Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (South)

155 East 104 Street, Manhattan

10029 · 16 apartments · 5 stories · City Council district 8

By · Updated · Data from NYC HPD

C
40open immediately hazardous violations · 250 per 100 apartments
B29Hazardous, open
A8Non-hazardous, open
!77Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

14 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyMuscoota Hope, LLC
Landlord (head officer or owner)Walter Roberts

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    17
  2. Broken doors or locks
    17
  3. No heat or hot water
    14
  4. Missing smoke or CO detector
    13
  5. Peeling paint and plaster
    9
  6. Electrical problems
    3
  7. Roaches
    2
  8. Missing window guards
    1
  9. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C30 days
from 25 closed · NYC typical: 87 days
B117 days
from 4 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall, in the 2nd room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18913696
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material ceiling, at public hall, 2nd storyIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18913701
  • B
    Other repairsProperly repair with similar material the broken or defective floor tiles at public hall, 1st storyIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18913707
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 12, 2026 · fix by Jan 12, 2026 overdue · rent impairing · Violation #18565297
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the 3rd room from northIssued Nov 13, 2025 · fix by Nov 13, 2025 overdue · rent impairing · Violation #18364059
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jul 11, 2025 · fix by Aug 15, 2025 overdue · Violation #18083020
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jul 11, 2025 · fix by Aug 15, 2025 overdue · Violation #18083021
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 11, 2025 · fix by Jul 25, 2025 overdue · Violation #18083023
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 11, 2025 · fix by Jul 11, 2025 overdue · rent impairing · Violation #18083022
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 10, 2025 · fix by Jul 24, 2025 overdue · Violation #18077521
  • B
    Broken doors or locksProperly repair or replace the broken or defective heavy duty lock and latch set at vestibule door at public hall, 1st storyIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18077522
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Jul 10, 2025 · fix by Jul 16, 2025 overdue · Violation #18077518
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 10, 2025 · fix by Jul 10, 2025 overdue · rent impairing · Violation #18077517
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18077520
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18077519
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 7, 2025 · fix by Jul 21, 2025 overdue · Violation #18068160
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the kitchenIssued Jul 7, 2025 · fix by Jul 6, 2025 overdue · rent impairing · Violation #18068158
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 7, 2025 · fix by Jul 6, 2025 overdue · rent impairing · Violation #18068161
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 7, 2025 · fix by Jul 21, 2025 overdue · Violation #18068159
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Jun 13, 2025 · fix by Jun 19, 2025 overdue · rent impairing · Violation #17976939
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 13, 2025 · fix by Jun 12, 2025 overdue · rent impairing · Violation #17976937
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower sash window at west wall in the 3rd room from northIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17976941
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jun 13, 2025 · fix by Jun 19, 2025 overdue · Violation #17976938
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 13, 2025 · fix by Jun 27, 2025 overdue · Violation #17976940
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 13, 2025 · fix by Jun 12, 2025 overdue · rent impairing · Violation #17976944
  • C
    No heat or hot waterProvide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the…Issued Jun 13, 2025 · fix by Jun 19, 2025 overdue · Violation #18025157
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 2nd room from northIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #17976946
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at 1st boiler room from north at westIssued Feb 12, 2025 · fix by Feb 18, 2025 overdue · Violation #17687687
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 12, 2025 · fix by Mar 19, 2025 overdue · Violation #17687684
  • C
    Electrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Feb 11, 2025 · fix by Feb 11, 2025 overdue · Violation #17691776
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Feb 6, 2025 · fix by Mar 13, 2025 overdue · Violation #17674181
  • C
    Broken doors or locksProvide ready access to buildings heating system lock door at boiler roomIssued Feb 6, 2025 · fix by Feb 12, 2025 overdue · Violation #17674183
  • B
    Other repairsProperly repair or replace the broken or defective spring balance upper and lower window sash in the bathroomIssued Feb 6, 2025 · fix by Mar 13, 2025 overdue · Violation #17674182
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Feb 6, 2025 · fix by Mar 13, 2025 overdue · Violation #17674180
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock at building entrance door at public hall, 1st storyIssued Feb 6, 2025 · fix by Feb 12, 2025 overdue · Violation #17674184
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of house hold furniture blocking egress in the 1st room from east at northIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · Violation #17667968
  • C
    Broken doors or locksProperly repair or replace the broken or defective lockset at building entrance door at public hall, 1st storyIssued Jan 30, 2025 · fix by Feb 5, 2025 overdue · Violation #17658941
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 30, 2025 · fix by Jan 30, 2025 overdue · rent impairing · Violation #17658938
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 30, 2025 · fix by Jan 30, 2025 overdue · rent impairing · Violation #17658936
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17425995
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17425994
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, south, east, and west walls in the bathroomIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17425993
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st storyIssued Sep 23, 2024 · fix by Sep 29, 2024 overdue · Violation #17280610
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Apr 8, 2024 · fix by May 4, 2024 overdue · Violation #16821077
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west, north walls and ceiling in the bathroomIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821080
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821076
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16821075
  • C
    Other repairsReplace with new the broken or defective airvalve at heat riser at south wall in the bathroomIssued Jan 27, 2023 · fix by Feb 2, 2023 overdue · Violation #15676412
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jan 25, 2023 · fix by Feb 8, 2023 overdue · Violation #15676410
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 5, 2022 · fix by Dec 4, 2022 overdue · rent impairing · Violation #15593810
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 18, 2021 · fix by Oct 16, 2021 overdue · rent impairing · Violation #14622373
  • C
    Broken doors or locksArrange and make self-closing the doors in the entranceIssued Oct 18, 2021 · fix by Nov 13, 2021 overdue · Violation #14622375
  • C
    Broken doors or locksProvide ready access to buildings heating system locked boiler room door at basementIssued Oct 18, 2021 · fix by Oct 24, 2021 overdue · Violation #14622374
  • C
    Lead paintProvide ready access to buildings heating system door leading to boiler room locked at public hall, 1st storyIssued Oct 14, 2021 · fix by Oct 20, 2021 overdue · Violation #14612203
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 14, 2021 · fix by Oct 14, 2021 overdue · rent impairing · Violation #14614168
  • C
    Other repairsProvide ready access to buildings heating system at boiler roomIssued Oct 12, 2021 · fix by Oct 18, 2021 overdue · Violation #14611717
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 16, 2021 · fix by Sep 11, 2021 overdue · Violation #14496180
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective plastic cover on deviceIssued Aug 9, 2021 · fix by Sep 13, 2021 overdue · Violation #14483241
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective plastic cover on deviceIssued Aug 9, 2021 · fix by Sep 13, 2021 overdue · Violation #14483242
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2020 · fix by Oct 17, 2020 overdue · Violation #13779995

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12017
92018
72019
12020
152021
22022
132023
172024
532025
72026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 150 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.