Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Parkchester

2125 St Raymonds Avenue, Bronx

10462 · 66 apartments · 8 stories · City Council district 18

By · Updated · Data from NYC HPD

C
24open immediately hazardous violations · 36 per 100 apartments
B10Hazardous, open
A8Non-hazardous, open
!42Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyTHE PARKCHESTER SOUTH CONDOMINIUM, INC.
Landlord (head officer or owner)Juan Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    14
  2. Peeling paint and plaster
    9
  3. Leaks and water damage
    5
  4. Other repairs
    4
  5. Roaches
    3
  6. No heat or hot water
    3
  7. Broken doors or locks
    2
  8. Plumbing, sinks and toilets
    1
  9. Mold
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C77 days
from 22 closed · NYC typical: 87 days
B95 days
from 8 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Other repairsProvide ready access to buildings heating system boiler room is no located on premises at boiler roomIssued Oct 16, 2026 · fix by Oct 22, 2026 overdue · Violation #19300840
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 28, 2026 · fix by Jun 23, 2026 overdue · Violation #18959758
  • B
    Other repairsProperly repair or replace the broken or defective radiator cover in the 1st room from northIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18707204
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective bathtub with porcelain enamel by method of reglaze in the bathroomIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18707205
  • B
    Other repairsProperly repair with similar material the broken or defective wood saddle at entrance in the bathroomIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18707206
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Oct 30, 2025 · fix by Dec 4, 2025 overdue · Violation #18333312
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Oct 30, 2025 · fix by Nov 5, 2025 overdue · Violation #18333314
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak behind east wall in the 2nd room from eastIssued Oct 30, 2025 · fix by Dec 4, 2025 overdue · Violation #18333308
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18158671
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2025 · fix by Sep 9, 2025 overdue · Violation #18158670
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Apr 18, 2025 · fix by May 12, 2025 overdue · Violation #17841458
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17698320
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at eastIssued Sep 16, 2024 · fix by Sep 22, 2024 overdue · Violation #17251328
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Mar 19, 2024 · fix by Mar 25, 2024 overdue · Violation #16752906
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 29, 2023 · fix by Jul 25, 2023 overdue · Violation #16065852
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 3rd room from northIssued Jun 29, 2023 · fix by Aug 3, 2023 overdue · Violation #16065848
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 1st room from northIssued Jun 29, 2023 · fix by Aug 3, 2023 overdue · Violation #16065851
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 8, 2023 · fix by May 5, 2023 overdue · rent impairing · Violation #15969237
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entranceIssued Mar 16, 2023 · fix by Mar 16, 2023 overdue · rent impairing · Violation #15775470
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entranceIssued Mar 16, 2023 · fix by Mar 16, 2023 overdue · rent impairing · Violation #15775471
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall approx. 1 sq ft in the bathroomIssued Feb 3, 2023 · fix by Mar 10, 2023 overdue · Violation #15705020
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 9, 2021 · fix by Mar 13, 2021 overdue · Violation #14061476
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 9, 2021 · fix by Mar 13, 2021 overdue · Violation #14061475
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935483
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935485
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935484
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935481
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935480
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935489
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935488
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935487
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935486
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 15, 2020 · fix by Dec 19, 2020 overdue · Violation #13935482
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jul 14, 2020 · fix by Jul 18, 2020 overdue · Violation #13722000

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

32019
142020
22021
182022
152023
62024
292025
202026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 111 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.