Housing violations · Fordham Heights
2340 Valentine Avenue, Bronx
10458 · 49 apartments · 6 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
What the city has done here
When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.
Latest city repairs
- $Lead paint removal · $145Lead paintOct 23, 2025 · Details
- $General repairs · $408Missing window guardsJan 24, 2014 · Details
- $General repairs · $120Missing window guardsSep 3, 2013 · Details
- $General repairs · $495Leaks and water damageJan 15, 2013 · Details
- $General repairs · $677Leaks and water damageSep 10, 2012 · Details
- $General repairs · $1,124Leaks and water damageAug 17, 2012 · Details
- $General repairs · $491Peeling paint and plasterDec 7, 2011 · Details
- $General repairs · $880Peeling paint and plasterApr 7, 2011 · Details
Latest Housing Court cases
- §Tenants sued over repairs and harassmentOpened Oct 8, 2024 · Closed · Details
- §No heat or hot waterOpened Dec 20, 2019 · Closed · Details
- §No heat or hot waterOpened Dec 26, 2013 · Closed · Details
- §False repair claimsOpened Aug 13, 2013 · Closed · Details
- §Warrant to get in and inspect or repairOpened Sep 19, 2012 · Closed · Details
- §False repair claimsOpened Oct 11, 2011 · Closed · Details
- §Tenants sued for repairsOpened Jul 28, 2011 · Closed · Details
- §Warrant to get in and inspect or repairOpened Oct 12, 2010 · Closed · Details
Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster21
- Other repairs17
- Lead paint15
- Broken doors or locks13
- Mold9
- Plumbing, sinks and toilets9
- Roaches6
- Leaks and water damage5
- Mice or rats5
- Missing smoke or CO detector4
- No heat or hot water2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 36 closed · NYC typical: 84 days
from 61 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355444
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355445
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355448
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallwayIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355447
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from eastIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355446
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 19, 2026 · fix by Nov 23, 2026 overdue · Violation #19304417
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19304133
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 19, 2026 · fix by Nov 23, 2026 overdue · Violation #19304416
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19304418
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at south wall in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19072356
- BMoldTrace and repair the source and abate the visible mold condition less then 10 sq ft at ceiling and west wall in the bathroomIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18784857
- BOther repairsReplace with new the missing knob for valve at radiator in the 4th room from east at southIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18705626
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective rotted wood inside base cabinet at sink in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699977
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 12, 2026 · fix by Apr 7, 2026 overdue · Violation #18699984
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699982
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699981
- BBroken doors or locksProperly repair or replace the broken or defective wall cabinet door at east wall in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699980
- BOther repairsProperly repair with similar material the broken or defective sagging floor in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699979
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699972
- BOther repairsProperly repair with similar material the broken or defective sagging floor in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699978
- BPlumbing, sinks and toiletsRepair the broken or defective connection at waste drain pipe at sink in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699987
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective rotted wood inside base cabinet at wash basin in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699976
- BPlumbing, sinks and toiletsRepair the broken or defective connection at waste drain pipe at wash basin in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699975
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective enamel glazed at bathtub in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699974
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic wall tile at west wall. at bathtub in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699973
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699971
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq.ft at ceiling in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699967
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699970
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699969
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699968
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18699986
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 12, 2026 · fix by Apr 7, 2026 overdue · Violation #18699985
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 2nd room from eastIssued Feb 3, 2026 · fix by Feb 3, 2026 overdue · rent impairing · Violation #18614041
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Feb 3, 2026 · fix by Feb 9, 2026 overdue · Violation #18614042
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 30, 2025 · fix by Dec 30, 2025 overdue · rent impairing · Violation #18535236
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective [latch] door at 3rd story at public hallIssued Dec 30, 2025 · fix by Jan 13, 2026 overdue · Violation #18535242
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Dec 30, 2025 · fix by Jan 5, 2026 overdue · Violation #18535237
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective [latch] door at 6th story at public hallIssued Dec 30, 2025 · fix by Jan 13, 2026 overdue · Violation #18535238
- BBroken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at door at 6th story at public hallIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18535239
- BBroken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at door at 5th story at public hallIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18535241
- BBroken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at door at 3rd story at public hallIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18535243
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18535235
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Dec 15, 2025 · fix by Dec 21, 2025 overdue · Violation #18505401
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchenIssued Dec 11, 2025 · fix by Jan 15, 2026 overdue · Violation #18497022
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18391261
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18391262
- BLead paint& 309 m/d law abate the nuisance consisting of operated key lock at door leading to fire escape in the 2nd room from northIssued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18391263
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at celing and north wall in the bathroomIssued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18391258
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18391259
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18367054
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchenIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18367058
- COther repairsProperly repair with similar material the broken or defective cracked vinyl tiles at floor in the 3rd room from eastIssued Nov 14, 2025 · fix by Nov 20, 2025 overdue · Violation #18367059
- COther repairsProperly repair with similar material the broken or defective cracked vinyl tiles at floor in the entire apartmentIssued Nov 14, 2025 · fix by Nov 20, 2025 overdue · Violation #18367055
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the private hallwayIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18367057
- BBroken doors or locksProperly repair or replace the broken or defective latch at fire door at north at public hall, 5th storyIssued Nov 6, 2025 · fix by Dec 11, 2025 overdue · Violation #18348005
- BOther repairsProperly repair or replace the broken or defective counter balance at 2nd window from north at east wall (south section) at public hall, 4th storyIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18285860
- BOther repairsProperly repair or replace the broken or defective counter balance at 2nd window from north at east wall (south section) at public hall, 5th storyIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18285863
- BOther repairsProperly repair or replace the broken or defective counter balance at 1st window from north at east wall (north section) at public hall, 4th storyIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18285854
- BBroken doors or locksProvide an unlockable slide bolt or hook on roof door that allows re-entry from roof to public hall at south section. at public hall, 5th storyIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18285805
- BBroken doors or locksProvide an unlockable slide bolt or hook on roof door that allows re-entry from roof to public hall at south section at public hall, 5th storyIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18285787
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 24, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.