Housing violations · East Harlem (South)
124 East 103 Street, Manhattan
10029 · 30 apartments · 6 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
14 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs29
- Broken doors or locks19
- No heat or hot water10
- Peeling paint and plaster9
- Leaks and water damage7
- Mold5
- Roaches5
- Plumbing, sinks and toilets3
- Mice or rats3
- Bedbugs1
- Missing window guards1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 34 closed · NYC typical: 87 days
from 46 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at public hall, 1st storyIssued Oct 5, 2026 · fix by Oct 19, 2026 overdue · Violation #19182519
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at public hall, 1st storyIssued Oct 5, 2026 · fix by Oct 19, 2026 overdue · Violation #19182520
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259352
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259347
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259348
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259349
- BOther repairsProperly repair or replace the broken or defective bell/buzzer/intercom system from building entrance to panel at west wall in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259350
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19164007
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash window, north wall in the 1st room from north at eastIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19164005
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north , east walls and ceiling in the 1st room from north at westIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19164003
- BOther repairsProperly repair with similar material the broken or defective concrete tread 1st from bottom at building entranceIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19164012
- BOther repairsProperly secure the loose radiator at east wall in the 1st room from north at westIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19164011
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north , east walls and ceiling in the 1st room from north at westIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19164010
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north and east walls in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19164009
- COther repairsProperly repair or replace the broken or defective 1st marble tread from bottom up at building front entrance stairIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19159817
- COther repairsProperly repair with similar material the broken or defective 1st masonry tread from bottom up at building front entrance stairIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19150140
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the household furniture (couch) at building frontIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150141
- BMoldTrace and repair the source and abate the visible mold condition less than 1o square feet at ceiling in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18763861
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18601729
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wooden baseboard at wash basin cabinet in the kitchenIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18601730
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Dec 30, 2025 · fix by Jan 5, 2026 overdue · Violation #18535166
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 30, 2025 · fix by Dec 30, 2025 overdue · rent impairing · Violation #18535164
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 30, 2025 · fix by Dec 30, 2025 overdue · rent impairing · Violation #18535167
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 30, 2025 · fix by Dec 30, 2025 overdue · rent impairing · Violation #18535168
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yardIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18485009
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Dec 8, 2025 · fix by Jan 3, 2026 overdue · rent impairing · Violation #18485006
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at east wall at bulkheadIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18485007
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18479629
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18479628
- BOther repairsRemove all encumbrances consisting of house hold items at public hall, 6th storyIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · rent impairing · Violation #18251948
- BOther repairsRemove all encumbrances consisting of house hold items at bulkheadIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · rent impairing · Violation #18251932
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 5, 2025 · fix by May 31, 2025 overdue · Violation #17870156
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 5, 2025 · fix by May 5, 2025 overdue · rent impairing · Violation #17870157
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 5, 2025 · fix by May 19, 2025 overdue · Violation #17870155
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 5, 2025 · fix by May 11, 2025 overdue · Violation #17870154
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 5, 2025 · fix by May 19, 2025 overdue · Violation #17870158
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 13, 2024 · fix by Jul 9, 2024 overdue · Violation #17047855
- CBroken doors or locksRemove device preventing door from being self-closing consisting of a door sweep installed at apartment door in the entranceIssued Jun 6, 2024 · fix by Jun 20, 2024 overdue · Violation #17031812
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Mar 19, 2024 · fix by Apr 14, 2024 overdue · Violation #16757417
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 19, 2024 · fix by Apr 14, 2024 overdue · Violation #16757461
- BOther repairsProperly repair or replace the broken or defective upper window sash spring balance in the 5th room from northIssued Mar 19, 2024 · fix by Apr 23, 2024 overdue · Violation #16757466
- BOther repairs& 309 m/d law abate the nuisance consisting of uncapped radiator shutoff valve in the 1st room from north at eastIssued Mar 19, 2024 · fix by Apr 23, 2024 overdue · Violation #16757440
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to east wall panel in the foyerIssued Oct 11, 2023 · fix by Nov 15, 2023 overdue · Violation #16294746
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 5th room from northIssued Sep 5, 2023 · fix by Oct 10, 2023 overdue · Violation #16189074
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 5th room from northIssued Sep 5, 2023 · fix by Oct 10, 2023 overdue · Violation #16189073
- BOther repairsProperly repair or replace the broken or defective bell/buzzer from building entrance to apartment at east wall in the foyerIssued Aug 15, 2023 · fix by Sep 19, 2023 overdue · Violation #16156962
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2023 · fix by Sep 2, 2023 overdue · Violation #16135456
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 16, 2023 · fix by Jun 11, 2023 overdue · Violation #15975984
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 16, 2023 · fix by Jun 11, 2023 overdue · Violation #15975985
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 28, 2023 · fix by Apr 27, 2023 overdue · rent impairing · Violation #15952617
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Apr 28, 2023 · fix by May 12, 2023 overdue · Violation #15952665
- BMoldTrace and repair the source and abate the visible mold condition evidence of mold at the ceiling approx #10 sq ft in the bathroomIssued Mar 20, 2023 · fix by Apr 24, 2023 overdue · Violation #15789755
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Mar 6, 2023 · fix by Mar 20, 2023 overdue · Violation #15755951
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 6, 2023 · fix by Apr 1, 2023 overdue · Violation #15755953
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 6, 2023 · fix by Mar 5, 2023 overdue · rent impairing · Violation #15755955
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Dec 5, 2022 · fix by Dec 11, 2022 overdue · Violation #15593887
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 30, 2022 · fix by Nov 30, 2022 overdue · rent impairing · Violation #15585867
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 28, 2022 · fix by Nov 25, 2022 overdue · rent impairing · Violation #15578890
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 28, 2022 · fix by Dec 4, 2022 overdue · Violation #15578891
- CBroken doors or locksProvide ready access to buildings heating system lock door at boiler roomIssued Nov 9, 2022 · fix by Nov 15, 2022 overdue · Violation #15486057
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.