Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Soundview-Bruckner-Bronx River

1124 Stratford Avenue, Bronx

10472 · 40 apartments · 4 stories · City Council district 18

By · Updated · Data from NYC HPD

C
26open immediately hazardous violations · 65 per 100 apartments
B30Hazardous, open
A9Non-hazardous, open
!49Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company1124 S LLC
Landlord (head officer or owner)David Tennenbaum

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    12
  2. Other repairs
    10
  3. Peeling paint and plaster
    8
  4. Mold
    7
  5. Lead paint
    7
  6. Plumbing, sinks and toilets
    6
  7. Missing smoke or CO detector
    4
  8. Mice or rats
    3
  9. Roaches
    3
  10. No heat or hot water
    3
  11. Leaks and water damage
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C75 days
from 91 closed · NYC typical: 87 days
B94 days
from 194 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365496
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365495
  • B
    Plumbing, sinks and toiletsRepair the flushing apparatus and maintain same so as to flush effectively the water closet at toilet in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · rent impairing · Violation #19365494
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19365493
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19340623
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19340624
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19340625
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19340619
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at north wall in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19340620
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color aat ceiling and all walls in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19340621
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19340628
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19340627
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside closet in the 2nd room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19340626
  • B
    Other repairsReplace with new the missing escutcheon plate at ceiling in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19340622
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ac unit (protruding more than 6 inched) at 4th story balcony at…Issued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19030766
  • C
    Broken doors or locksRemove device preventing door from being self-closing door sweeper in the entranceIssued Mar 25, 2026 · fix by Apr 8, 2026 overdue · Violation #18739166
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at building entrance door , 1st storyIssued Jan 9, 2026 · fix by Jan 15, 2026 overdue · Violation #18563684
  • C
    Broken doors or locksProperly repair or replace the broken or defective heavy duty moertse lock at building entrance door , 1st storyIssued Jan 5, 2026 · fix by Jan 11, 2026 overdue · Violation #18550681
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 30, 2025 · fix by Dec 27, 2025 overdue · rent impairing · Violation #18537415
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch and its assembly at building entrance door , 1st storyIssued Dec 30, 2025 · fix by Jan 5, 2026 overdue · Violation #18537393
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch in the entranceIssued Dec 5, 2025 · fix by Dec 19, 2025 overdue · Violation #18483244
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18390385
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st storyIssued Nov 3, 2025 · fix by Nov 9, 2025 overdue · Violation #18346136
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at building entrance door , 1st storyIssued Jul 10, 2025 · fix by Jul 16, 2025 overdue · Violation #18082552
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at building entrance door , 1st storyIssued May 29, 2025 · fix by Jun 4, 2025 overdue · Violation #17928465
  • B
    Other repairsProperly repair with similar material the broken or defective sagging wood subfloor underneath the floor in the 2nd room from northIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17866882
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of sensor installed on light fixture at ceiling at 4th story public hallIssued May 1, 2025 · fix by May 7, 2025 overdue · Violation #17859471
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 4, 2025 · fix by Apr 4, 2025 overdue · rent impairing · Violation #17804912
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 4, 2025 · fix by Apr 4, 2025 overdue · rent impairing · Violation #17804911
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling, east and south wall in the bathroomIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17655960
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of bunk beds and house hold items blockinmg window to fire escape in the 1st room from northIssued Oct 3, 2024 · fix by Oct 9, 2024 overdue · Violation #17322384
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 5, 2024 · fix by Oct 1, 2024 overdue · Violation #17244201
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 3, 2024 · fix by Sep 29, 2024 overdue · Violation #17236052
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 20 sq. ft. of mold at north shower wall in the bathroomIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17227322
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Jul 26, 2024 · fix by Aug 30, 2024 overdue · Violation #17136926
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 1st room from northIssued Jul 8, 2024 · fix by Aug 12, 2024 overdue · Violation #17098136
  • C
    MoldTrace and repair the source and abate the visible mold condition approx 25 sq.ft. at east wall, approx 10 sq.ft. at ceiling, approx 10 sq.ft. at north wall,…Issued May 31, 2024 · fix by Jun 26, 2024 overdue · Violation #17008482
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroomIssued May 31, 2024 · fix by Jul 5, 2024 overdue · Violation #17008490
  • B
    MoldTrace and repair the source and abate the visible mold condition in closet at west wall approx 10 sq ft in the 1st room from eastIssued Mar 21, 2024 · fix by Apr 25, 2024 overdue · Violation #16758376
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Feb 2, 2024 · fix by Mar 8, 2024 overdue · Violation #16640841
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Feb 2, 2024 · fix by Mar 8, 2024 overdue · Violation #16640836
  • B
    MoldTrace and repair the source and abate the visible mold condition at east wall approx 10 sq. ft and south wall approx 5 sq. ft in the bathroomIssued Feb 2, 2024 · fix by Mar 8, 2024 overdue · Violation #16640835
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Feb 2, 2024 · fix by Mar 8, 2024 overdue · Violation #16640840
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Feb 2, 2024 · fix by Mar 8, 2024 overdue · Violation #16640837
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 19, 2023 · fix by Oct 24, 2023 overdue · Violation #16234981
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 23, 2021 · fix by Jul 19, 2021 overdue · Violation #14372192
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 23, 2021 · fix by Jul 19, 2021 overdue · Violation #14372193
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 23, 2021 · fix by Jul 28, 2021 overdue · Violation #14372194
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 15, 2021 · fix by Jul 20, 2021 overdue · Violation #14388614
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 15, 2021 · fix by Jul 20, 2021 overdue · Violation #14388631
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Jun 4, 2021 · fix by Jun 8, 2021 overdue · Violation #14364261
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Jun 4, 2021 · fix by Jun 8, 2021 overdue · Violation #14364594
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jun 4, 2021 · fix by Jun 8, 2021 overdue · Violation #14364288
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued May 21, 2021 · fix by May 25, 2021 overdue · Violation #14349973
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain finish at bathtub in the bathroomIssued Sep 9, 2020 · fix by Oct 14, 2020 overdue · Violation #13803153
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective at apartment entranceIssued Oct 18, 2019 · fix by Nov 8, 2019 overdue · Violation #13342429

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

132017
562018
1222019
142020
452021
1242022
352023
1202024
1362025
802026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 851 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.