Housing violations · Kingsbridge Heights-Van Cortlandt Village
2780 University Avenue, Bronx
10468 · 103 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
44 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs61
- Lead paint27
- Peeling paint and plaster25
- Leaks and water damage17
- Mold13
- Broken doors or locks12
- Roaches7
- Plumbing, sinks and toilets6
- Mice or rats5
- Missing smoke or CO detector4
- No heat or hot water2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 194 closed · NYC typical: 87 days
from 381 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of breaker box metal door screwed shut in the private hallwayIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19300578
- COther repairsProperly repair or replace the broken or defective metal strip saddle at floor in the kitchenIssued Oct 16, 2026 · fix by Oct 22, 2026 overdue · Violation #19300577
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Oct 16, 2026 · fix by Nov 9, 2026 overdue · Violation #19308806
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 15, 2026 · fix by Nov 8, 2026 overdue · Violation #19308642
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287537
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at stand shower floor in the 1st bathroom from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19287536
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling and west wall at public hall, 1st storyIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223502
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st bathroom from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223500
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 2nd bathroom from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223501
- BBroken doors or locksProperly repair or replace the broken or defective window lock ( fire escape) at 1st window from west at north in the kitchenIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223491
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223504
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the 2nd bathroom from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223492
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 17, 2026 · fix by Oct 11, 2026 overdue · Violation #19227989
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 17, 2026 · fix by Oct 11, 2026 overdue · Violation #19227990
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2026 · fix by Oct 13, 2026 overdue · Violation #19223499
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq.ft at ceiling in the 1st bathroom from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223494
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the south wall in the 1st bathroom from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223495
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the west wall in the 5th room from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223498
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the north wall in the 1st room from north at westIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19223496
- BBroken doors or locksProperly repair or replace the broken or defective building entrance door liock from vestibule. , 1st storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206080
- BBroken doors or locksProperly repair or replace the broken or defective building entrance door lock and assemblyv , 1st storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206079
- BOther repairsReplace the broken or defective water closet in the 2nd bathroom from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19173859
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19173853
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19173856
- BOther repairsReplace the broken or defective water closet in the 1st bathroom from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19173821
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19174003
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19173772
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock leading to fire escape in the 1st room from eastIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19174017
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall and ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19173773
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19173998
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19173776
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of re-glazing at bathtub in the 2nd bathroom from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19173866
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19141698
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 6th story balcony at north exterior…Issued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19135042
- BOther repairsProperly repair or replace the broken or defective stationary glass pane at east wall window at public hall, 5th story, section ''northeast''Issued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19135041
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at the 5th, 4th and 3rd story balconies at the west…Issued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19135038
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Aug 7, 2026 · fix by Aug 13, 2026 overdue · rent impairing · Violation #19117242
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the private hallwayIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19117238
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19117239
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 20, 2026 · fix by Jul 26, 2026 overdue · rent impairing · Violation #19081699
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 20, 2026 · fix by Jul 26, 2026 overdue · rent impairing · Violation #19081783
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 20, 2026 · fix by Jul 26, 2026 overdue · rent impairing · Violation #19081731
- BOther repairsRefit upper sash at 1st window from south at west wall in the 1st room from north at westIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19081755
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from northIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19081745
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assembly at door at compactor closet, 2nd story, section at southIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19081831
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and all walls in the 1st bathroom from northIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19081751
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19081756
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door at compactor closet, 2nd story, section at southIssued Jul 20, 2026 · fix by Aug 3, 2026 overdue · Violation #19081830
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 20, 2026 · fix by Jul 26, 2026 overdue · rent impairing · Violation #19081794
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall in the 1st bathroom from northIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19087812
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · rent impairing · Violation #19070169
- BOther repairsProperly secure the loose saddle at entrance in the kitchenIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070170
- BBroken doors or locksReplace with new the missing door cover for circuit breaker box at north wall in the private hallwayIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070171
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070182
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070181
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070130
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070166
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · rent impairing · Violation #19070162
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070165
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · rent impairing · Violation #19070180
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.