Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2872 Valentine Avenue, Bronx

10458 · 3 apartments · 2 stories · City Council district 15

By · Updated · Data from NYC HPD

C
3open immediately hazardous violations · 100 per 100 apartments
B13Hazardous, open
A3Non-hazardous, open
!19Past the fix-by date

Open in Google Maps ↗

Who owns and manages it

Owning companyDARKO MANAGEMENT LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    5
  2. Peeling paint and plaster
    4
  3. Electrical problems
    3
  4. Mice or rats
    2
  5. Leaks and water damage
    2
  6. Bedbugs
    1
  7. Roaches
    1
  8. Plumbing, sinks and toilets
    1
  9. Mold
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C161 days
from 2 closed · NYC typical: 84 days
BNot enough data
NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsReplace with new the missing light fixture at ceiling in the 3rd room from east at southIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17924120
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wiring at ceiling in the 3rd room from east at southIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17924121
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at all fixtures and outlets in the 4th room from eastIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17924122
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at all fixtures and outlets in the 5th room from east at southIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17924123
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroomIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16986658
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 20, 2024 · fix by Jun 15, 2024 overdue · Violation #16986662
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiled floor in the private hallwayIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16986681
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16986639
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the bathroomIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16986657
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16986628
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 3, 2024 · fix by Apr 29, 2024 overdue · Violation #16810867
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at north wall in the bathroomIssued Apr 3, 2024 · fix by May 8, 2024 overdue · Violation #16810865
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiled floor in the kitchenIssued Apr 3, 2024 · fix by May 8, 2024 overdue · Violation #16810858
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood floor at sink base cabinet in the kitchenIssued Apr 3, 2024 · fix by May 8, 2024 overdue · Violation #16810856
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 3, 2024 · fix by Apr 29, 2024 overdue · Violation #16810868
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 20 sq. ft. at east wall, north wall, south wall and ceiling in the bathroomIssued Apr 3, 2024 · fix by May 8, 2024 overdue · Violation #16810821

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12021
22022
12023
172024
52025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 71 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.