On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs31
- Lead paint20
- Peeling paint and plaster16
- Roaches15
- Mice or rats13
- Missing smoke or CO detector10
- Broken doors or locks10
- Plumbing, sinks and toilets7
- Mold6
- Leaks and water damage5
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 111 closed · NYC typical: 87 days
from 191 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325084
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325083
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19325082
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19325081
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at sink in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19325089
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311870
- BOther repairsProperly repair with similar material the broken or defective wood floor at first and second closets at north wall in the 1st room from east at southIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311875
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311869
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective enamel glaze surface finish at bathtub in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311868
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective inoperable hinges in the entranceIssued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19311879
- BOther repairsProperly repair or replace the broken or defective wall cabinet at north wall in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311876
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311877
- BOther repairsProperly repair with similar material the broken or defective wood floor at north closet in the private hallwayIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311878
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311874
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311871
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311873
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at sink in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311872
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19289002
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19289003
- BElectrical problemsProvide cover at electrical outlet at south wall at public hall, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19266547
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19266546
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19266545
- BOther repairsAbate the nuisance consisting of pests. evidence of observed flies in the entire apartmentIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19266543
- BOther repairsProperly repair with similar material the broken or defective cracked hardwood floor in the 1st room from east at northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19266541
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19266540
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19266539
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19266542
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19266544
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish glaze at bathtub in the bathroomIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19091321
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 23, 2026 · fix by Aug 16, 2026 overdue · Violation #19098072
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 23, 2026 · fix by Aug 16, 2026 overdue · Violation #19098067
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 23, 2026 · fix by Aug 16, 2026 overdue · Violation #19098071
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jul 23, 2026 · fix by Aug 16, 2026 overdue · Violation #19098070
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jul 23, 2026 · fix by Aug 16, 2026 overdue · Violation #19098068
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19089614
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jun 9, 2026 · fix by Jun 13, 2026 overdue · Violation #18995989
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jun 9, 2026 · fix by Jun 13, 2026 overdue · Violation #18995990
- BLeaks and water damageRepair the roof so that it will not leak at 1st and 2nd window casings from west at north wall in the 1st room from eastIssued Apr 7, 2026 · fix by May 12, 2026 overdue · rent impairing · Violation #18766372
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · rent impairing · Violation #18766377
- BOther repairsProperly secure the loose escutcheon plate at riser top at ceiling in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766378
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color cracks, and holes at 1st and 2nd window casings from west at north wall in the…Issued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766373
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color cracks at west, and south walls ceiling and floor board in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766376
- BMoldRepair the broken or defective plastered surfaces and paint in a uniform color 1/2'' crack at north wall floor board molding in the 1st room from eastIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18766374
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from east at northIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18632224
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at southIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18509063
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchenIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18509064
- CMoldTrace and repair the source and abate the visible mold condition approx. 7 sq. ft. at west wall and approx. 3 sq. ft. at north wall in the 1st room from north…Issued Oct 14, 2025 · fix by Nov 9, 2025 overdue · Violation #18299898
- CMoldTrace and repair the source and abate the visible mold condition approx. 5 sqw. ft. at ceiling, approx. 5 sq. ft. at north wall and approx. 15 sq. t. at east…Issued Oct 14, 2025 · fix by Nov 9, 2025 overdue · Violation #18299897
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18293219
- BBroken doors or locksProperly repair or replace the broken or defective lock and assembly at door in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18293220
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18293217
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Sep 22, 2025 · fix by Oct 27, 2025 overdue · Violation #18246034
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 16, 2025 · fix by Aug 11, 2025 overdue · Violation #18099375
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 16, 2025 · fix by Aug 11, 2025 overdue · Violation #18099376
- COther repairsProperly repair or replace the broken or defective glass pane at upper window sash at west wall in the 4th room from east at southIssued Jul 15, 2025 · fix by Jul 21, 2025 overdue · Violation #18091500
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18091502
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 10, 2025 · fix by Aug 5, 2025 overdue · Violation #18082149
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18082147
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the closet. in the foyerIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18082153
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the bathroomIssued May 23, 2025 · fix by Jun 27, 2025 overdue · Violation #17913437
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year