Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · University Heights (South)-Morris Heights

226 West Tremont Avenue, Bronx

10453 · 49 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
124open immediately hazardous violations · 253 per 100 apartments
B164Hazardous, open
A50Non-hazardous, open
!324Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

22 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyCAP 226 Tremont Ave Property Owner LLC
Landlord (head officer or owner)Ian Lagowitz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    105
  2. Peeling paint and plaster
    54
  3. Broken doors or locks
    38
  4. Lead paint
    29
  5. Missing smoke or CO detector
    28
  6. Mold
    20
  7. Roaches
    17
  8. Leaks and water damage
    16
  9. No heat or hot water
    12
  10. Plumbing, sinks and toilets
    11
  11. Mice or rats
    11
  12. Electrical problems
    9

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C77 days
from 138 closed · NYC typical: 87 days
B108 days
from 161 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the entranceIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19360996
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd bathroom from east at southIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19361000
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, east and south wall in the 3rd room from east at southIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19360998
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assembly at building vestibule , 1st storyIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19361001
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling throughout in the 2nd room from east at southIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19360997
  • B
    Other repairsOrder to repair/vacate order must remain posted until such time as the order is rescinded. a copy for posting can be found through hpdonline (www.nyc.gov/hpd).…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302371
  • C
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; order conditions observed…Issued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19302368
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 14, 2026 · fix by Nov 9, 2026 overdue · Violation #19294829
  • B
    Other repairsOrder to repair/vacate order must remain posted until such time as the order is rescinded. a copy for posting can be found through hpdonline (www.nyc.gov/hpd).…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19224871
  • C
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; order conditions observed…Issued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19224870
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch-set at vestibule door at public hall, 1st storyIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19224872
  • C
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; order conditions observed…Issued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19194572
  • B
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; file for a dismissal request…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19194549
  • C
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; order conditions observed…Issued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19194563
  • C
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; order conditions observed…Issued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19194553
  • B
    Other repairsThe following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; file for a dismissal request…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19194565
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at ceiling, north, and west walls at shower stall in the 2nd bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156569
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156603
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east, north, south, and west walls in the 2nd room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156601
  • B
    Broken doors or locksProvide door at entrance in the 2nd room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156600
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156599
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 1st room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156598
  • B
    Other repairsProperly repair with similar material the broken or defective wood flooring in the 1st room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156597
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at south wall in the private hallwayIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156596
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156595
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, east, and south walls in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156594
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, and south walls in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156593
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 3rd room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156592
  • B
    Other repairsReplace with new the missing metal upper escutcheon plate at steam riser in the 3rd room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156591
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tile at east wall at shower in the 2nd bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156590
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and north wall in the 2nd bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156589
  • B
    Other repairsReplace with new the missing upper escutcheon plate at steam riser in the 1st bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156588
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north, and west walls in the 1st bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156587
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, and west walls in the 1st bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156586
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the 1st bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156585
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19156584
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156582
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156581
  • B
    Other repairsReplace with new the missing metal upper escutcheon plate at steam riser in the 2nd bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156579
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, south, and west walls in the 2nd bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156578
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet continuously running in the 2nd bathroom from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · rent impairing · Violation #19156577
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, north, and south walls in the 3rd room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156576
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, north, south, and west walls in the 2nd room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156575
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, east, and south walls in the private hallwayIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156574
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, and south walls in the private hallwayIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156573
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, north, and south walls in the foyerIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156572
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, north, south, and west walls at 1st closet from west at north…Issued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156571
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at floor at south yard , 1st storyIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19155024
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the private hallwayIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156583
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 2nd room from eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156602
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Aug 11, 2026 · fix by Aug 17, 2026 overdue · Violation #19127979
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees at all hot water plumbing fixtures in the entire apartmentIssued Jul 24, 2026 · fix by Jul 30, 2026 overdue · Violation #19098079
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19098064
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19098061
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19098063
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at north wall in the 1st room from north at westIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19087772
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19073852
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jul 15, 2026 · fix by Jul 21, 2026 overdue · Violation #19073856
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles in the private hallwayIssued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19073847
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19073853

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

622017
1692018
862019
352020
292021
572022
1192023
1882024
1752025
1942026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,461 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.