Housing violations · Concourse-Concourse Village
1170 Walton Avenue, Bronx
10452 · 56 apartments · 5 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs20
- Broken doors or locks18
- Mice or rats11
- Plumbing, sinks and toilets11
- Peeling paint and plaster10
- Roaches9
- Mold7
- Lead paint4
- Leaks and water damage3
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 90 closed · NYC typical: 87 days
from 92 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Nov 10, 2026 · fix by Dec 6, 2026 · rent impairing · Violation #19357188
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Nov 10, 2026 · fix by Dec 6, 2026 · rent impairing · Violation #19357191
- CBroken doors or locksProperly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at north wall in the 4th…Issued Nov 6, 2026 · fix by Nov 12, 2026 overdue · Violation #19357186
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2026 · fix by Dec 2, 2026 · Violation #19357184
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Nov 6, 2026 · fix by Dec 2, 2026 · rent impairing · Violation #19357183
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2026 · fix by Dec 2, 2026 · Violation #19355159
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355162
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and south walls in the 2nd room from eastIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19357187
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19233827
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19233826
- BOther repairsProperly repair with similar material the broken or defective wood floor (rat hole) in the 2nd room from eastIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19233829
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 18, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19233822
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall (rat hole) in the 2nd room from eastIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19233828
- BMoldTrace and repair the source and abate the visible mold condition observed mold greater than 10 sq ft at ceiling, south wall and around window casing in the…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19233824
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall (rat hole) in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19233825
- BOther repairsAbate the nuisance consisting of pests. evidence of evidence of flies at basementIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19182922
- BBroken doors or locksProperly repair or replace the broken or defective from intercom pannel at building entrance door to intercom pannel at north wall in the entranceIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19182921
- BOther repairs& 309 m/d law abate the nuisance consisting of nails protruding from wood floor in the 3rd room from eastIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137775
- BOther repairs& 309 m/d law abate the nuisance consisting of nails protruding from wood floor in the private hallwayIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137773
- CMoldTrace and repair the source and abate the visible mold condition at north wall, east wall, south wall, west wall, and at ceiling in the bathroomIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19137762
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 17, 2026 · fix by Sep 12, 2026 overdue · rent impairing · Violation #19137770
- BOther repairsProperly repair or replace the broken or defective cover at baseboard radiator in the 1st room from east at southIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137768
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137767
- BOther repairsProperly repair or replace the broken or defective wall cabinet at north wall in the kitchenIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137766
- BOther repairsProperly repair or replace the broken or defective cover at baseboard radiator in the 3rd room from eastIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137765
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19137769
- BPlumbing, sinks and toiletsRepair the broken or defective connection drain pipe at sink in the kitchenIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137776
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft combined at all walls and the ceiling in the bathroomIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19101039
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 28, 2026 · fix by Aug 23, 2026 overdue · Violation #19101034
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 28, 2026 · fix by Aug 23, 2026 overdue · rent impairing · Violation #19101033
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 28, 2026 · fix by Aug 23, 2026 overdue · Violation #19101037
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at bathub in the bathroomIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · rent impairing · Violation #19101028
- CMice or ratsAbate the infestation consisting of miceIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19083058
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to panel at east wall at apartment 1c , 1st storyIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19083057
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st private hallway from eastIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039713
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 30, 2026 · fix by Jul 26, 2026 overdue · Violation #19039715
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039711
- BBroken doors or locksProvide approve glass at building entrance door ( from court yard to vestibule door) at public hall, 1st storyIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039717
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 30, 2026 · fix by Jul 26, 2026 overdue · Violation #19039709
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass at building entrance door ( from court yard to vestibule door) at public hall, 1st storyIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039716
- BBroken doors or locksProperly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at south wall in the entranceIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039712
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Mar 26, 2026 · fix by Apr 21, 2026 overdue · rent impairing · Violation #18740911
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door in the entranceIssued Mar 26, 2026 · fix by Apr 9, 2026 overdue · Violation #18740867
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 5, 2026 · fix by Mar 31, 2026 overdue · Violation #18684473
- BLead paint& 309 m/d law abate the nuisance consisting of two way electro magnetic strip at building entrance door leading to building entrance at public hall, 1st storyIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18658301
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass on the door in the building entrane at public hall, 1st storyIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558363
- BBroken doors or locksProvide provide an approve plexiglass at building entrance door at ( from front court to public hall) at public hall, 1st storyIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558364
- BOther repairsProperly repair with similar material the broken or defective slopping wooden sub-floor near east wall in the 2nd room from northIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18528773
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intrecom system from the building entrance door to the apartment east wall panel. in the foyerIssued Dec 2, 2025 · fix by Jan 6, 2026 overdue · Violation #18475930
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Dec 1, 2025 · fix by Dec 27, 2025 overdue · rent impairing · Violation #18469335
- BBroken doors or locksProperly repair or replace the broken or defective door frame in the 3rd room from north at eastIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18469336
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at basement story at public hallIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18367223
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18256942
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18256943
- BBroken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door at public hall,…Issued Jul 21, 2025 · fix by Aug 25, 2025 overdue · Violation #18107912
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17908028
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub interior in the bathroomIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17908027
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17908022
- BLead paint& 309 m/d law abate the nuisance consisting of key operated locking device installed on entrance door leading to fire escape window exit in the 1st room from…Issued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17908026
- BBroken doors or locksProperly repair or replace the broken or defective bell/buzzer system from building entrance door to wall pannel in the foyerIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17908029
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.