Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bath Beach

8798 21 Avenue, Brooklyn

11214 · 16 apartments · 4 stories · City Council district 47

By · Updated · Data from NYC HPD

C
10open immediately hazardous violations · 63 per 100 apartments
B44Hazardous, open
A12Non-hazardous, open
!66Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company8798 21 AVE LLC
Landlord (head officer or owner)Jeno Guttmann

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    20
  2. Peeling paint and plaster
    13
  3. Broken doors or locks
    7
  4. Missing smoke or CO detector
    7
  5. Lead paint
    5
  6. Electrical problems
    4
  7. Leaks and water damage
    4
  8. Plumbing, sinks and toilets
    2
  9. Mold
    1
  10. Roaches
    1
  11. Mice or rats
    1
  12. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C85 days
from 16 closed · NYC typical: 87 days
B119 days
from 54 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 2, 2025 · fix by Sep 26, 2025 overdue · Violation #18201481
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 2, 2025 · fix by Sep 26, 2025 overdue · Violation #18201518
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 2, 2025 · fix by Sep 26, 2025 overdue · Violation #18201519
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 2, 2025 · fix by Sep 26, 2025 overdue · Violation #18201516
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 2, 2025 · fix by Sep 26, 2025 overdue · Violation #18201480
  • B
    Other repairsRefit lower sash of 1st window from west at north in the 2nd room from eastIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17762356
  • B
    Other repairsRefit upper sash of window at north wall in the kitchenIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17762355
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north closet walls in the foyerIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17762353
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17762351
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17762350
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 3rd room from east at southIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17762349
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 10 sq.ft. at north wall and 2 sq.ft. at west wall in the 1st room from north at…Issued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16714643
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 26, 2020 · fix by Jul 22, 2020 overdue · Violation #13707000
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall in the kitchenIssued Jun 26, 2020 · fix by Jul 31, 2020 overdue · Violation #13706985
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 26, 2020 · fix by Jul 22, 2020 overdue · Violation #13707001
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the private hallwayIssued Jun 26, 2020 · fix by Jul 31, 2020 overdue · Violation #13706989
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the kitchenIssued May 7, 2018 · fix by Jun 11, 2018 overdue · Violation #12370535
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items at balcony at fire escape, 3rd storyIssued May 30, 2017 · fix by Jul 4, 2017 overdue · Violation #11802732
  • C
    Broken doors or locksRemove the illegal fastening double cylinder key operated lock to building entrance at front areaway, 1st storyIssued May 30, 2017 · fix by Jun 7, 2017 overdue · rent impairing · Violation #11802731
  • B
    Other repairsProperly repair the broken or defective wood floor ( walking area) in the 2nd room from eastIssued May 30, 2017 · fix by Jul 4, 2017 overdue · Violation #11802727
  • B
    Broken doors or locksArrange and make self-closing the doors ;;; in the entranceIssued May 30, 2017 · fix by Jul 4, 2017 overdue · Violation #11802730
  • C
    Broken doors or locksSection 27-2005 adm code properly repair the broken or defective locking mechanism at entrance door to vestibule at public hall, 1st storyIssued Nov 17, 2014 · fix by Nov 25, 2014 overdue · Violation #10445659
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and at north wall in the 2nd room from eastIssued Jun 20, 2014 · fix by Jul 25, 2014 overdue · Violation #10282233
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from eastIssued Jun 20, 2014 · fix by Jul 25, 2014 overdue · Violation #10282236
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective jamb at north window in the 1st room from east at centerIssued Dec 27, 2012 · fix by Jan 31, 2013 overdue · Violation #9685063
  • B
    Other repairsSection 27-2005 adm code replace with new the broken or defective lower window sash at south wall in the 1st room from east at northIssued Dec 27, 2012 · fix by Jan 31, 2013 overdue · Violation #9685058
  • B
    Electrical problemsSection 27-2005 adm code properly repair the broken or defective electric outlet at north wall in the 1st room from east at northIssued Dec 27, 2012 · fix by Jan 31, 2013 overdue · Violation #9685056
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective vinyle tile in the 3rd room from east at northIssued Dec 27, 2012 · fix by Jan 31, 2013 overdue · Violation #9685055
  • B
    Other repairsSection 27-2005 adm code replace with new the broken or defective lower sash window in the 3rd room from east at southIssued Dec 27, 2012 · fix by Jan 31, 2013 overdue · Violation #9685052
  • B
    Missing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector defective in the entire apartmentIssued Dec 27, 2012 · fix by Jan 31, 2013 overdue · Violation #9685070
  • B
    Missing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartmentIssued Dec 27, 2012 · fix by Jan 31, 2013 overdue · Violation #9685067
  • B
    Other repairsSection 27-2005 adm code replace with new the broken or defective air valve at radiator at north wall in the 1st room from east at centerIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340312
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340366
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective radiator shut off valve at north wall in the 1st room from east at southIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340254
  • B
    Electrical problemsSection 27-2005 adm code properly repair the broken or defective electrical outlet at west wall in the 1st room from east at centerIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340257
  • B
    Other repairsSection 27-2005 adm code replace with new the broken or defective air valve at radiator at north wall in the 3rd room from east at northIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340270
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective shut off valve at radiator at west wall in the 3rd room from east at northIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340280
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective shut off valve at radiator at east wall in the 2nd room from east at centerIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340284
  • B
    Electrical problemsSection 27-2005 adm code properly repair the broken or defective electrical outlet at east wall in the private hallwayIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340346
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective casing at window at north wall in the 2nd room from east at centerIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340341
  • B
    Other repairsSection 27-2005 adm code replace with new the broken or defective air valve at radiator at east wall in the 2nd room from east at centerIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340339
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 2nd room from east at centerIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340307
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 3rd room from east at northIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340365
  • B
    Broken doors or locksSection 27-2005 adm code replace with new the missing handle at door at east wall in the 1st room from east at southIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340368
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from east at southIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340336
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color south and west walls in the 3rd room from east at northIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340331
  • B
    Missing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector missingIssued Feb 27, 2012 · fix by Apr 2, 2012 overdue · Violation #9340370
  • B
    Broken doors or locksSection 27-2044 adm code arrange and make self-closing the doors vestibule entrance door at public hall, 1st storyIssued Sep 7, 2010 · fix by Oct 12, 2010 overdue · Violation #8588270
  • B
    Leaks and water damageSection 27-2005 adm code repair the roof so that it will not leak , in the 3rd room from eastIssued Mar 17, 2010 · fix by Apr 21, 2010 overdue · rent impairing · Violation #8327520
  • B
    BedbugsAbate the nuisance consisting of bedbugs in the entire apartmentIssued Mar 17, 2010 · fix by Apr 21, 2010 overdue · Violation #8327521
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from eastIssued Mar 17, 2010 · fix by Apr 21, 2010 overdue · Violation #8327522
  • B
    Plumbing, sinks and toiletsSection 27-2005 adm code properly secure the loose washbasin in the bathroomIssued Jul 10, 2009 · fix by Aug 14, 2009 overdue · Violation #7956292
  • B
    Plumbing, sinks and toiletsSection 27-2005 adm code properly secure the loose wash basin to wall in the bathroomIssued Oct 10, 2007 · fix by Nov 14, 2007 overdue · Violation #6957256
  • C
    Other repairsSection 27-2056.7 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued May 25, 2005 · fix by Jun 20, 2005 overdue · Violation #5515226

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

252017
482018
92019
552020
62021
12022
112023
372024
502025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 311 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.