Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (South)

116 East 102 Street, Manhattan

10029 · 9 apartments · 5 stories · City Council district 8

By · Updated · Data from NYC HPD

C
12open immediately hazardous violations · 133 per 100 apartments
B34Hazardous, open
A24Non-hazardous, open
!67Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyASCENDANT HERITAGE LLC
Landlord (head officer or owner)Christopher Cirillo

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    23
  2. Peeling paint and plaster
    11
  3. Broken doors or locks
    9
  4. Electrical problems
    7
  5. Roaches
    4
  6. Leaks and water damage
    4
  7. Lead paint
    4
  8. No heat or hot water
    3
  9. Plumbing, sinks and toilets
    3
  10. Mold
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C171 days
from 6 closed · NYC typical: 87 days
B91 days
from 15 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19374468
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the private hallwayIssued Nov 16, 2026 · Violation #19374467
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19223887
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall at vestibule area at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223892
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130f in the entire apartmentIssued Sep 18, 2026 · fix by Sep 24, 2026 overdue · Violation #19233564
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective hinges at bulkhead door leading to rooftop area at public hall, 5th storyIssued Sep 18, 2026 · fix by Oct 2, 2026 overdue · Violation #19223889
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at vestibule area at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223890
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19223888
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at the ceiling in the kitchenIssued Jun 24, 2026 · fix by Jul 29, 2026 overdue · Violation #19024095
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the bathtub in the 1st bathroom from eastIssued Jun 24, 2026 · fix by Jul 29, 2026 overdue · Violation #19024099
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jun 24, 2026 · fix by Jul 29, 2026 overdue · Violation #19024089
  • B
    Other repairsProperly repair or replace the broken or defective lower spring balance at the 1st window from south at west (fire escape window) in the 4th room from eastIssued Jun 24, 2026 · fix by Jul 29, 2026 overdue · Violation #19024094
  • B
    Lead paintProperly repair the source and abate the evidence of a water leak at ceiling and east wall at building vestibule area leading to 1st story public hall , 1st…Issued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18820614
  • B
    Lead paintProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at building vestibule area leading to 1st story…Issued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18820612
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall at building vestibule area , 1st storyIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18791080
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at building vestibule area , 1st storyIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18791078
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at building entrance door , 1st storyIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18791081
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18791077
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall at building vestibule area , 1st storyIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18519837
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 15, 2025 · fix by Dec 15, 2025 overdue · rent impairing · Violation #18505815
  • C
    Broken doors or locksProvide ready access to buildings heating system basement door lock at boiler roomIssued Dec 15, 2025 · fix by Dec 21, 2025 overdue · Violation #18505816
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 15, 2025 · fix by Dec 15, 2025 overdue · rent impairing · Violation #18505817
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroom from north at westIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · rent impairing · Violation #18334996
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at ceiling and north wall in the 1st bathroom from north at westIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334993
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st bathroom from north at westIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334994
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the 1st bathroom from north at eastIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334991
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the private hallwayIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18335002
  • B
    Broken doors or locksProperly repair or replace the broken or defective door at west wall in the 4th room from north at eastIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18335001
  • B
    Other repairsProperly repair with similar material the broken or defective wall cabinet at north wall in the kitchenIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18335000
  • B
    Other repairsProperly repair with similar material the broken or defective wood base cabinet at north wall in the kitchenIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334999
  • B
    Broken doors or locksProperly repair or replace the broken or defective door at wood base cabinet in the 1st bathroom from north at westIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334998
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the 1st bathroom from north at westIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334997
  • B
    Other repairsProperly repair with similar material the broken or defective grout at all wall tiles in the 1st bathroom from north at westIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18334995
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroom from north at eastIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · rent impairing · Violation #18334992
  • B
    Other repairsProperly repair or replace the broken or defective wood floor in the kitchenIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17866487
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 3rd room from north at eastIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17866075
  • B
    Electrical problemsReplace with new the missing electrical outlet cover plate at east wall in the 3rd room from north at eastIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17866076
  • B
    Other repairsProperly repair or replace the broken or defective wood floor in the 4th room from northIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17866065
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the private hallwayIssued Apr 30, 2025 · fix by Jun 4, 2025 overdue · Violation #17866071
  • B
    Other repairsProperly repair with similar material the broken or defective broken ceramic tile at north wall in the 2nd bathroom from north at westIssued Apr 30, 2025 · fix by Jun 4, 2025 overdue · Violation #17866064
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 30, 2025 · fix by May 26, 2025 overdue · Violation #17866078
  • C
    Other repairsProperly repair or replace the broken or defective wood floor in the 1st room from north at eastIssued Apr 30, 2025 · fix by May 6, 2025 overdue · Violation #17866066
  • C
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective water damaged cabinet at sink in the kitchenIssued Apr 30, 2025 · fix by May 6, 2025 overdue · Violation #17866068
  • B
    Other repairsReplace with new the missing ceramic tile at west wall in the 2nd bathroom from north at westIssued Apr 30, 2025 · fix by Jun 4, 2025 overdue · Violation #17866062
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 29, 2024 · fix by Feb 24, 2024 overdue · Violation #16627672
  • B
    Other repairsProperly repair with similar material the broken or defective wood flooring in the 1st room from north at eastIssued Jan 25, 2023 · fix by Mar 1, 2023 overdue · Violation #15676685

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

252017
32018
92019
72020
12021
102023
132024
302025
372026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 211 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.