Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mount Eden-Claremont (West)

1455 Sheridan Avenue, Bronx

10457 · 86 apartments · 6 stories · City Council district 16

By · Updated · Data from NYC HPD

C
17open immediately hazardous violations · 20 per 100 apartments
B21Hazardous, open
A9Non-hazardous, open
!35Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

Who owns and manages it

Owning company1455 LLC
Landlord (head officer or owner)Aaron Bauer

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    11
  2. Roaches
    9
  3. Mice or rats
    8
  4. Mold
    7
  5. Plumbing, sinks and toilets
    3
  6. Lead paint
    3
  7. Leaks and water damage
    2
  8. Broken doors or locks
    2
  9. Missing smoke or CO detector
    1
  10. Peeling paint and plaster
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C81 days
from 81 closed · NYC typical: 87 days
B85 days
from 113 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19297380
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19297384
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19297382
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19297381
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19287070
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at vestibule door at basementIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19287072
  • B
    Broken doors or locksProvide approved glass in the place of vestibule door at basementIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19287073
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19287068
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19287067
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 27, 2026 · fix by Aug 22, 2026 overdue · Violation #19093268
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 27, 2026 · fix by Aug 22, 2026 overdue · Violation #19093269
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq .ft at ceiling in the bathroomIssued Jun 9, 2026 · fix by Jul 14, 2026 overdue · Violation #18996470
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 13, 2026 · fix by May 7, 2026 overdue · Violation #18786052
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glazed finish at bathtub in the bathroomIssued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18780810
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish glaze at bathtub in the bathroomIssued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18618954
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 1, 2025 · fix by Jul 27, 2025 overdue · Violation #18060691
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 1, 2025 · fix by Jul 27, 2025 overdue · Violation #18060692
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at north wall in the bathroomIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17817826
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17774886
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17774885
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Dec 9, 2024 · fix by Jan 13, 2025 overdue · Violation #17532596
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 9, 2024 · fix by Jan 4, 2025 overdue · Violation #17532597
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 1st room from eastIssued Dec 9, 2024 · fix by Jan 13, 2025 overdue · Violation #17532598
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from eastIssued Dec 9, 2024 · fix by Jan 13, 2025 overdue · Violation #17532599
  • B
    Other repairsProperly repair or replace the broken or defective lower sash spring balance at fire escape window in the 4th room from eastIssued Dec 9, 2024 · fix by Jan 13, 2025 overdue · Violation #17532600
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq ft at south wall in the bathroomIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17435923
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling less than 10sq foot in the kitchenIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17435924
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Oct 31, 2024 · fix by Nov 24, 2024 overdue · Violation #17391264
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 12, 2024 · fix by Oct 8, 2024 overdue · Violation #17260041
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 12, 2024 · fix by Oct 8, 2024 overdue · Violation #17260042
  • B
    Other repairsProperly repair with similar material the broken or defective warped wood floor ( walk area ) in the private hallwayIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187095
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 6th story balcony at 1st fire escape…Issued Jul 5, 2024 · fix by Aug 9, 2024 overdue · Violation #17096266
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Mar 10, 2022 · fix by Apr 3, 2022 overdue · Violation #15015877
  • C
    Mice or ratsAbate the infestation consisting of miceIssued Nov 1, 2021 · fix by Nov 27, 2021 overdue · Violation #14657498
  • C
    RoachesAbate the infestation consisting of roachesIssued Nov 1, 2021 · fix by Nov 27, 2021 overdue · Violation #14657499
  • B
    Mice or ratsAbate the nuisance consisting of miceIssued May 16, 2018 · fix by Jun 20, 2018 overdue · Violation #12383851
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Nov 13, 2017 · fix by Dec 18, 2017 overdue · Violation #12063323
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Nov 13, 2017 · fix by Dec 18, 2017 overdue · Violation #12063324

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

292017
272018
112019
142020
292021
422022
292023
1372024
512025
642026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 575 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.