Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Fordham Heights

2364 Tiebout Avenue, Bronx

10458 · 71 apartments · 6 stories · City Council district 15

By · Updated · Data from NYC HPD

C
84open immediately hazardous violations · 118 per 100 apartments
B184Hazardous, open
A36Non-hazardous, open
!251Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

24 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyMMIKP BRONX REALTY LLC
Landlord (head officer or owner)Martin Kirzner

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    89
  2. Broken doors or locks
    45
  3. Peeling paint and plaster
    42
  4. Plumbing, sinks and toilets
    35
  5. Leaks and water damage
    20
  6. Missing smoke or CO detector
    19
  7. Roaches
    16
  8. Mice or rats
    11
  9. Mold
    8
  10. Lead paint
    8
  11. Electrical problems
    7
  12. No heat or hot water
    3
  13. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C82 days
from 246 closed · NYC typical: 87 days
B105 days
from 304 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19364785
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 square feet but less than 30 square feet observed in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350818
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze finish at bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350824
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line under bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19350822
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19347240
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350820
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at upper sash at s2 window from east (upper sash does not open) in the 2nd room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341681
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at upper sash at south wall in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341683
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet at water closet in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19341679
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in at drain line at washbasin in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19341684
  • B
    Broken doors or locksProperly secure the loose door knob at closet at west wall in the 1st room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341685
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at upper sash at s1 window from east in the 2nd room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341680
  • B
    Broken doors or locksProperly repair or replace the broken or defective heavy duty mortise lock at door in the entranceIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341682
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling at 2nd closet at north at east in the 1st room from eastIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318075
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 23, 2026 · fix by Nov 18, 2026 · Violation #19318073
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318074
  • B
    Broken doors or locksProvide approved glass in place of plexiglass at fire door at public hall, 2nd storyIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322949
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 3rd storyIssued Oct 22, 2026 · fix by Nov 5, 2026 overdue · Violation #19322642
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city…Issued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19322669
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at fire door at public hall, 2nd storyIssued Oct 22, 2026 · fix by Oct 28, 2026 overdue · Violation #19322664
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east and south walls in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301963
  • B
    Other repairsRemove all encumbrances consisting of brick at public hall, 3rd story, section at northIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19301972
  • B
    Other repairsRemove all encumbrances consisting of sheet rock at public hall, 3rd story, section at southIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19301971
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301970
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301968
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301967
  • B
    Other repairsProperly repair or replace the broken or defective eletrical light fixture at ceiling in the private hallwayIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301965
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the private hallwayIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301960
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301959
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301958
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301957
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301954
  • B
    Electrical problemsProperly repair or replace the broken or defective eletrical outlets at east and west walls in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301948
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301955
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301950
  • C
    Other repairsProperly repair or replace the broken or defective counter-balances at east wall window top sash in the kitchenIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19242603
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19242604
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19242597
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19242609
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of uncapped gas line at north wall in the kitchenIssued Sep 30, 2026 · fix by Oct 6, 2026 overdue · Violation #19242578
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19242605
  • C
    Broken doors or locksRemove device preventing door from being self-closing kick down door stopper at door in the entranceIssued Sep 29, 2026 · fix by Oct 13, 2026 overdue · Violation #19242617
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 6th story, section at southIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19242307
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19242311
  • B
    Broken doors or locksRefit door and frame at fire door seperating north and south sections at public hall, 4th story, section at southIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19242302
  • B
    Other repairsRemove all encumbrances consisting of construction material at public hall, 3rd story, section at southIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19242301
  • B
    Other repairsRemove all encumbrances consisting of construction material and garbage bags at public hall, 2nd story, section at southIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19242299
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story, section at southIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19242309
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19242661
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19242665
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19242660
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the entranceIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218907
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218913
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218912
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218909
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective lower wood cabinet at sink in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218908
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19218911
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218906
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and west wall in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218905
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19218910

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

882017
1112018
1452019
852020
782021
1052022
1942023
1192024
2682025
3482026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,997 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.