Housing violations · Longwood
1007 Southern Boulevard, Bronx
10459 · 11 apartments · 5 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs25
- Peeling paint and plaster13
- Broken doors or locks13
- Mice or rats11
- Lead paint11
- Missing smoke or CO detector10
- Plumbing, sinks and toilets6
- Roaches5
- Electrical problems2
- Mold2
- Leaks and water damage1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 19 closed · NYC typical: 87 days
from 21 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19270458
- BOther repairsProperly repair with similar material the broken or defective metal cornice at roof at building frontIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239199
- BOther repairsProperly repair or replace the broken or defective glass pane at skylight , 5th storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216658
- BOther repairsProperly repair with similar material the broken or defective fire retardent material at ceiling , 3rd storyIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19216660
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19216657
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19216656
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19216655
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19216654
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 16, 2026 · fix by Sep 30, 2026 overdue · Violation #19216653
- BOther repairsRemove all encumbrances consisting of gargabe accumulation. at public hall, 1st storyIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · rent impairing · Violation #19216662
- BOther repairsProperly repair with similar material the broken or defective hole in sheet metal at cornice ( building front)Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19020748
- BOther repairsProperly repair with similar material the broken or defective uneven wood floor in the 3rd room from eastIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803254
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803255
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enmal fine by methor of reglaze at bathtub in the bathroomIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803256
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18802944
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 9, 2026 · fix by Mar 7, 2026 overdue · Violation #18627120
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 9, 2026 · fix by Feb 15, 2026 overdue · Violation #18627119
- CBroken doors or locksProvide ready access to buildings heating system boiler room locked at boiler roomIssued Jan 27, 2026 · fix by Feb 2, 2026 overdue · Violation #18596597
- CBroken doors or locksProperly repair or replace the broken or defective locking device at building entrance door at lobby, 1st storyIssued Jan 20, 2026 · fix by Jan 26, 2026 overdue · Violation #18580085
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18580084
- BOther repairsProperly repair with similar material the broken or defective concrete subfloor in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18580082
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 19, 2025 · fix by Jan 12, 2026 overdue · Violation #18521597
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler room, 1st storyIssued Dec 19, 2025 · fix by Dec 25, 2025 overdue · Violation #18513171
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 8, 2025 · fix by Jan 3, 2026 overdue · Violation #18490737
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 17, 2025 · fix by Dec 13, 2025 overdue · Violation #18375911
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 14, 2025 · fix by Dec 10, 2025 overdue · Violation #18367050
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 14, 2025 · fix by Dec 10, 2025 overdue · Violation #18367051
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty lock assembly at building entrance door , 1st storyIssued Nov 10, 2025 · fix by Nov 16, 2025 overdue · Violation #18353610
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assemblies at building entrance door at public hall, 1st storyIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18354994
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18354991
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2025 · fix by Dec 6, 2025 overdue · Violation #18354990
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 23, 2025 · fix by Nov 16, 2025 overdue · Violation #18323630
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 23, 2025 · fix by Nov 16, 2025 overdue · Violation #18323633
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 23, 2025 · fix by Nov 18, 2025 overdue · Violation #18317400
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2025 · fix by Nov 15, 2025 overdue · Violation #18305173
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2025 · fix by Nov 15, 2025 overdue · Violation #18305174
- BOther repairsProvide approved wire mesh at skylight at bulkhead at public hallIssued Sep 15, 2025 · fix by Oct 20, 2025 overdue · Violation #18226328
- CBroken doors or locksProperly repair or replace the broken or defective key operated lock and assembly at building entrance door at public hall, 1st storyIssued Sep 15, 2025 · fix by Sep 21, 2025 overdue · Violation #18226326
- CBroken doors or locksProperly repair or replace the broken or defective glass lite at building entrance door at public hall, 1st storyIssued Sep 15, 2025 · fix by Sep 21, 2025 overdue · Violation #18226327
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 10, 2025 · fix by Mar 8, 2025 overdue · Violation #17681790
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jan 21, 2025 · fix by Jan 25, 2025 overdue · Violation #17640587
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Jan 21, 2025 · fix by Jan 25, 2025 overdue · Violation #17640586
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17553560
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17553559
- BMissing smoke or CO detectorRepair or replace the smoke detector (defective)Issued Sep 15, 2023 · fix by Oct 20, 2023 overdue · Violation #16232965
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). (defective)Issued Sep 15, 2023 · fix by Oct 20, 2023 overdue · Violation #16232963
- BMoldTrace and repair the source and abate the visible mold condition approx 4 sq.ft at ceiling above window casing in the bathroomIssued Jun 21, 2023 · fix by Jul 26, 2023 overdue · Violation #16055656
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · rent impairing · Violation #15730913
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in the 1st room from eastIssued Feb 21, 2023 · fix by Feb 27, 2023 overdue · Violation #15730905
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730907
- BBroken doors or locksProperly repair the broken or defective wood door at south wall in the 2nd room from eastIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730909
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from eastIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730910
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730906
- BOther repairsProperly repair with similar material the broken or defective the vinyl tiles on the floor missing creating trip hazard in the 2nd room from eastIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730903
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730915
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, the north and south wall in the foyerIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730900
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 3rd room from eastIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730911
- COther repairsProperly repair with similar material the broken or defective broken wood floor and hole at the floor ( walking area ) trip hazard in the foyerIssued Feb 21, 2023 · fix by Feb 27, 2023 overdue · Violation #15730898
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from eastIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730899
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the east and south wall in the bathroomIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15730912
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.