Housing violations · Tremont
2179 Washington Avenue, Bronx
10457 · 34 apartments · 6 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
94 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs261
- Peeling paint and plaster178
- Leaks and water damage87
- Broken doors or locks73
- Missing smoke or CO detector61
- Lead paint57
- Mold50
- Mice or rats44
- Electrical problems33
- Roaches30
- No heat or hot water29
- Plumbing, sinks and toilets27
- Bedbugs2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 219 closed · NYC typical: 87 days
from 44 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsRemove all encumbrances consisting of gas range at public hall, 6th storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19234749
- BOther repairsRemove all encumbrances consisting of gas range at public hall, 5th storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19234752
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180517
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglazed finish at bathtub in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180528
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180510
- BBroken doors or locksProperly repair or replace the broken or defective door in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180536
- CLeaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from eastIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · rent impairing · Violation #19180504
- BBroken doors or locksProperly repair or replace the broken or defective door in the 1st room from east at southIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180544
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles, through out in the entire apartmentIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180543
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180523
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180532
- CLeaks and water damageRepair the roof so that it will not leak over ceiling in the bathroomIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · rent impairing · Violation #19180531
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180522
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 4th room from eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180520
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 4th room from eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180518
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19180626
- BMoldTrace and repair the source and abate the visible mold condition at ceiling aprox 10 sq feet and at east ceiling 15sq feet in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180629
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective washa basin cabinet in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180628
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19180681
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges door in the entranceIssued Aug 31, 2026 · fix by Sep 14, 2026 overdue · Violation #19180668
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19180596
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19180584
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19180558
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 31, 2026 · fix by Sep 14, 2026 overdue · Violation #19180550
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180677
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket refrigerator door in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180678
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180627
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglazed finish at bathtub in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180625
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180679
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180680
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180682
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180624
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180676
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180672
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180671
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180670
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglazed finish at bathtub in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180669
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19180667
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19180666
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180663
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures light fixture at ceiling in the private hallwayIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180685
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at southIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180605
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180621
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180620
- BMoldTrace and repair the source and abate the visible mold condition at ceiling 10 sq feet and north wall 10 sq feet in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180553
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles through out in the entire apartmentIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180556
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180559
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19180618
- BOther repairsRepair the broken or defective connection at waste line at wash baisn in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180560
- BBroken doors or locksProperly repair or replace the broken or defective door in the 4th room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180616
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180561
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180614
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180562
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles through out in the entire apartmentIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180565
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures light fixture at ceiling in the 1st room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180566
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180567
- BOther repairsProperly repair with similar material the broken or defective wood base cabinet at wash bsin in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180613
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180568
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electric outlet at north wall in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180571
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures light fixture at ceiling in the 2nd room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180572
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.