Housing violations · East Harlem (South)
307 East 101 Street, Manhattan
10029 · 34 apartments · 7 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster6
- Roaches5
- Other repairs5
- Mice or rats4
- Broken doors or locks3
- Missing smoke or CO detector2
- Mold1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 17 closed · NYC typical: 84 days
from 37 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19336464
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19336465
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 27, 2026 · fix by Nov 22, 2026 · Violation #19336471
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yardIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19163676
- BOther repairsAbate the nuisance consisting of pests. evidence of flies at public hall, 1st storyIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19163677
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19174275
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 28, 2026 · fix by Sep 11, 2026 overdue · Violation #19174291
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 28, 2026 · fix by Sep 23, 2026 overdue · Violation #19174280
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19149010
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19149011
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the 2nd bathroom from eastIssued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19095515
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door frame in the entranceIssued Jun 12, 2026 · fix by Jun 26, 2026 overdue · Violation #19003858
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline pipe at wash/basin in the 1st bathroom from eastIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #19003845
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 9, 2026 · fix by Apr 4, 2026 overdue · Violation #18701018
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 2nd bathroom from eastIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18701009
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 9, 2026 · fix by Apr 4, 2026 overdue · Violation #18701017
- BBroken doors or locksProperly repair or replace the broken or defective wood door at entrance in the 1st bathroom from eastIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18297925
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18297928
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18297945
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 16, 2025 · fix by Nov 11, 2025 overdue · Violation #18297949
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 16, 2025 · fix by Nov 11, 2025 overdue · Violation #18297952
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 6th room from eastIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18297965
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.