Housing violations · Highbridge
1001 Woodycrest Avenue, Bronx
10452 · 61 apartments · 6 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster56
- Other repairs45
- Mold42
- Mice or rats36
- Leaks and water damage27
- Lead paint24
- Roaches17
- Broken doors or locks16
- Plumbing, sinks and toilets9
- Missing smoke or CO detector9
- Electrical problems2
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 140 closed · NYC typical: 87 days
from 322 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective bell buzzer/intercom system from building front toIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19312384
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the kitchenIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19312385
- BOther repairsProperly repair or replace the broken or defective intercom at north wall in the private hallwayIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296820
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq ft at east wall in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283270
- BOther repairsProperly repair with similar material the broken or defective sagging wood floor in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283272
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283271
- BBroken doors or locksProperly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at south wall in the foyerIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283273
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft. at ceiling in the bathroomIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19266000
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265999
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265998
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door on illegal partition leading to the room with fire escape window in the 4th room from…Issued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19265996
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19274999
- BOther repairsProperly repair or replace the broken or defective intercom/ bell buzzer from panel at building entrance to east wall in the foyerIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256620
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256619
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256618
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft. observed at ceiling in the bathroomIssued Sep 29, 2026 · fix by Oct 25, 2026 overdue · Violation #19256617
- BBroken doors or locksProperly repair or replace the broken or defective latch set and its assembly a building entrance door at public hallIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19183146
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color around window and south wall in the 2nd room from east at southIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166158
- BOther repairsProperly repair with similar material the broken or defective cracked marble saddle in the kitchenIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166145
- BOther repairsProperly repair or replace the broken or defective stuck counterbalance at lower window sash in the 1st room from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166155
- BOther repairsProperly repair with similar material the broken or defective eroded mortar joints around window in the 1st room from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166153
- BOther repairsProperly repair or replace the broken or defective bell buzzer / intercom system from vestibule to return voice panel at west wall private hall in the foyerIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166149
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166141
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166154
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 1st bathroom from northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166142
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the kitchenIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166146
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 2nd bathroom from northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166144
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166143
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak around window and south wall in the 2nd room from east at southIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166160
- BOther repairs& 309 m/d law abate the nuisance consisting of ac protruding more than 4 inches from window sill at 1st fire escape from south at east exterior wall at fire…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19121860
- BOther repairs& 309 m/d law abate the nuisance consisting of ac protruding more than 4 inches from window sill at 1st fire escape from south at east exterior wall at fire…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19121861
- BOther repairs& 309 m/d law abate the nuisance consisting of ac protruding more than 4 inches from window sill at 1st fire escape from south at east exterior wall at fire…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19121859
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ac protruding more than 4 inches from window sill at 1st fire…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19121862
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and south wall in the 1st bathroom from northIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19079288
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner unit protruding more than 6 inched at 1st story…Issued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19055059
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued May 22, 2026 · fix by Jun 15, 2026 overdue · Violation #18954210
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued May 22, 2026 · fix by Jun 15, 2026 overdue · Violation #18954212
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 22, 2026 · fix by Jun 15, 2026 overdue · Violation #18954211
- BOther repairsProperly repair or replace the broken or defective rubber gasket at refrigerator in the kitchenIssued May 21, 2026 · fix by Jun 25, 2026 overdue · Violation #18948061
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from northIssued May 5, 2026 · fix by May 11, 2026 overdue · Violation #18864707
- BOther repairsProperly repair or replace the broken or defective spring balance at upper and lower sash window in the 3rd room from north at eastIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18864723
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814467
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814496
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814524
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814497
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806222
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806223
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 2, 2026 · fix by Apr 28, 2026 overdue · Violation #18753128
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 2, 2026 · fix by Apr 28, 2026 overdue · Violation #18753129
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color holes at east wall behind stove in the kitchenIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18753133
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective holes at base of wooden base cabinet at sink in the kitchenIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18753131
- BOther repairsReplace with new the missing light fixture at ceiling in the 2nd room from east at southIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18753135
- BLead paintProperly repair or replace the broken or defective latch set and it's assemblies at fire door leading to north yard at public hallIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18753139
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash, at north wall window in the bathroomIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18753136
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket around refridgerator door in the kitchenIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18753134
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Apr 2, 2026 · fix by Apr 8, 2026 overdue · Violation #18753126
- BPlumbing, sinks and toiletsProperly secure the loose at washbasin in the 2nd bathroom from northIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18755368
- BElectrical problemsProperly secure the loose outlet cover at north wall in the 2nd room from east at northIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18755282
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in shower stall in the 2nd bathroom from northIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18755372
- BOther repairsProperly repair or replace the broken or defective rubber gasket at refrigerator in the kitchenIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18755418
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.