Jan 21, 2025 overdue · Violation #17563212
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Dec 17, 2024 · fix by Dec 23, 2024 overdue · Violation #17563215
- BBroken doors or locksProvide heavy duty lock and latch set at door from street to 1st story public hallIssued Dec 17, 2024 · fix by Jan 21, 2025 overdue · Violation #17563223
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 17, 2024 · fix by Jan 12, 2025 overdue · Violation #17563220
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west and east walls in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17390189
- BPlumbing, sinks and toiletsRepair the broken or defective connection at wash basin drain pipe in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17390188
- BBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance , 1st storyIssued Jul 16, 2024 · fix by Aug 20, 2024 overdue · Violation #17122204
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jul 11, 2024 · fix by Aug 15, 2024 overdue · Violation #17112768
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Jul 11, 2024 · fix by Aug 15, 2024 overdue · Violation #17112770
- CBroken doors or locksRemove the illegal fastening electromagnetic lock at building entrance door , 1st storyIssued Jul 5, 2024 · fix by Jul 11, 2024 overdue · rent impairing · Violation #17096629
- CBroken doors or locksProvide heavy duty lock at building entrance door , 1st storyIssued Jul 5, 2024 · fix by Jul 11, 2024 overdue · Violation #17096624
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 13, 2024 · fix by Jul 9, 2024 overdue · Violation #17042993
- BMoldTrace and repair the source and abate the visible mold condition approximately 1o sq ft at ceiling and 5 sq ft at north wall in the bathroomIssued Jun 13, 2024 · fix by Jul 18, 2024 overdue · Violation #17042994
- BOther repairsProperly repair with similar material the broken or defective ceramic tiled floor in the bathroomIssued Jun 13, 2024 · fix by Jul 18, 2024 overdue · Violation #17042995
- BMoldTrace and repair the source and abate the visible mold condition approx. 3 sq. feet at ceiling in the bathroomIssued Apr 26, 2024 · fix by May 31, 2024 overdue · Violation #16937077
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.