Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (North)

2242 2 Avenue, Manhattan

10029 · 2 apartments · 4 stories · City Council district 8

By · Updated · Data from NYC HPD

C
21open immediately hazardous violations · 1,050 per 100 apartments
B45Hazardous, open
A5Non-hazardous, open
!71Past the fix-by date

Who owns and manages it

Landlord (head officer or owner)Nasir Sasouness

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    30
  2. Peeling paint and plaster
    8
  3. Broken doors or locks
    6
  4. Electrical problems
    5
  5. Missing smoke or CO detector
    5
  6. Mice or rats
    4
  7. Leaks and water damage
    4
  8. Plumbing, sinks and toilets
    4
  9. No heat or hot water
    3
  10. Mold
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

CNot enough data
NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Other repairs- provide an adequate supply of gas to the fixtures at range in the kitchenIssued Sep 23, 2024 · fix by Sep 29, 2024 overdue · Violation #17289994
  • C
    No heat or hot waterAbate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees fahrenheit measured at 144 degrees fahrenheit in the entire apartmentIssued Sep 4, 2024 · fix by Sep 10, 2024 overdue · Violation #17231265
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling at public hall, 2nd storyIssued Sep 4, 2024 · fix by Oct 9, 2024 overdue · Violation #17231266
  • B
    Broken doors or locksRemove all encumbrances consisting of cardboard boxes and refridgerator blocking scuttle ladder at public hall, 4th storyIssued Sep 4, 2024 · fix by Oct 9, 2024 overdue · Violation #17231267
  • B
    Other repairsProperly repair or replace the broken or defective vinyl flooring in the private hallwayIssued Sep 4, 2024 · fix by Oct 9, 2024 overdue · Violation #17231262
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Sep 4, 2024 · fix by Oct 9, 2024 overdue · Violation #17231264
  • C
    Other repairs- provide an adequate supply of gas to the fixtures at gas range in the entire apartmentIssued Aug 26, 2024 · fix by Sep 1, 2024 overdue · Violation #17216931
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 26, 2024 · fix by Aug 24, 2024 overdue · Violation #17216930
  • B
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2024 · fix by Sep 30, 2024 overdue · Violation #17216932
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). that is defective in the entire apartmentIssued Oct 15, 2018 · fix by Nov 19, 2018 overdue · Violation #12654325
  • B
    Electrical problemsProvide suitable tight cover for handhole opening of trap expose electrical wires at ceiling at public hall, 4th storyIssued Oct 15, 2018 · fix by Nov 19, 2018 overdue · Violation #12654327
  • B
    Other repairsRemove the encumbrance obstructing egress from fire escapes air conditioner front of building at fire escape, 4th storyIssued Oct 15, 2018 · fix by Nov 19, 2018 overdue · Violation #12654328
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Oct 15, 2018 · fix by Nov 19, 2018 overdue · Violation #12654321
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Oct 15, 2018 · fix by Nov 19, 2018 overdue · Violation #12654322
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector that is defective in the entire apartmentIssued Oct 15, 2018 · fix by Nov 19, 2018 overdue · Violation #12654323
  • C
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the kitchenIssued Mar 2, 2015 · fix by Mar 10, 2015 overdue · Violation #10580101
  • C
    Plumbing, sinks and toiletsAbate the nuisance consisting of scalding hot watr at sink excced 130 degrees in the kitchenIssued Mar 2, 2015 · fix by Mar 10, 2015 overdue · Violation #10580119
  • C
    MoldTrace and repair the source and abate the nuisance consisting of mold at celing and all walls approximately 132 sq.ft in the bathroomIssued Mar 2, 2015 · fix by Mar 10, 2015 overdue · Violation #10580089
  • B
    Broken doors or locksAbate the nuisance consisting of boiler room locked at cellarIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662440
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662426
  • C
    Other repairsReplace with new the broken or defective baseboard radiators in the kitchenIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662427
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd storyIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662434
  • B
    Other repairsProvide approved wire screens above and below skylight at roofIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662436
  • B
    Other repairsRemove the encumbrance obstructing egress from fire escapes household items, all stories at fire escapeIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662437
  • B
    Other repairsProvide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day…Issued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662438
  • C
    No heat or hot waterAbate the nuisance consisting of scalding hot water temperature of 145 degrees at all fixtures in the entire apartmentIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662439
  • C
    Broken doors or locksProperly repair the broken or defective lock and assembly at entrance door to building , 1st storyIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662386
  • C
    Other repairsReplace with new the broken or defective light fixture at east wall at public hall, 3rd storyIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662389
  • C
    Other repairsProperly repair the broken or defective ceiling light fixture at public hall, 2nd storyIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662390
  • B
    Electrical problemsAbate the nuisance consisting of exposed electrical wire at east wall at public hall, 3rd storyIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662393
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). 2 missing in the entire apartmentIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662394
  • B
    Missing smoke or CO detector- repair or replace smoke detector , 1 defective and 2 missing in the entire apartmentIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662395
  • C
    Other repairsProperly repair the broken or defective lower sash window in the 3rd room from east at southIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662396
  • B
    Other repairsReplace with new the broken or defective counter balance at lower sash window ( 1st window from south at west wall) in the 3rd room from east at southIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662397
  • C
    Other repairsReplace with new the broken or defective baseboard radiators in the 3rd room from east at southIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662398
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the kitchenIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662401
  • C
    Leaks and water damageAbate the nuisance consisting of concealed water leak ceiling in the kitchenIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662402
  • C
    Other repairsAbate the nuisance consisting of dampness penetrating east and west walls in the kitchenIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662403
  • C
    Other repairsProperly repair the broken or defective mechanical ventilation system in the bathroomIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662404
  • C
    Other repairsAbate the nuisance consisting of dampness penetrating ceiling in the bathroomIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662405
  • B
    Leaks and water damageRepair the leaky and/or defective faucets shower body in the bathroomIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662407
  • B
    Leaks and water damageRepair the leaky and/or defective faucets wash basin in the bathroomIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662408
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in drain at bathtub in the bathroomIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662409
  • B
    Electrical problemsReplace with new the broken or defective gfi outlet at west wall in the bathroomIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662410
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wooden door frame at entrance in the bathroomIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662411
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662412
  • B
    Other repairsReplace with new the missing marble saddle at entrance in the bathroomIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662413
  • B
    Other repairsProperly repair the broken or defective bell buzzer intercom system in the private hallwayIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662414
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the private hallwayIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662415
  • B
    Other repairsProperly repair the broken or defective ceiling light fixture in the private hallwayIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662416
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the 1st room from east at southIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662419
  • B
    Electrical problemsProperly repair the broken or defective electrical light switch in the 2nd room from east at southIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662420
  • B
    Other repairsProperly repair the broken or defective ceiling light fixture in the 2nd room from east at southIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662421
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the 2nd room from east at southIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662422
  • B
    Plumbing, sinks and toiletsReplace with new the broken or defective wood base cabinet at sink in the kitchenIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662423
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection wasteline at sink in the kitchenIssued Oct 25, 2010 · fix by Oct 31, 2010 overdue · Violation #8662424
  • B
    Other repairsReplace with new the broken or defective metal wall cabinet in the kitchenIssued Oct 25, 2010 · fix by Nov 29, 2010 overdue · Violation #8662425
  • C
    Broken doors or locksProperly repair the broken or defective lock assembly at entrance door to bldg , 1st storyIssued Jun 14, 2010 · fix by Jun 20, 2010 overdue · Violation #8465438
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold at ceiling in the bathroomIssued Jun 6, 2007 · fix by Jul 21, 2007 overdue · Violation #6011184
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 6, 2007 · fix by Jul 21, 2007 overdue · Violation #6011207

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82018
92024
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 88 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.