Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Wakefield-Woodlawn

4400 Wickham Avenue, Bronx

10466 · 23 apartments · 5 stories · City Council district 12

By · Updated · Data from NYC HPD

C
23open immediately hazardous violations · 100 per 100 apartments
B34Hazardous, open
A24Non-hazardous, open
!79Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyWICKHAM 4400 ASSOCIATES LLC
Landlord (head officer or owner)Abe Peters

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    19
  2. Peeling paint and plaster
    15
  3. Broken doors or locks
    14
  4. Roaches
    5
  5. Plumbing, sinks and toilets
    5
  6. Mice or rats
    5
  7. Leaks and water damage
    4
  8. Missing smoke or CO detector
    4
  9. Mold
    3
  10. Lead paint
    3
  11. Bedbugs
    2
  12. Missing window guards
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C168 days
from 10 closed · NYC typical: 87 days
B582 days
from 5 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 7, 2026 · fix by Aug 2, 2026 overdue · Violation #19061672
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913053
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at drain pipe at wash basin in the bathroomIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913057
  • C
    Broken doors or locksRemove the illegal fastening consisting of unacceptable electromagnetic locking device at building entrance door , 1st storyIssued May 13, 2026 · fix by May 19, 2026 overdue · rent impairing · Violation #18913060
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913054
  • B
    Broken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock set at building entrance door , 1st storyIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913059
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 13, 2026 · fix by Jun 8, 2026 overdue · Violation #18913052
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913055
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from north at westIssued May 13, 2026 · fix by Jun 17, 2026 overdue · rent impairing · Violation #18913050
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from north at westIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913051
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at window frame from north at east wall in the kitchenIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18650686
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electro magnetic locking device installed at building entrance door at public hall, 1st storyIssued Nov 3, 2025 · fix by Nov 9, 2025 overdue · rent impairing · Violation #18345536
  • B
    Broken doors or locksProvide in the event of power outage by means of an acceptable heavy duty lock and latch set at building entrance door at public hall, 1st storyIssued Nov 3, 2025 · fix by Dec 8, 2025 overdue · Violation #18345538
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 17, 2025 · fix by Nov 12, 2025 overdue · Violation #18297035
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 17, 2025 · fix by Nov 12, 2025 overdue · Violation #18297034
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Aug 26, 2025 · fix by Sep 19, 2025 overdue · Violation #18187640
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18182994
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 25, 2025 · fix by Sep 20, 2025 overdue · Violation #18182996
  • B
    Other repairsProperly repair or replace the broken or defective lower window sash spring balance at 1st window from north at east in the kitchenIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18182995
  • B
    Broken doors or locksProvide in the event of power of power outage by means of a mechanical lock and assembly at door from street to vestibule at public hall, 1st storyIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099271
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of an uncapped gas line at west wall in the kitchenIssued Jul 16, 2025 · fix by Jul 22, 2025 overdue · Violation #18099234
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the kitchenIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099260
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electro-magnetic locking device installed at door from street to vestibule at public hall, 1st storyIssued Jul 16, 2025 · fix by Jul 22, 2025 overdue · rent impairing · Violation #18099268
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). that is missing in the entire apartmentIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099274
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 16, 2025 · fix by Aug 11, 2025 overdue · Violation #18099168
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099169
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099243
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099246
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallwayIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099247
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyerIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099248
  • B
    Other repairsProperly repair or replace the broken or defective ceiling light fixture in the 1st room from north at westIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099250
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at westIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099251
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of broken vinyl floor tiles in the 1st room from north at westIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099253
  • B
    Broken doors or locksReplace with new the missing entrance door in the 1st room from north at westIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099256
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 16, 2025 · fix by Jul 22, 2025 overdue · rent impairing · Violation #18099230
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector that is missing in the entire apartmentIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099273
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of broken vinyl floor tiles creating trip hazard in the foyerIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18099257
  • C
    Broken doors or locksRemove the illegal fastening consisting of illegal 2 motion electromagnetic device at building entrance door (from entrance to vestibule) , 1st storyIssued Nov 22, 2024 · fix by Nov 28, 2024 overdue · rent impairing · Violation #17442897
  • C
    Lead paintRemove the illegal fastening consisting of a key operated lock at door leading to roof preventing re-entry at 1st public hall bulkhead from northIssued Nov 22, 2024 · fix by Nov 28, 2024 overdue · rent impairing · Violation #17442907
  • B
    Broken doors or locksProvide mechanical lock and assembly at building entrance door (from entrance to vestibule) , 1st storyIssued Nov 22, 2024 · fix by Dec 27, 2024 overdue · Violation #17442900
  • C
    Broken doors or locksProperly repair or replace the broken or defective mortise lock in the entranceIssued Nov 22, 2024 · fix by Nov 28, 2024 overdue · Violation #17442891
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 16, 2022 · fix by Jan 11, 2023 overdue · Violation #15611980
  • B
    Other repairsProperly repair with similar material the broken or defective uneven wood floor in the private hallwayIssued Dec 16, 2022 · fix by Jan 20, 2023 overdue · Violation #15611983
  • B
    MoldTrace and repair the source and abate the visible mold condition on north wall approx. 15 sq ft. in the private hallwayIssued Dec 16, 2022 · fix by Jan 20, 2023 overdue · Violation #15611982
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 15 sq. ft. at the ceiling, north wall, east wall in the bathroomIssued Aug 15, 2022 · fix by Sep 19, 2022 overdue · Violation #15317241
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 20, 2022 · fix by Aug 15, 2022 overdue · Violation #15274876
  • C
    Broken doors or locksReplace with new the broken or defective fire rated self closing door in the entranceIssued Apr 1, 2022 · fix by Apr 7, 2022 overdue · Violation #15078450
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 1, 2022 · fix by Apr 27, 2022 overdue · Violation #15078452
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2021 · fix by Sep 21, 2021 overdue · Violation #14505004
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2021 · fix by Sep 21, 2021 overdue · Violation #14505005
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Dec 3, 2020 · fix by Jan 7, 2021 overdue · Violation #13921889
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from northIssued Dec 3, 2020 · fix by Jan 7, 2021 overdue · Violation #13921904
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 31, 2020 · fix by Sep 24, 2020 overdue · Violation #13790048
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 16, 2014 · fix by Oct 14, 2014 overdue · Violation #10379063
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceilings and all walls in the entire apartmentIssued Oct 11, 2013 · fix by Nov 15, 2013 overdue · Violation #10000730
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Sep 10, 2012 · fix by Oct 15, 2012 overdue · Violation #9565031
  • B
    Other repairsProperly repair the broken or defective counter balance at lower sash window in the bathroomIssued Sep 10, 2012 · fix by Oct 15, 2012 overdue · Violation #9565033

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

102019
272020
412021
802022
52023
72024
462025
172026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 549 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.