Housing violations · Soundview-Bruckner-Bronx River
1459 Taylor Avenue, Bronx
10460 · 30 apartments · 5 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks13
- Lead paint11
- Other repairs6
- Peeling paint and plaster4
- Missing smoke or CO detector2
- Roaches2
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 49 closed · NYC typical: 87 days
from 51 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BBroken doors or locksProperly repair or replace the broken or defective latch and assembly at building vestibule door (from vestibule to public hall) , 1st storyIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19232523
- BOther repairsProperly secure the loose handrail at north wall at public hall, 1st storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212674
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19111850
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19111849
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler room at northIssued Jul 29, 2026 · fix by Aug 4, 2026 overdue · Violation #19101285
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Jul 20, 2026 · fix by Jul 26, 2026 overdue · Violation #19073766
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 15, 2026 · fix by Aug 10, 2026 overdue · Violation #19073756
- CBroken doors or locksProvide ready access to buildings heating system no access. basement door is locked and there no contact information for the super. at boiler roomIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · Violation #19060180
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 10, 2026 · fix by Aug 5, 2026 overdue · Violation #19060179
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule , 1st storyIssued Jun 25, 2026 · fix by Jul 9, 2026 overdue · Violation #19025328
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued May 18, 2026 · fix by May 24, 2026 overdue · Violation #18935718
- BPlumbing, sinks and toiletsRepair the broken or defective connection at drain pipe at sink basecabinet in the kitchenIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18935719
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 17, 2025 · fix by Nov 23, 2025 overdue · Violation #18370328
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802070
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802065
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802066
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802086
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802083
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802087
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802084
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802082
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802069
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 2, 2025 · fix by Apr 26, 2025 overdue · Violation #17802067
- BBroken doors or locksReplace with new the missing missing latch set and assemblies at vestibule door, from vestibule to public hall, 1st storyIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17791832
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 31, 2025 · fix by Feb 6, 2025 overdue · Violation #17663269
- CBroken doors or locksReplace with new the missing latch and assembly at vestibule door to public hall , 1st storyIssued Jan 14, 2025 · fix by Jan 20, 2025 overdue · Violation #17618358
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint peeling paint at north wall in north 4th sty rear northIssued Nov 5, 1990 · fix by Nov 25, 1990 overdue · Violation #810293
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.