Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Flatbush (West)-Ditmas Park-Parkville

3813 18 Avenue, Brooklyn

11218 · 31 apartments · 4 stories · City Council district 40

By · Updated · Data from NYC HPD

C
76open immediately hazardous violations · 245 per 100 apartments
B88Hazardous, open
A20Non-hazardous, open
!180Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyRIZARO 18TH AVE LLC
Landlord (head officer or owner)Robert Izsak

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    55
  2. Broken doors or locks
    25
  3. Roaches
    19
  4. Lead paint
    16
  5. Mice or rats
    13
  6. Plumbing, sinks and toilets
    12
  7. Mold
    10
  8. Leaks and water damage
    9
  9. Electrical problems
    9
  10. Peeling paint and plaster
    8
  11. Missing smoke or CO detector
    6
  12. Missing window guards
    3

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C128 days
from 164 closed · NYC typical: 87 days
B79 days
from 189 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376603
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376604
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19274799
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19266128
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19266127
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19274810
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19274792
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at interior court yardIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19241735
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Sep 24, 2026 · fix by Sep 30, 2026 overdue · Violation #19241730
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19241727
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19241731
  • C
    Other repairsProperly repair or replace the broken or defective cracked and loose section of marble tread, 1st from bottom up, at stairs to split level , building 's…Issued Sep 23, 2026 · fix by Sep 29, 2026 overdue · Violation #19237216
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19151471
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 18, 2026 · fix by Sep 13, 2026 overdue · Violation #19151470
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19091329
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 23, 2026 · fix by Aug 18, 2026 overdue · rent impairing · Violation #19091330
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall and at east wall in the bathroomIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18643311
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at east window frame in the 3rd room from east at southIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18643312
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 20, 2025 · fix by Dec 16, 2025 overdue · Violation #18405010
  • B
    Broken doors or locksProperly repair with similar material the broken or defective rubber gasket at upper and lower doors at refrigerator in the kitchenIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18346079
  • C
    Other repairsProperly repair or replace the broken or defective spring balance upper and lower window sash at public hall stairs, 1st story, section ''north ''Issued Nov 10, 2025 · fix by Nov 16, 2025 overdue · Violation #18346081
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 10, 2025 · fix by Dec 6, 2025 overdue · Violation #18346076
  • C
    Other repairsProperly repair or replace the broken or defective radiator in the 1st room from east at northIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346087
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 5, 2025 · fix by Dec 1, 2025 overdue · Violation #18346100
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at northIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346097
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346096
  • C
    Other repairsProperly repair or replace the broken or defective sloping wood floor in the kitchenIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346094
  • C
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective counter top and basin at sink in the kitchenIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346092
  • C
    Other repairsProperly repair or replace the broken or defective shut-off valve at radiator in the 1st room from east at northIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346090
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at northIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346089
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2025 · fix by Dec 1, 2025 overdue · Violation #18346099
  • B
    Other repairsProperly repair or replace the broken or defective radiator air valve at east wall in the 1st room from east at southIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18302332
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18302335
  • C
    Other repairsProperly repair or replace the broken or defective cracked glass at upper sash window to east wall , in the 1st room from east at southIssued Oct 16, 2025 · fix by Oct 22, 2025 overdue · Violation #18302327
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the private hallwayIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18302319
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18302320
  • B
    Other repairsProperly repair with similar material the broken or defective cracked ceramic floor tiles in the kitchenIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18302325
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 16, 2025 · fix by Nov 11, 2025 overdue · Violation #18302334
  • B
    Broken doors or locksProperly repair or replace the broken or defective gaskets at refrigerator doors in the kitchenIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18302326
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 16, 2025 · fix by Nov 9, 2025 overdue · Violation #18308159
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 14, 2025 · fix by Nov 9, 2025 overdue · Violation #18295711
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 14, 2025 · fix by Nov 9, 2025 overdue · Violation #18295710
  • B
    Other repairsProperly repair or replace the broken or defective bowed steel lintels with deteriorated missing mortar at expantion joint at 4th stry and parapet wallIssued Oct 3, 2025 · fix by Nov 7, 2025 overdue · Violation #18269507
  • B
    Other repairsProperly repair or replace the broken or defective steel lintel at window opening with deteriorated and missing mortar at joints at 2nd,3rd,and 4th story…Issued Oct 3, 2025 · fix by Nov 7, 2025 overdue · Violation #18269491
  • B
    MoldTrace and repair the source and abate the visible mold condition at less than 10 sqft window frame from east at south wall in the bathroomIssued Aug 1, 2025 · fix by Sep 5, 2025 overdue · Violation #18135118
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18054346
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18054359
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jun 18, 2025 · fix by Jun 22, 2025 overdue · Violation #18043571
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jun 18, 2025 · fix by Jun 22, 2025 overdue · Violation #18043572
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 11, 2025 · fix by Jul 7, 2025 overdue · Violation #17999557
  • B
    Broken doors or locksAbate the nuisance consisting of pests. evidence of the 1st door frame from west at north wall in the 1st room from east at northIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17953550
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17934897
  • B
    Broken doors or locksReplace with new the missing mortise lock at door in the entranceIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17934898
  • C
    Broken doors or locksProperly repair or replace the broken or defective door with2-1/2 inces diameter openings in the entranceIssued Jun 5, 2025 · fix by Jun 11, 2025 overdue · Violation #17934899
  • C
    Broken doors or locksRemove device preventing door from being self-closing iron door stop at bottom of door in the entranceIssued Jun 5, 2025 · fix by Jun 19, 2025 overdue · Violation #17934900
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17934901
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 5, 2025 · fix by Jul 1, 2025 overdue · Violation #17934902
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at sink waste line in the kitchenIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17934903
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17934904
  • B
    Electrical problemsProperly secure the loose electrical outlet at west wall in the kitchenIssued Jun 5, 2025 · fix by Jul 10, 2025 overdue · Violation #17934905

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1072017
162018
512019
232020
1022021
912022
1142023
1492024
2872025
632026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,220 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.