Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Highbridge

993 Summit Avenue, Bronx

10452 · 9 apartments · 4 stories · City Council district 8

By · Updated · Data from NYC HPD

C
12open immediately hazardous violations · 133 per 100 apartments
B12Hazardous, open
A6Non-hazardous, open
!29Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyICER OF 993 SUMMIT AVE LLC
Landlord (head officer or owner)Joseph Jemal

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    14
  2. Peeling paint and plaster
    4
  3. Mold
    3
  4. Roaches
    3
  5. Leaks and water damage
    3
  6. Plumbing, sinks and toilets
    2
  7. Mice or rats
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C88 days
from 321 closed · NYC typical: 87 days
B117 days
from 295 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition at north wall more than 18 sq ft in the kitchenIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19215231
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19215238
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 15, 2026 · fix by Oct 11, 2026 overdue · Violation #19215225
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19215220
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19215218
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak concealed leak at ceiling in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19215206
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak concealed leak at ceiling in the kitchenIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19215236
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19215203
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 15, 2026 · fix by Oct 11, 2026 overdue · Violation #19215226
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19215200
  • B
    Other repairsReplace with new the missing intercom system at building front entrance at public hall, 1st storyIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18617578
  • C
    Other repairsReplace with new the missing riser pipe/ radiator in the 1st room from north at westIssued Feb 4, 2026 · fix by Feb 10, 2026 overdue · Violation #18617669
  • C
    Other repairsProperly repair with similar material the broken or defective loose brick and mortar joints at all walls in inner court yard yardIssued Feb 4, 2026 · fix by Feb 10, 2026 overdue · Violation #18617632
  • C
    Other repairsReplace with new the missing riser pipe / radiator missing in the 1st room from north at westIssued Jan 23, 2026 · fix by Jan 29, 2026 overdue · Violation #18590964
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardent material at ceiling at boiler roomIssued Jan 20, 2026 · fix by Jan 26, 2026 overdue · Violation #18585349
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at basementIssued Jan 20, 2026 · fix by Jan 26, 2026 overdue · Violation #18584113
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain reglaze at bathtub in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18584103
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 12 sq feet at ceiling, east, south, west wall and window frame in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18584100
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18578516
  • C
    Other repairsCleanse and disinfect to the satisfaction of this department after removing the accumulation of rubbish and unsanitary water at south court yardIssued Nov 6, 2025 · fix by Nov 12, 2025 overdue · rent impairing · Violation #18352958
  • B
    Other repairsProperly repair with similar material the broken or defective porcelain glazing at tub enamel in the bathroomIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18276510
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 23, 2025 · fix by Oct 19, 2025 overdue · Violation #18245589
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 23, 2025 · fix by Oct 19, 2025 overdue · Violation #18245591
  • C
    Other repairsProperly repair with similar material the broken or defective loose brick and eroded mortar joints at back wall at yardIssued Aug 7, 2024 · fix by Aug 13, 2024 overdue · Violation #17166097

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

292017
882018
622019
72020
902021
842022
2162023
1762024
1782025
1322026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,258 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.