Housing violations · Sunset Park (East)-Borough Park (West)
902 44 Street, Brooklyn
11219 · 67 apartments · 4 stories · City Council district 38
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster34
- Other repairs24
- Leaks and water damage18
- Broken doors or locks14
- Mold12
- Missing smoke or CO detector7
- Roaches7
- Lead paint6
- Plumbing, sinks and toilets3
- Bedbugs2
- Missing window guards2
- Mice or rats2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 96 closed · NYC typical: 87 days
from 151 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at northIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294768
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 3rd room from east at southIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294770
- BBroken doors or locksProperly repair with similar material the broken or defective caulking around door frame in the entranceIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292757
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292755
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292752
- BOther repairsProperly repair or replace the broken or defective wood saddle at entry in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292756
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292764
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall behind base cabinet in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292754
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292763
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster approx square feet at ceiling in the 3rd room from eastIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19292758
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292760
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292765
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292759
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,west and east walls in the 1st room from eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292766
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292768
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19292751
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor and east wall in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292753
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19292762
- BBroken doors or locksProperly repair or replace the broken or defective wood doors at base cabinet at east in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292767
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at south wall at intermediate landing at public hall, 2nd storyIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283819
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall at public hall, 2nd storyIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283821
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258940
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258945
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258941
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258942
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Oct 1, 2026 · fix by Oct 25, 2026 overdue · Violation #19267070
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft but less than 30 sq ft observed at ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258947
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19251904
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19251905
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19251906
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258943
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19258944
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258946
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257031
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257033
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257034
- BOther repairs& 309 m/d law abate the nuisance consisting of uncapped radiator shut off valve at east wall in the 3rd room from north at westIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257035
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257030
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257032
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall west wall in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257026
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 30, 2026 · fix by Oct 26, 2026 overdue · Violation #19257028
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257029
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19241365
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19241342
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19225212
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19225213
- BOther repairsRemove all encumbrances consisting of shopping cart and household items at public hall, 2nd storyIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · rent impairing · Violation #19171379
- BOther repairsProperly repair with similar material the broken or defective caulking, grout joints of the ceramic tiles at west, north and east walls, in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171375
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceilng, in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171377
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19160669
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19160668
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Aug 24, 2026 · fix by Sep 7, 2026 overdue · Violation #19157474
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Aug 24, 2026 · fix by Sep 7, 2026 overdue · Violation #19157464
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · rent impairing · Violation #19157466
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19157467
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19157471
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall and floor in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19157472
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster approx 4 square feet at ceiling in the 1st room from northIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19157469
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color throughout all walls and ceilings in the entire apartmentIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19157465
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19101298
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.