Housing violations · Soundview-Bruckner-Bronx River
1580 Thieriot Avenue, Bronx
10460 · 51 apartments · 5 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
1 open violation is marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint17
- Peeling paint and plaster17
- Other repairs9
- Mice or rats4
- Leaks and water damage2
- Missing smoke or CO detector2
- Mold2
- Broken doors or locks1
- Roaches1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 33 closed · NYC typical: 84 days
from 50 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 1, 2026 · fix by Oct 25, 2026 overdue · Violation #19268048
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 1, 2026 · fix by Oct 25, 2026 overdue · Violation #19268047
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19240101
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19240104
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19240103
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19240102
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18924108
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18924107
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18924106
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18924105
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18924109
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18924110
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18924111
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18899163
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18899153
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18899164
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18899158
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued May 1, 2026 · fix by May 5, 2026 overdue · Violation #18853885
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued May 1, 2026 · fix by May 5, 2026 overdue · Violation #18853886
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 18, 2026 · fix by Apr 11, 2026 overdue · Violation #18724387
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 18, 2026 · fix by Apr 11, 2026 overdue · Violation #18724386
- BOther repairsReplace with new the missing escutcheon at riser in the bathroom in the bathroomIssued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16973777
- CMoldTrace and repair the source and abate the visible mold condition approx at north wall 15 sq ft and west wall 8 sq ft and south wall 7 sq ft in the bathroomIssued May 16, 2024 · fix by Jun 11, 2024 overdue · Violation #16973775
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling at south wall in the 1st room from north at eastIssued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16973774
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall 1st and 2nd window sill in the 3rd room from eastIssued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16973784
- BOther repairsProperly repair with similar material the broken or defective the ceramic broken tiles on the floor in the bathroomIssued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16973783
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color 1st and 2nd window at east wall the casin and the header in the 1st room from…Issued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16973782
- CBroken doors or locksRemove the illegal fastening lockable slide bolt at apartment entrance door in the entranceIssued May 16, 2024 · fix by May 22, 2024 overdue · rent impairing · Violation #16973785
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window sill in the 1st room from eastIssued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16973781
- BOther repairsProperly repair with similar material the broken or defective broken ceramic floor tiles in the kitchenIssued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16973780
- BOther repairsProperly repair with similar material the broken or defective broken ceramic tiles in the kitchenIssued May 16, 2024 · fix by Jun 20, 2024 overdue · Violation #16973778
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from eastIssued Feb 29, 2024 · fix by Mar 6, 2024 overdue · Violation #16708318
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2023 · fix by Dec 2, 2023 overdue · Violation #16369092
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 6, 2023 · fix by Dec 2, 2023 overdue · Violation #16369093
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 28, 2019 · fix by Oct 2, 2019 overdue · Violation #13245596
- BPlumbing, sinks and toiletsProperly secure the loose wash basin and base cabinet in the bathroomIssued Jul 31, 2018 · fix by Sep 4, 2018 overdue · Violation #12502461
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Jul 23, 2018 · fix by Aug 27, 2018 overdue · Violation #12487447
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Feb 13, 2018 · fix by Mar 20, 2018 overdue · Violation #12236540
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Jan 30, 2018 · fix by Mar 6, 2018 overdue · Violation #12214688
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.