Housing violations · Claremont Village-Claremont (East)
1292 Washington Avenue, Bronx
10456 · 30 apartments · 6 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Roaches7
- Other repairs7
- Lead paint6
- Mold4
- Mice or rats3
- Peeling paint and plaster2
- No heat or hot water1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 28 closed · NYC typical: 87 days
from 53 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at east wall and south wall in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287780
- BMoldTrace and repair the source and abate the visible mold condition observed greater the 10 sq ft at north, and west wall in the bathroomIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19260584
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 29, 2026 · fix by Oct 25, 2026 overdue · Violation #19260585
- BOther repairsProperly repair or replace the broken or defective intercom system at south wall in the foyerIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19190054
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19190053
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at the ceiling in the bathroomIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19135237
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19108691
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 9, 2026 · fix by Jul 5, 2026 overdue · Violation #18991201
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · Violation #18782073
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 5, 2026 · fix by Jan 31, 2026 overdue · Violation #18546294
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 5, 2026 · fix by Jan 3, 2026 overdue · rent impairing · Violation #18546296
- BOther repairsProperly repair with similar material the broken or defective concrete flashing at north and west exterior wall at 6th storyIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18292029
- COther repairsProperly repair with similar material the broken or defective vertical crack above 6th window from east at north exterior wall from 1st story to 8th storyIssued Oct 9, 2025 · fix by Oct 15, 2025 overdue · Violation #18292020
- BOther repairsProperly repair with similar material the broken or defective missing bricks at 6th story above 1st window at north east corner at north exterior wallIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18292008
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at room door leading to fire escape window in the 4th room from eastIssued Aug 28, 2025 · fix by Oct 2, 2025 overdue · Violation #18190147
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 13, 2024 · fix by Dec 7, 2024 overdue · Violation #17420540
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 13, 2024 · fix by Dec 7, 2024 overdue · Violation #17420541
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 13, 2024 · fix by Dec 7, 2024 overdue · Violation #17420542
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Nov 13, 2024 · fix by Dec 7, 2024 overdue · Violation #17420539
- CRoachesAbate the infestation consisting of roaches in the bathroomIssued May 16, 2024 · fix by Jun 11, 2024 overdue · Violation #16973932
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Apr 17, 2023 · fix by May 11, 2023 overdue · Violation #15928046
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 27, 2023 · fix by Apr 22, 2023 overdue · Violation #15857430
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 27, 2023 · fix by Apr 22, 2023 overdue · Violation #15857428
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 27, 2023 · fix by Apr 22, 2023 overdue · Violation #15857450
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 27, 2023 · fix by Apr 22, 2023 overdue · Violation #15857398
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Sep 27, 2022 · fix by Nov 1, 2022 overdue · Violation #15386459
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze finish at bathtub in the bathroomIssued Sep 27, 2022 · fix by Nov 1, 2022 overdue · Violation #15386460
- BMoldTrace and repair the source and abate the visible mold condition at south wall approx. 2 sq.ft. in the bathroomIssued Aug 19, 2022 · fix by Sep 23, 2022 overdue · Violation #15329219
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.