Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Midtown-Turtle Bay

155 East 49 Street, Manhattan

10017 · 67 apartments · 11 stories · City Council district 4

By · Updated · Data from NYC HPD

C
0open immediately hazardous violations
B7Hazardous, open
A0Non-hazardous, open
!7Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

Open in Google Maps ↗

Open problems

All open violations in the building, by type.

  1. Other repairs
    2
  2. Leaks and water damage
    2
  3. Mold
    1
  4. Peeling paint and plaster
    1
  5. Missing smoke or CO detector
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

CNot enough data
NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 1st room from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19165498
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, the north and west wall in the 1st room from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18802440
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18802441
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the 1st room from northIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18802439
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling, west wall and east wall in the 2nd room from north at westIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18775346
  • B
    Other repairsProperly repair with similar material the broken or defective wood floors in the 2nd room from north at westIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18775347
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · Violation #10045875

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12022
12025
72026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 11 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.