Housing violations · Crotona Park East
1228 Southern Boulevard, Bronx
10459 · 8 apartments · 4 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs9
- Roaches8
- Lead paint5
- Missing smoke or CO detector4
- Peeling paint and plaster4
- Broken doors or locks3
- Plumbing, sinks and toilets2
- Mold2
- Leaks and water damage1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 70 closed · NYC typical: 87 days
from 93 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247271
- BBroken doors or locksProperly repair or replace the broken or defective door frame in the 4th room from eastIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247268
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from eastIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19247267
- BOther repairsProperly repair with similar material the broken or defective vinyl floor at floor (cracked, chipped) in the 2nd private hallway from eastIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247269
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247270
- BOther repairsAbate the nuisance consisting of pests. evidence of the flies in the entire apartmentIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247273
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247272
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18972549
- COther repairsProperly repair with similar material the broken or defective wooden sub floor in the foyerIssued Jun 2, 2026 · fix by Jun 8, 2026 overdue · Violation #18972547
- BBroken doors or locksProperly repair with similar material the broken or defective wooden door frame at east in the 5th room from eastIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18972546
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from eastIssued Jun 2, 2026 · fix by Jun 8, 2026 overdue · Violation #18972548
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18972544
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18972545
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Jan 30, 2026 · fix by Mar 6, 2026 overdue · Violation #18602848
- BBroken doors or locksProperly repair or replace the broken or defective door in the bathroomIssued Jan 30, 2026 · fix by Mar 6, 2026 overdue · Violation #18602851
- COther repairsProperly repair or replace the broken or defective upper glass pane at 1st window from south at west in the 5th room from eastIssued Jan 30, 2026 · fix by Feb 5, 2026 overdue · Violation #18602850
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 22, 2025 · fix by Jan 17, 2026 overdue · Violation #18520060
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock on door leading to fire escape in the 3rd room from eastIssued Nov 13, 2025 · fix by Nov 19, 2025 overdue · Violation #18366830
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from eastIssued Nov 13, 2025 · fix by Nov 19, 2025 overdue · Violation #18366808
- BOther repairsReplace with new the missing eschutchen plate at steam riser at ceiling in the bathroomIssued Sep 16, 2025 · fix by Oct 21, 2025 overdue · Violation #18227682
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2025 · fix by Oct 12, 2025 overdue · Violation #18227680
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 16, 2025 · fix by Oct 21, 2025 overdue · Violation #18227684
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Sep 16, 2025 · fix by Oct 21, 2025 overdue · Violation #18227679
- BOther repairsProperly repair or replace the broken or defective at light fixture at ceiling in the 1st room from eastIssued Sep 16, 2025 · fix by Oct 21, 2025 overdue · Violation #18227676
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 24, 2025 · fix by Apr 19, 2025 overdue · Violation #17761880
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 7, 2025 · fix by Mar 5, 2025 overdue · Violation #17683882
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 5, 2025 · fix by Mar 3, 2025 overdue · Violation #17676753
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 11, 2024 · fix by Jan 6, 2025 overdue · Violation #17544864
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Aug 23, 2024 · fix by Sep 16, 2024 overdue · Violation #17225474
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 19, 2024 · fix by Sep 14, 2024 overdue · Violation #17200136
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from northIssued Aug 7, 2024 · fix by Sep 11, 2024 overdue · Violation #17175099
- BMoldTrace and repair the source and abate the visible mold condition at east wall at bathtub ( approx 3 sqft) in the bathroomIssued Jun 28, 2024 · fix by Aug 2, 2024 overdue · Violation #17088300
- BMoldTrace and repair the source and abate the visible mold condition approx 7 sq ft at ceiling in the bathroomIssued Jun 21, 2024 · fix by Jul 26, 2024 overdue · Violation #17070761
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 21, 2024 · fix by Jun 16, 2024 overdue · Violation #16993248
- COther repairsProperly repair with similar material the broken or defective cracked/ lifting faux wood flooring at public hall, 2nd storyIssued Feb 29, 2024 · fix by Mar 6, 2024 overdue · Violation #16707748
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Aug 2, 2023 · fix by Aug 26, 2023 overdue · Violation #16138297
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 15, 2023 · fix by Jun 10, 2023 overdue · Violation #15981340
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.