Housing violations · Mount Hope
1857 Walton Avenue, Bronx
10453 · 44 apartments · 5 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
56 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster127
- Other repairs104
- Leaks and water damage48
- Mold38
- Missing smoke or CO detector36
- Plumbing, sinks and toilets30
- Broken doors or locks27
- Lead paint26
- Mice or rats24
- Roaches18
- No heat or hot water12
- Electrical problems11
- Missing window guards4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 109 closed · NYC typical: 87 days
from 21 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- COther repairsProvide adequate supply of cold water for the fixtures no running cold water to all apartment fixtures in the bathroomIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · rent impairing · Violation #18316057
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures no running hot water to all apartment fixtures in the bathroomIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · rent impairing · Violation #18316056
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx.:10 sq. ft. in the bathroomIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18316069
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18316060
- CLead paintProperly repair with similar material the broken or defective fire retardant material at south wall leading to 2nd story at public hall stairs, 1st storyIssued Oct 8, 2025 · fix by Oct 14, 2025 overdue · Violation #18277817
- COther repairsProperly repair with similar material the broken or defective fire retardant material at south wall, west wall and ceiling at public hall, 1st storyIssued Oct 8, 2025 · fix by Oct 14, 2025 overdue · Violation #18277820
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Mar 25, 2025 · fix by Mar 31, 2025 overdue · rent impairing · Violation #17786023
- COther repairsProvide adequate supply of cold water for the fixtures at kitchen and bathroom in the entire apartmentIssued Mar 12, 2025 · fix by Mar 18, 2025 overdue · rent impairing · Violation #17752672
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartmentIssued Mar 12, 2025 · fix by Mar 18, 2025 overdue · rent impairing · Violation #17752670
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Mar 10, 2025 · fix by Mar 16, 2025 overdue · Violation #17752675
- COther repairsProperly repair or replace the broken or defective boiler at boiler roomIssued Mar 3, 2025 · fix by Mar 9, 2025 overdue · Violation #17729953
- CElectrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Feb 28, 2025 · fix by Feb 27, 2025 overdue · Violation #17729929
- COther repairsCleanse and disinfect to the satisfaction of this department after removing the water at boiler roomIssued Feb 27, 2025 · fix by Mar 5, 2025 overdue · rent impairing · Violation #17722837
- CPlumbing, sinks and toiletsRemove all obstructions and repair all defects in water waste drain line at boiler roomIssued Feb 27, 2025 · fix by Mar 5, 2025 overdue · rent impairing · Violation #17722841
- COther repairsProvide adequate supply of cold water for the fixtures in the entire apartmentIssued Feb 25, 2025 · fix by Mar 3, 2025 overdue · rent impairing · Violation #17715136
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Feb 25, 2025 · fix by Mar 3, 2025 overdue · rent impairing · Violation #17715130
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 24, 2025 · fix by Mar 31, 2025 overdue · Violation #17711360
- CPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at all plumbing fixtures and water closet in the entire apartmentIssued Feb 24, 2025 · fix by Mar 2, 2025 overdue · rent impairing · Violation #17711361
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Feb 24, 2025 · fix by Mar 2, 2025 overdue · Violation #17711364
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 24, 2025 · fix by Mar 22, 2025 overdue · Violation #17711359
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures at all plumbing fixture in the entire apartmentIssued Feb 24, 2025 · fix by Mar 2, 2025 overdue · rent impairing · Violation #17711366
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 24, 2025 · fix by Feb 22, 2025 overdue · rent impairing · Violation #17711363
- CPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at all plumbing fixtures and water closet in the entire apartmentIssued Feb 24, 2025 · fix by Mar 2, 2025 overdue · rent impairing · Violation #17711365
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 21, 2025 · fix by Feb 27, 2025 overdue · Violation #17715126
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 21, 2025 · fix by Feb 21, 2025 overdue · rent impairing · Violation #17715117
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 13, 2025 · fix by Feb 19, 2025 overdue · Violation #17692876
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 6, 2025 · fix by Feb 12, 2025 overdue · Violation #17683132
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 30, 2025 · fix by Jan 30, 2025 overdue · rent impairing · Violation #17667710
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 30, 2025 · fix by Jan 30, 2025 overdue · rent impairing · Violation #17667713
- BOther repairsCleanse and disinfect to the satisfaction of this department after removing the dirty water and debris at cellarIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · rent impairing · Violation #17667725
- CPlumbing, sinks and toiletsRemove all obstructions and repair all defects in floor drain at cellarIssued Jan 30, 2025 · fix by Feb 5, 2025 overdue · rent impairing · Violation #17667739
- CBroken doors or locksProvide ready access to buildings heating system door to boiler room locked at cellarIssued Jan 22, 2025 · fix by Jan 28, 2025 overdue · Violation #17640582
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 22, 2025 · fix by Jan 28, 2025 overdue · Violation #17641497
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 21, 2025 · fix by Jan 27, 2025 overdue · Violation #17634578
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge in the entranceIssued Jan 21, 2025 · fix by Feb 4, 2025 overdue · Violation #17634327
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 21, 2025 · fix by Jan 18, 2025 overdue · rent impairing · Violation #17634574
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 21, 2025 · fix by Jan 18, 2025 overdue · rent impairing · Violation #17634577
- BBroken doors or locksProperly repair or replace the broken or defective door frame in the entranceIssued Jan 21, 2025 · fix by Feb 25, 2025 overdue · Violation #17634331
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 17, 2025 · fix by Jan 23, 2025 overdue · Violation #17633975
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of discarded range with doors in tact at public hall, 1st story [south sectionIssued Nov 1, 2024 · fix by Nov 7, 2024 overdue · Violation #17392651
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at fire escape at north exterior wall, north yardIssued Nov 1, 2024 · fix by Dec 6, 2024 overdue · rent impairing · Violation #17392648
- BMoldTrace and repair the source and abate the visible mold condition at north wall approximately 8 sq ft in the bathroomIssued Oct 21, 2024 · fix by Nov 25, 2024 overdue · Violation #17363294
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Sep 5, 2024 · fix by Sep 11, 2024 overdue · Violation #17248288
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Sep 5, 2024 · fix by Oct 10, 2024 overdue · Violation #17248290
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 16, 2024 · fix by Sep 11, 2024 overdue · Violation #17204088
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 15, 2024 · fix by Sep 10, 2024 overdue · Violation #17196508
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at south wall at public hall, 1st storyIssued Aug 15, 2024 · fix by Sep 19, 2024 overdue · Violation #17189503
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at south wall at public hall, 2nd storyIssued Aug 15, 2024 · fix by Sep 19, 2024 overdue · Violation #17189504
- BMoldTrace and repair the source and abate the visible mold condition approx 5 sq feet at north wall in the bathroomIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17156147
- BMoldTrace and repair the source and abate the visible mold condition north wall approx 4 sq ft in the bathroomIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17148857
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 27, 2024 · fix by Jul 3, 2024 overdue · Violation #17080634
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 27, 2024 · fix by Aug 1, 2024 overdue · Violation #17080653
- COther repairsProperly repair with similar material the broken or defective eroded mortar joints at all exterior wall building frontIssued Jun 27, 2024 · fix by Jul 3, 2024 overdue · Violation #17080673
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 27, 2024 · fix by Jul 3, 2024 overdue · Violation #17080631
- BOther repairsProperly secure the loose light fixture at ceiling in the bathroomIssued Jun 27, 2024 · fix by Aug 1, 2024 overdue · Violation #17080650
- BPlumbing, sinks and toiletsRepair the broken or defective connection in waste line under the sink in the kitchenIssued Jun 27, 2024 · fix by Aug 1, 2024 overdue · Violation #17080663
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17060499
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17060498
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroomIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17060501
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17060497
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.