Housing violations · Bay Ridge
6821 6 Avenue, Brooklyn
11220 · 6 apartments · 3 stories · City Council district 47
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.7 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
What the city has done here
When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.
Latest city repairs
- $General repairs · $2,550Lead paintNov 7, 2024 · Details
- $General repairs · $2,199Broken doors or locksNov 3, 2023 · Details
- $General repairs · $587Broken doors or locksNov 2, 2023 · Details
- $General repairs · $160Missing window guardsMay 4, 2023 · Details
- $Lead paint removal · $56Lead paintJul 21, 2021 · Details
- $General repairs · $458Peeling paint and plasterMay 8, 2014 · Details
- $General repairs · $680Leaks and water damageJan 9, 2014 · Details
Latest Housing Court cases
- §Tenants sued for repairsOpened Aug 11, 2014 · Closed · Details
- §No heat or hot waterOpened May 6, 2014 · Closed · Details
Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.
Open problems
All open violations in the building, by type.
- Other repairs7
- Peeling paint and plaster3
- Lead paint3
- Mold2
- Leaks and water damage2
- Broken doors or locks1
- Plumbing, sinks and toilets1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 10 closed · NYC typical: 84 days
from 12 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsM/d law provide under completed permit, a proper enclosure for the central heating plant, at boiler room at cellarIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18268267
- BBroken doors or locksReplace with new the missing handle at exterior door at bulkhead to the roof at public hallIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18268278
- BPlumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at shower stall,watercloset,wash basin and kitchen sink at…Issued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18268240
- BOther repairs& 309 m/d law abate the nuisance consisting of cable wire at goose neck at roof creating a trip hazardIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18268276
- BMoldTrace and repair the source and abate the visible mold condition approx 15 sq.ft at north wall at public hall, 3rd story original violation 16295394 issued…Issued Feb 12, 2024 · fix by Mar 18, 2024 overdue · Violation #16669680
- BMoldTrace and repair the source and abate the visible mold condition approx 10 sq ft at ceiling in the bathroomIssued Mar 28, 2023 · fix by May 2, 2023 overdue · Violation #15820189
- BOther repairsProperly repair the broken or defective wood floor in the 2nd room from north at eastIssued Jun 8, 2021 · fix by Jul 13, 2021 overdue · Violation #14371348
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 8, 2021 · fix by Jul 4, 2021 overdue · Violation #14371350
- BOther repairsProperly repair the broken or defective spring balance lower sash east 2 window in the 1st room from east at southIssued Jun 8, 2021 · fix by Jul 13, 2021 overdue · Violation #14371346
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling ceiling in the 1st room from east at northIssued Jun 8, 2021 · fix by Jul 13, 2021 overdue · Violation #14371349
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 8, 2021 · fix by Jul 2, 2021 overdue · Violation #14374130
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jun 7, 2021 · fix by Jul 1, 2021 overdue · Violation #14373223
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 7, 2021 · fix by Jul 1, 2021 overdue · Violation #14372633
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from eastIssued Nov 14, 2013 · fix by Dec 19, 2013 overdue · Violation #10032092
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 22, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.