Housing violations · Parkchester
1594 Unionport Road, Bronx
10462 · 104 apartments · 13 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint27
- Peeling paint and plaster16
- Other repairs13
- Broken doors or locks8
- Leaks and water damage8
- Mold5
- No heat or hot water4
- Roaches3
- Plumbing, sinks and toilets2
- Electrical problems2
- Missing smoke or CO detector1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 51 closed · NYC typical: 87 days
from 34 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 1st storyIssued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19305702
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 16, 2026 · fix by Oct 16, 2026 overdue · rent impairing · Violation #19300523
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 16, 2026 · fix by Oct 22, 2026 overdue · Violation #19300524
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19151144
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19151157
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door in the entranceIssued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19151145
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 20, 2026 · fix by Jul 19, 2026 overdue · rent impairing · Violation #19082482
- BBroken doors or locksProperly repair with similar material the broken or defective upper and lower rubber seal at refrigerator door in the kitchenIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18804116
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floot in the kitchenIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18804117
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from eastIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18804119
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at ceiling and east wall in the bathroomIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18804118
- BOther repairsProperly repair with similar material the broken or defective at top and bottom rubber seal at refrigerator in the kitchenIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801692
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from eastIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801695
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801689
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801694
- BOther repairs& 309 m/d law abate the nuisance consisting of at vyinl tiles at floor in the kitchenIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801693
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801688
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at south wall in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18776539
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling at north wall in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18761358
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Feb 11, 2026 · fix by Feb 25, 2026 overdue · Violation #18634816
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18634817
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 4, 2026 · fix by Feb 28, 2026 overdue · Violation #18623554
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Jan 23, 2026 · fix by Feb 27, 2026 overdue · Violation #18589103
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures inadequate hot water supply (low pressure) at fixtures troughout in the bathroomIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · rent impairing · Violation #18548547
- COther repairsProperly repair or replace the broken or defective inoperable radiator at west wall in the 3rd room from east at northIssued Jan 5, 2026 · fix by Jan 11, 2026 overdue · Violation #18546100
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door hinges in the entranceIssued Sep 17, 2024 · fix by Oct 1, 2024 overdue · Violation #17284077
- BMoldTrace and repair the source and abate the visible mold condition approx 3 sq ft at ceiling approx 6 sq ft at north wall in the kitchenIssued Jul 9, 2024 · fix by Aug 13, 2024 overdue · Violation #17112478
- BOther repairsProvide air conditioner support bracket, 1st window from south at west exterior. , 12th storyIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17070722
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the bathroomIssued Mar 25, 2024 · fix by Apr 29, 2024 overdue · Violation #16766508
- CRoachesAbate the infestation consisting of roaches in the kitchenIssued Nov 6, 2023 · fix by Dec 2, 2023 overdue · Violation #16359184
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 17, 2021 · fix by Mar 21, 2021 overdue · Violation #14074911
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 17, 2021 · fix by Mar 21, 2021 overdue · Violation #14074914
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 17, 2021 · fix by Mar 21, 2021 overdue · Violation #14074919
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 17, 2021 · fix by Mar 21, 2021 overdue · Violation #14074916
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 17, 2021 · fix by Mar 21, 2021 overdue · Violation #14074918
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 17, 2021 · fix by Mar 21, 2021 overdue · Violation #14074917
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Mar 17, 2021 · fix by Mar 21, 2021 overdue · Violation #14074910
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 11, 2021 · fix by Jan 9, 2021 overdue · rent impairing · Violation #13977469
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859622
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859627
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859628
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859624
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859623
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859626
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859621
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859620
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859619
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859618
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859617
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859616
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859615
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859614
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859613
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859629
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Oct 20, 2020 · fix by Oct 24, 2020 overdue · Violation #13859625
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Sep 23, 2020 · fix by Sep 27, 2020 overdue · Violation #13823517
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and south wall approx 4 sq.ft in the private hallwayIssued Jun 3, 2020 · fix by Jul 8, 2020 overdue · Violation #13681420
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx 1 sq.ft in the bathroomIssued Jun 3, 2020 · fix by Jul 8, 2020 overdue · Violation #13681421
- BBroken doors or locksArrange and make self-closing the doors entrance door in the entranceIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8659547
- CLeaks and water damage& 309 m/d law abate the nuisance consisting of concealed water leak over ceiling in the foyerIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8659551
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.