Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mount Hope

2120 Tiebout Avenue, Bronx

10457 · 76 apartments · 5 stories · City Council district 15

By · Updated · Data from NYC HPD

C
122open immediately hazardous violations · 161 per 100 apartments
B289Hazardous, open
A64Non-hazardous, open
!425Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

32 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company2120 Tiebout LLC
Landlord (head officer or owner)Ian Lagowitz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    151
  2. Peeling paint and plaster
    61
  3. Broken doors or locks
    56
  4. Missing smoke or CO detector
    45
  5. Roaches
    31
  6. Leaks and water damage
    31
  7. Lead paint
    30
  8. Plumbing, sinks and toilets
    22
  9. Mice or rats
    20
  10. No heat or hot water
    16
  11. Mold
    11
  12. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C126 days
from 219 closed · NYC typical: 84 days
B107 days
from 242 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Notice not sent yet · inspected Nov 13, 2026 · Violation #19373999
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentNotice not sent yet · inspected Nov 13, 2026 · Violation #19373998
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at southNotice not sent yet · inspected Nov 13, 2026 · Violation #19373449
  • B
    Other repairsProperly repair or replace the broken or defective lower sash spring balance at the 1st window from east at south in the 2nd room from eastNotice not sent yet · inspected Nov 13, 2026 · Violation #19373450
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 4th room from east at southNotice not sent yet · inspected Nov 13, 2026 · Violation #19373451
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayNotice not sent yet · inspected Nov 13, 2026 · Violation #19373452
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, and west walls in the 4th room from east at northNotice not sent yet · inspected Nov 13, 2026 · Violation #19373453
  • B
    Other repairsProperly repair or replace the broken or defective lower sash spring balance at the 2nd window from south at west in the 4th room from east at northNotice not sent yet · inspected Nov 13, 2026 · Violation #19373454
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Notice not sent yet · inspected Nov 13, 2026 · Violation #19374000
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentNotice not sent yet · inspected Nov 13, 2026 · Violation #19373455
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369358
  • B
    Other repairsProperly repair or replace the broken or defective upper sash spring balance at the 2nd window from north at east in the 3rd room from northIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369362
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiled north and east walls in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369363
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369364
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369361
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 13, 2026 · fix by Dec 9, 2026 · Violation #19369360
  • B
    Broken doors or locksProperly repair or replace the broken or defective intercom system from building entrance door to panel at east wall in the kitchenIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369359
  • B
    Other repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartmentIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19363958
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash at window at north wall in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351331
  • B
    Broken doors or locksProvide provide an approve glass at building entrance door ( from street to vestibule door) at public hall, 1st storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351335
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass at building entrance door ( from street to vestibule door) at public hall, 1st storyIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19351334
  • B
    Broken doors or locksProperly repair with similar material the broken or defective rubber gasket around refrigerator door in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351327
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of vinyl floor tile in the 2nd room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351328
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by the method of glazed at the bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351330
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351333
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile near north wall in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351329
  • B
    Broken doors or locksRefit door in the entranceIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351332
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341417
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at east yardIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341419
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materialat ceiling at public hall, 1st storyIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19324878
  • B
    Other repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartmentIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19324871
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19324873
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · rent impairing · Violation #19324872
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311751
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311750
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective rotted sink cabinet in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311754
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311752
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311753
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at door at 1st public hall bulkhead from north at west, section ''south''Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309925
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door at 1st public hall bulkhead from north at west, section ''south''Issued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19309922
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at door at 1st public hall bulkhead from north at west, section ''south''Issued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19309924
  • B
    Broken doors or locksProvide operable door knob for re-entry from roof at 1st public hall bulkhead from north at west, section ''south''Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309929
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309909
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at building entrance door , 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309916
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309913
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19309914
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of defective vinyl floor tiles in the 2nd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265732
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265731
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265733
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at west wall in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265735
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274846
  • B
    Broken doors or locksProperly repair with similar material the broken or defective rubber gasket a refrigerator door in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265730
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19255320
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 1st storyIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19229412
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective [latch set] street door at public hall, 1st storyIssued Sep 30, 2026 · fix by Oct 14, 2026 overdue · Violation #19255321
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at street door at public hall, 1st storyIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19255322
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19229411
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash in the bathroomIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19150287
  • C
    Other repairsProperly repair with similar material the broken or defective parquet wood tiles at floor (splintering) in the 3rd room from eastIssued Aug 21, 2026 · fix by Aug 27, 2026 overdue · Violation #19150281
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective grout at ceramic walls tiles around bathtub in the bathroomIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19150286

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

2812017
1412018
1912019
1282020
992021
2012022
3732023
2162024
1412025
2702026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 2,693 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.