Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2980 Valentine Avenue, Bronx

10458 · 79 apartments · 6 stories · City Council district 11

By · Updated · Data from NYC HPD

C
67open immediately hazardous violations · 85 per 100 apartments
B32Hazardous, open
A9Non-hazardous, open
!103Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company2980 VALETINE ASSOCIATES LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    63
  2. Mold
    11
  3. Peeling paint and plaster
    10
  4. Roaches
    9
  5. Mice or rats
    6
  6. Other repairs
    4
  7. Leaks and water damage
    3
  8. Broken doors or locks
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C76 days
from 55 closed · NYC typical: 87 days
B93 days
from 84 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at south wall in the 3rd room from north at eastIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364402
  • B
    Other repairsRemove all encumbrances consisting of garbage bags (black and white) at south wall at public hallIssued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19286559
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq. ft but less than 30 sq ft observed at north wall in the private hallwayIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19289618
  • B
    MoldTrace and repair the source and abate the visible mold condition lessthan 25 sq ft. at north wall in the foyerIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19272129
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19223540
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the foyerIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223537
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994911
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at north wall in the bathroomIssued Oct 6, 2025 · fix by Nov 1, 2025 overdue · Violation #18283626
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 7, 2025 · fix by Sep 2, 2025 overdue · rent impairing · Violation #18139353
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of motion sensor device at light fixtures at ceiling dimming light to a very low level at public hall, 2nd storyIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139361
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 29, 2024 · fix by Sep 24, 2024 overdue · Violation #17230349
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 7, 2024 · fix by Sep 11, 2024 overdue · Violation #17173701
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 7, 2024 · fix by Sep 11, 2024 overdue · Violation #17173702
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 7, 2024 · fix by Sep 11, 2024 overdue · Violation #17173703
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jul 30, 2024 · fix by Aug 3, 2024 overdue · Violation #17156915
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jul 30, 2024 · fix by Aug 3, 2024 overdue · Violation #17156914
  • C
    Mice or ratsAbate the infestation consisting of rodents , rats at basementIssued May 24, 2024 · fix by Jun 19, 2024 overdue · rent impairing · Violation #16989585
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 22, 2024 · fix by Jun 17, 2024 overdue · Violation #16987980
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 22, 2024 · fix by Jun 17, 2024 overdue · Violation #16987981
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 4, 2024 · fix by Apr 30, 2024 overdue · Violation #16819053
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 4, 2024 · fix by Apr 30, 2024 overdue · Violation #16819052
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 5 sq ft at ceiling in the bathroomIssued Oct 20, 2023 · fix by Nov 24, 2023 overdue · Violation #16327195
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 14, 2023 · fix by Aug 7, 2023 overdue · Violation #16103068
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 14, 2023 · fix by Aug 7, 2023 overdue · Violation #16103067
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 14, 2023 · fix by Aug 7, 2023 overdue · Violation #16103066
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 14, 2023 · fix by Aug 7, 2023 overdue · Violation #16103070
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 14, 2023 · fix by Aug 7, 2023 overdue · Violation #16103072
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 14, 2023 · fix by Aug 7, 2023 overdue · Violation #16103071
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 14, 2023 · fix by Aug 7, 2023 overdue · Violation #16103069
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 7, 2023 · fix by Jul 31, 2023 overdue · Violation #16087251
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 7, 2023 · fix by Jul 31, 2023 overdue · Violation #16087250
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 7, 2023 · fix by Jul 31, 2023 overdue · Violation #16087253
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling 6sq north wall 3 sq ft south wall 8 sq ft east wall 4sq ft in the bathroomIssued Jul 3, 2023 · fix by Aug 7, 2023 overdue · Violation #16071846
  • B
    Other repairsProperly repair with similar material the broken or defective sagging chipping wood floor in the 4th room from eastIssued Jul 3, 2023 · fix by Aug 7, 2023 overdue · Violation #16073459
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Apr 20, 2023 · fix by May 14, 2023 overdue · Violation #15935622
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 17, 2023 · fix by May 13, 2023 overdue · Violation #15923985
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 6, 2023 · fix by Apr 10, 2023 overdue · Violation #15753137
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 1, 2023 · fix by Apr 5, 2023 overdue · Violation #15753138
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 1, 2023 · fix by Apr 5, 2023 overdue · Violation #15753134
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 1, 2023 · fix by Apr 5, 2023 overdue · Violation #15753139
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 1, 2023 · fix by Apr 5, 2023 overdue · Violation #15753135
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 1, 2023 · fix by Apr 5, 2023 overdue · Violation #15753133
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 1, 2023 · fix by Apr 5, 2023 overdue · Violation #15753132
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from northIssued Mar 1, 2023 · fix by Apr 5, 2023 overdue · Violation #15753421
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Mar 1, 2023 · fix by Apr 5, 2023 overdue · Violation #15753136
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Feb 27, 2023 · fix by Mar 3, 2023 overdue · Violation #15745397
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Feb 27, 2023 · fix by Mar 3, 2023 overdue · Violation #15745398
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 9, 2023 · fix by Mar 5, 2023 overdue · Violation #15718853
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Feb 9, 2023 · fix by Mar 5, 2023 overdue · Violation #15719279
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Feb 9, 2023 · fix by Mar 5, 2023 overdue · Violation #15718858
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 9, 2023 · fix by Mar 5, 2023 overdue · Violation #15718857
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 9, 2023 · fix by Mar 5, 2023 overdue · Violation #15718856
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 9, 2023 · fix by Mar 5, 2023 overdue · Violation #15718855
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 2 sqft of mold at window frame at north window in the 1st room from east at northIssued Jan 10, 2023 · fix by Feb 14, 2023 overdue · Violation #15660058
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 4th room from eastIssued Oct 14, 2022 · fix by Nov 18, 2022 overdue · Violation #15427679
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 14, 2022 · fix by Nov 18, 2022 overdue · Violation #15427680
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Oct 14, 2022 · fix by Nov 18, 2022 overdue · Violation #15427681
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the 1st room from eastIssued Oct 14, 2022 · fix by Nov 18, 2022 overdue · Violation #15427682
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from north at eastIssued Feb 4, 2022 · fix by Mar 11, 2022 overdue · Violation #14810988
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Feb 4, 2022 · fix by Feb 28, 2022 overdue · Violation #14813001

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

272017
42018
152019
382020
52021
382022
1202023
342024
382025
422026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 583 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.