Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Parkchester

1540 Unionport Road, Bronx

10462 · 90 apartments · 13 stories · City Council district 18

By · Updated · Data from NYC HPD

C
14open immediately hazardous violations · 16 per 100 apartments
B48Hazardous, open
A9Non-hazardous, open
!52Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

Open in Google Maps ↗

Who owns and manages it

Owning companyTHE PARKCHESTER SOUTH CONDOMINIUM, INC.
Landlord (head officer or owner)Juan Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    22
  2. Peeling paint and plaster
    17
  3. Roaches
    9
  4. Leaks and water damage
    6
  5. Broken doors or locks
    4
  6. Other repairs
    4
  7. Mold
    3
  8. Missing smoke or CO detector
    3
  9. No heat or hot water
    1
  10. Electrical problems
    1
  11. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C36 days
from 11 closed · NYC typical: 84 days
B83 days
from 22 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330601
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330602
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330661
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330603
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330609
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330608
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330607
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330604
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330606
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19330605
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309698
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309730
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309705
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309704
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309703
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309702
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309701
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309700
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309699
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Sep 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19260501
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Sep 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19260500
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entire apartmentIssued Oct 31, 2025 · fix by Nov 14, 2025 overdue · Violation #18334739
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyerIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334737
  • B
    Leaks and water damageRepair the leaky and/or defective faucets consisting running water at sink in the kitchenIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334736
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 8 sq ft at the ceiling in the 1st room from north at eastIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17232944
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the walls and the ceiling in the bathroomIssued Aug 16, 2024 · fix by Sep 20, 2024 overdue · Violation #17192772
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the east wall in the 2nd room from northIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16932278
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from north at eastIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16932276
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall appr 1 sq ft in the kitchenIssued Jul 21, 2023 · fix by Aug 25, 2023 overdue · Violation #16119817
  • C
    RoachesAbate the infestation consisting of roaches in the 1st room from eastIssued May 30, 2023 · fix by Jun 25, 2023 overdue · Violation #16007468
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued May 30, 2023 · fix by Jul 4, 2023 overdue · Violation #16007469
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from eastIssued May 30, 2023 · fix by Jul 4, 2023 overdue · Violation #16007470
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 27, 2023 · fix by May 23, 2023 overdue · Violation #15940766
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 30, 2023 · fix by Apr 25, 2023 overdue · Violation #15847218
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 23, 2023 · fix by Apr 18, 2023 overdue · Violation #15817465
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Jan 17, 2023 · fix by Feb 21, 2023 overdue · Violation #15663197
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Jan 17, 2023 · fix by Feb 21, 2023 overdue · Violation #15663198
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 17, 2023 · fix by Feb 12, 2023 overdue · Violation #15665033
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 9, 2023 · fix by Feb 4, 2023 overdue · Violation #15650415
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallwayIssued Dec 19, 2022 · fix by Jan 23, 2023 overdue · Violation #15617125
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · Violation #15355495
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 31, 2022 · fix by Feb 24, 2022 overdue · Violation #14807668
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). (missing) in the entire apartmentIssued Jan 20, 2022 · fix by Feb 24, 2022 overdue · Violation #14781512
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 20, 2022 · fix by Feb 24, 2022 overdue · Violation #14781514
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees in the entire apartmentIssued May 12, 2021 · fix by May 18, 2021 overdue · Violation #14330484
  • C
    RoachesAbate the infestation consisting of roachesIssued Nov 1, 2019 · fix by Nov 22, 2019 overdue · Violation #13391360
  • C
    MoldTrace and repair the source and abate the nuisance consisting of mold at private hall closet5 apprx east wall 2 sq ft west wall 2 sq ft north wall 2 sq ftIssued Sep 24, 2018 · fix by Oct 2, 2018 overdue · Violation #12594797
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north and east wall in the 1st room from northIssued Sep 21, 2018 · fix by Oct 26, 2018 overdue · Violation #12594870
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroomIssued Sep 21, 2018 · fix by Sep 29, 2018 overdue · Violation #12594860
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at south wall outlet in the 1st room from northIssued Sep 21, 2018 · fix by Oct 26, 2018 overdue · Violation #12594816
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall, north wall in the kitchenIssued Aug 3, 2015 · fix by Sep 7, 2015 overdue · Violation #10804378
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jul 16, 2009 · fix by Aug 20, 2009 overdue · Violation #7963770
  • B
    Broken doors or locksProperly repair the broken or defective door knob at door in the bathroomIssued Jul 16, 2009 · fix by Aug 20, 2009 overdue · Violation #7963769
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wooden door in the 1st room from east at southIssued Jul 16, 2009 · fix by Aug 20, 2009 overdue · Violation #7963768
  • B
    Missing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartmentIssued Jul 30, 2007 · fix by Sep 3, 2007 overdue · Violation #6849821
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 30, 2007 · fix by Sep 3, 2007 overdue · Violation #6849824
  • B
    RoachesAbate the nuisance consisting of vermin roaches in the entire apartmentIssued Oct 8, 2004 · fix by Nov 17, 2004 overdue · Violation #5135570
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Feb 7, 2003 · fix by Mar 19, 2003 overdue · Violation #4476482
  • B
    Other repairsReplace with new the missing wall cabinets in the kitchenIssued Feb 7, 2003 · fix by Mar 19, 2003 overdue · Violation #4476485
  • B
    Plumbing, sinks and toiletsReplace with new the broken or defective base cabinet at sink in the kitchenIssued Feb 7, 2003 · fix by Mar 19, 2003 overdue · Violation #4476486

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

52018
42019
42021
112022
332023
232024
102025
252026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 138 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 2:18 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.