Housing violations · Borough Park
4520 12 Avenue, Brooklyn
11219 · 47 apartments · 6 stories · City Council district 44
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
20 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs46
- Peeling paint and plaster44
- Mold25
- Broken doors or locks23
- Roaches21
- Leaks and water damage20
- Lead paint11
- Plumbing, sinks and toilets10
- Mice or rats8
- Electrical problems7
- Missing smoke or CO detector4
- Missing window guards4
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 109 closed · NYC typical: 87 days
from 119 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor and south wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19361818
- BOther repairsProperly repair with similar material the broken or defective wooden window frame at south wall. in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19361820
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall. in the 1st room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19361815
- BOther repairsProperly repair or replace the broken or defective intercomunication system from building vestibule to west wall in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19361816
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 2nd room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19361817
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19361814
- BOther repairsProperly repair or replace the broken or defective intercom at building front entrance to return panel at north wall in the entranceIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19354384
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362656
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362657
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362655
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362658
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350931
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350932
- BElectrical problemsProperly repair or replace the broken or defective electric outlet cover at west wall in the 1st room from northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350952
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective mechanical stopper at bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350950
- BElectrical problemsProperly repair or replace the broken or defective electric outlet cover at west wall in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350949
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st bathroom from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350935
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st bathroom from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350936
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350921
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door and frame at compactor closet door at public hall, 2nd storyIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19350913
- BOther repairsProperly repair with similar material the broken or defective fire-retardant material at ceiling at public hall, 1st storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19350918
- BOther repairsRemove all encumbrances consisting of household item, multiple baby carriages at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19306804
- BMoldTrace and repair the source and abate the visible mold condition observed approximately 10 sq.ft at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283582
- BOther repairsProperly repair or replace the broken or defective intercom system at east wall in the private hallwayIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283587
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink cabinet in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283583
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283585
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283584
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from east at northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283586
- BElectrical problemsProperly repair with similar material the broken or defective electrical outlet at south wall in the private hallwayIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19283588
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19226497
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19226495
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at west in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19226494
- BOther repairsProperly repair or replace the broken or defective lower counter balance at the east 1 window in the 4th room from eastIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19226514
- BOther repairsProperly repair or replace the broken or defective intercommunication system from building front to north wall panel in the foyerIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19226518
- CMoldTrace and repair the source and abate the visible mold condition greater then 30 sq feet at the ceiling, west and north walls in the bathroomIssued Sep 30, 2026 · fix by Oct 26, 2026 overdue · Violation #19226493
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq feet but less than 30 sq feet observed at the ceiling and east wall in the…Issued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19226517
- BOther repairsProperly repair or replace the broken or defective lower counter balance at the north 1 and north 2 windows in the 4th room from eastIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19226503
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228160
- BOther repairsRemove all encumbrances consisting of strollers and bicycles at public hall, 3rd storyIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · rent impairing · Violation #19226475
- BOther repairsRemove all encumbrances consisting of strollers and bicycles at public hall, 2nd storyIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · rent impairing · Violation #19226474
- BOther repairsRemove all encumbrances consisting of stollers and bicycles and household items at public hall, 1st storyIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · rent impairing · Violation #19226472
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq at ceiling in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19242331
- BOther repairsProperly repair with similar material the broken or defective marble saddle at entrance in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19241276
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Sep 23, 2026 · fix by Oct 7, 2026 overdue · Violation #19228221
- BBroken doors or locksProperly repair with similar material the broken or defective wood base cabinet door at east in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228225
- BOther repairsProperly repair with similar material the broken or defective grout and mortar joints at south, east and west walls in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228224
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 6th room from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228207
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 6th room from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228205
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228199
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228198
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228197
- BOther repairsProperly repair or replace the broken or defective lower counter balance at the south 3 window in the 1st room from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228192
- BElectrical problemsProperly repair or replace the broken or defective electrical wall outlet at west in the private hallwayIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228180
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at washbasin in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · rent impairing · Violation #19228167
- BMoldTrace and repair the source and abate the visible mold condition greater then 10 sq feet at ceiling in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228163
- BOther repairsProperly repair or replace the broken or defective intercommunication system from builidng front to south wall panel in the foyerIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228174
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19228164
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19227093
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 31, 2026 · fix by Sep 24, 2026 overdue · Violation #19180419
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Aug 31, 2026 · fix by Sep 24, 2026 overdue · Violation #19180420
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.