Housing violations · Bedford Park
2685 Valentine Avenue, Bronx
10458 · 44 apartments · 5 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
19 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs53
- Broken doors or locks34
- Peeling paint and plaster33
- Roaches13
- Leaks and water damage12
- Mice or rats11
- No heat or hot water9
- Mold8
- Lead paint8
- Plumbing, sinks and toilets7
- Missing smoke or CO detector2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 158 closed · NYC typical: 87 days
from 267 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at roof door at 1st public hall bulkhead from north, 5th storyIssued Nov 12, 2026 · fix by Nov 26, 2026 · Violation #19364661
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · rent impairing · Violation #19364658
- BBroken doors or locksProperly repair or replace the broken or defective latch and assemblies at roof door at 1st public hall bulkhead from north, 5th storyIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364662
- COther repairsReplace with new the missing 10th ballister from intermediate landing up north section at public hall stairs, 5th storyIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19364660
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364659
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hallIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19328115
- BBroken doors or locksRefit building entrance door , 1st storyIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19331179
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance , 1st storyIssued Oct 28, 2026 · fix by Nov 11, 2026 overdue · Violation #19331180
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at ceiling, north wall and south wall in the bathroomIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19213550
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at base of bathtub in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19140854
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19140856
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19140857
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.feet at north wall in the foyerIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19132112
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 23, 2026 · fix by Aug 18, 2026 overdue · Violation #19090794
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 23, 2026 · fix by Aug 18, 2026 overdue · Violation #19090795
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance door from street to public hall at public hallIssued Jul 23, 2026 · fix by Aug 6, 2026 overdue · Violation #19090802
- BOther repairsProperly repair or replace the broken or defective broken gate at fire escape window.( unopenable) in the 4th room from eastIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19090796
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at street to 1st story public hall , 1st storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19064703
- BOther repairsProperly repair or replace the broken or defective lower shash spring balance metal at 1st east window in the 1st room from eastIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18994806
- BOther repairsProperly repair with similar material the broken or defective mosaic tile floor ''entranceIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18931148
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at junction box at ceiling at public hall, 5th story, section ''south''Issued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18931149
- BOther repairsProperly repair with similar material the broken or defective cement sub-floor ''entranceIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18931147
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles floor in the 2nd room from eastIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18931139
- COther repairsProperly repair with similar material the broken or defective 1st cracked riser at from top to bottom at intermidate landing at public hall stairs, 5th storyIssued May 7, 2026 · fix by May 13, 2026 overdue · Violation #18850845
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures no hot water supply to all fixtures at kitchen and bathroom in the entire apartmentIssued May 6, 2026 · fix by May 12, 2026 overdue · rent impairing · Violation #18852083
- COther repairsProvide adequate supply of cold water for the fixtures no cold water supply at all fixtures at kitchen and bathroom in the entire apartmentIssued May 6, 2026 · fix by May 12, 2026 overdue · rent impairing · Violation #18852084
- COther repairsProvide adequate supply of cold water for the fixtures no cold water at water closet in the bathroomIssued May 6, 2026 · fix by May 12, 2026 overdue · rent impairing · Violation #18852081
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 6, 2026 · fix by Jun 1, 2026 overdue · Violation #18852085
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st storyIssued Apr 28, 2026 · fix by May 4, 2026 overdue · Violation #18817417
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st storyIssued Apr 28, 2026 · fix by May 12, 2026 overdue · Violation #18817416
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building enetrance door at public hall, 1st storyIssued Apr 13, 2026 · fix by Apr 27, 2026 overdue · Violation #18782996
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective stout at bathtub in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772769
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772762
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at front entrance door to building at public hall, 1st storyIssued Apr 9, 2026 · fix by Apr 23, 2026 overdue · Violation #18772773
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from eastIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772764
- BOther repairsProperly repair with similar material the broken or defective wood frame at fire escape window in the 3rd room from eastIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772766
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772768
- BOther repairsProperly repair or replace the broken or defective intercom systemIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18776566
- BOther repairs& 309 m/d law abate the nuisance consisting of air conditioner at fire escape window in the 1st room from east at northIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18776603
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Apr 9, 2026 · fix by Apr 15, 2026 overdue · rent impairing · Violation #18772761
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective at building entrance door at public hall, 1st storyIssued Apr 8, 2026 · fix by May 4, 2026 overdue · Violation #18776657
- BOther repairsProperly repair with similar material the broken or defective unlevel concrete treads at stoopIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18776666
- BBroken doors or locksProperly repair or replace the broken or defective door frame at east in the entranceIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18757204
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash window in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18757205
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance , 1st storyIssued Apr 7, 2026 · fix by Apr 13, 2026 overdue · Violation #18757135
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective arm closer at building entrance door , 1st storyIssued Apr 7, 2026 · fix by Apr 21, 2026 overdue · Violation #18757139
- BOther repairsProperly repair or replace the broken or defective bell and buzzer system from building entrance toIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18757206
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18757177
- CLead paint& 309 m/d law abate the nuisance consisting of key operated knob at door leading to fire escape in the 4th room from eastIssued Apr 7, 2026 · fix by Apr 13, 2026 overdue · Violation #18757198
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18757190
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18757200
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18757165
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 6, 2026 · fix by May 2, 2026 overdue · Violation #18757143
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 6, 2026 · fix by May 2, 2026 overdue · Violation #18757144
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18757159
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from eastIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18757161
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18757162
- BOther repairsProperly repair or replace the broken or defective bell and buzzer system from building entrance toIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18757170
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18757158
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18759492
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.