Housing violations · Parkchester
1491 West Avenue, Bronx
10462 · 64 apartments · 8 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.7 open class C violations per 100 apartments. This building has more.
13 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
What the city has done here
When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.
Latest city repairs
- $Lead paint removal · $32Lead paintJul 16, 2018 · Details
Latest Housing Court cases
- §Tenants sued over repairs and harassmentOpened Jun 18, 2026 · Closed · Details
- §No heat or hot waterOpened Dec 15, 2025 · Pending · Details
Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster28
- No heat or hot water11
- Roaches8
- Broken doors or locks7
- Plumbing, sinks and toilets7
- Other repairs5
- Lead paint5
- Missing smoke or CO detector4
- Leaks and water damage4
- Mice or rats1
- Mold1
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 28 closed · NYC typical: 84 days
from 17 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19368837
- CBroken doors or locksProvide ready access to buildings heating system door lock at boiler roomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19368838
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 9, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19364875
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 9, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19364877
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19364876
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19339249
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19339250
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 4th room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309962
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 19, 2026 · fix by Oct 16, 2026 overdue · rent impairing · Violation #19309976
- CBroken doors or locksProvide ready access to buildings heating system basement door locked at boiler roomIssued Oct 16, 2026 · fix by Oct 22, 2026 overdue · Violation #19303841
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 16, 2026 · fix by Oct 16, 2026 overdue · rent impairing · Violation #19303839
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 5th room from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19224525
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19224524
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and south wall in the private hallwayIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214394
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and south walls in the private hallwayIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19177705
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19177706
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19177707
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19059531
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet at north wall in the kitchenIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18959577
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18959578
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain line at wash basin in the bathroomIssued May 28, 2026 · fix by Jul 2, 2026 overdue · rent impairing · Violation #18959580
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 28, 2026 · fix by Jun 3, 2026 overdue · Violation #18959575
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18944839
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet at north wall in the kitchenIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18944840
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18944837
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 22, 2026 · fix by May 28, 2026 overdue · Violation #18944843
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at drain line at wash basin in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · rent impairing · Violation #18944841
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, south and east walls in the kitchenIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18944838
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet ( rusted ) in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18864093
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18864092
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18864097
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west and south walls in the private hallwayIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18864100
- BOther repairsProperly repair or replace the broken or defective base cabinet at south wall ( rusted ) in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18864094
- BLeaks and water damageRepair the leaky and/or defective faucets at sink faucet in the kitchenIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18547298
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 5, 2026 · fix by Jan 4, 2026 overdue · rent impairing · Violation #18547299
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 5, 2026 · fix by Jan 31, 2026 overdue · Violation #18547297
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 18, 2025 · fix by Dec 18, 2025 overdue · rent impairing · Violation #18513475
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 15, 2025 · fix by Dec 13, 2025 overdue · rent impairing · Violation #18503092
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 15, 2025 · fix by Dec 15, 2025 overdue · rent impairing · Violation #18505366
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 15, 2025 · fix by Dec 13, 2025 overdue · rent impairing · Violation #18503093
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 15, 2025 · fix by Jan 10, 2026 overdue · Violation #18502498
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 1, 2025 · fix by Dec 1, 2025 overdue · rent impairing · Violation #18474826
- BOther repairsProperly repair or replace the broken or defective base cabinet at south wall ( rusted ) in the kitchenIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18256497
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 29, 2025 · fix by Oct 25, 2025 overdue · Violation #18256500
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18256498
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective metal sink base cabinet ( rusted ) in the kitchenIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18256496
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the private hallwayIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18115580
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jun 27, 2025 · fix by Jul 21, 2025 overdue · Violation #18053051
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 27, 2025 · fix by Jul 23, 2025 overdue · Violation #18054349
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, north wall and south wall in the private hallwayIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18045419
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, north wall and south wall in the 5th room from northIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18045421
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 20, 2025 · fix by Jul 16, 2025 overdue · Violation #18045430
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17013501
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchenIssued Sep 26, 2023 · fix by Oct 31, 2023 overdue · Violation #16246218
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchenIssued Sep 26, 2023 · fix by Oct 31, 2023 overdue · Violation #16246484
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Dec 22, 2020 · fix by Jan 17, 2021 overdue · Violation #13953706
- BMoldTrace and repair the source and abate the visible mold condition around window frame approx 5 sq feet in the bathroomIssued Feb 21, 2020 · fix by Mar 27, 2020 overdue · Violation #13612748
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 24, 2019 · fix by Nov 28, 2019 overdue · Violation #13351381
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2018 · fix by May 29, 2018 overdue · Violation #12361054
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2018 · fix by May 29, 2018 overdue · Violation #12361053
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 17, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.