Housing violations · University Heights (South)-Morris Heights
1655 Undercliff Avenue, Bronx
10453 · 125 apartments · 16 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs9
- Mice or rats3
- Roaches2
- Missing smoke or CO detector2
- No heat or hot water1
- Mold1
- Plumbing, sinks and toilets1
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 30 closed · NYC typical: 87 days
from 25 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures at bathroom and in the kitchenIssued May 20, 2026 · fix by May 26, 2026 overdue · rent impairing · Violation #18936914
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18721147
- BOther repairsProperly repair with similar material the broken or defective hard wood floor in the 1st room from east at southIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18662674
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 25, 2026 · fix by Mar 23, 2026 overdue · Violation #18662672
- BOther repairsProperly repair or replace the broken or defective inoperative bel, buzzer, intercom system from 1st story public hall vestibule to receiving panel at east…Issued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18133207
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenetteIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18133206
- COther repairsProvide an adequate supply of gas to the fixtures (at range) in the kitchenetteIssued Mar 4, 2025 · fix by Mar 10, 2025 overdue · rent impairing · Violation #17733046
- BOther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Feb 6, 2025 · fix by Mar 13, 2025 overdue · rent impairing · Violation #17672976
- COther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Sep 24, 2024 · fix by Sep 30, 2024 overdue · Violation #17294812
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 25, 2024 · fix by Apr 20, 2024 overdue · Violation #16771479
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 13, 2023 · fix by Jul 9, 2023 overdue · Violation #16032402
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 13, 2023 · fix by Jul 9, 2023 overdue · Violation #16032405
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jan 17, 2023 · fix by Feb 21, 2023 overdue · Violation #15661914
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jan 17, 2023 · fix by Feb 21, 2023 overdue · Violation #15661913
- BOther repairsProperly repair the broken or defective bell and buzzer system from building vestibule toIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15464516
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles cracked in the kitchenIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15464517
- BMoldTrace and repair the source and abate the visible mold condition at cabinet pproximately 10 sq.ftt in the kitchenIssued Oct 6, 2021 · fix by Nov 10, 2021 overdue · Violation #14595735
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelean surface at the interior at bathtub in the bathroomIssued Oct 6, 2021 · fix by Nov 10, 2021 overdue · Violation #14595736
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of a lockable slide bolt installed on door in the entranceIssued May 26, 2021 · fix by Jun 1, 2021 overdue · Violation #14356566
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Sep 18, 2019 · fix by Oct 23, 2019 overdue · Violation #11268158
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.