Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (South)

154 East 106 Street, Manhattan

10029 · 20 apartments · 5 stories · City Council district 8

By · Updated · Data from NYC HPD

C
13open immediately hazardous violations · 65 per 100 apartments
B43Hazardous, open
A7Non-hazardous, open
!63Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning company154 East 106 LLC
Landlord (head officer or owner)Mark Furman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    13
  2. Other repairs
    12
  3. Leaks and water damage
    9
  4. Roaches
    7
  5. Mold
    6
  6. Broken doors or locks
    5
  7. Lead paint
    5
  8. Mice or rats
    3
  9. Missing smoke or CO detector
    2
  10. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C75 days
from 7 closed · NYC typical: 87 days
B72 days
from 2 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance doorIssued Jul 6, 2026 · fix by Jul 20, 2026 overdue · Violation #19055079
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18810252
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at west wall in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18810251
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18810254
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 2nd room from northIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18737651
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from northIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18737650
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued Mar 26, 2026 · fix by Apr 1, 2026 overdue · Violation #18737645
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the kitchenIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18737646
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq at south wall in the bathroomIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18737644
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18737647
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18737648
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18737649
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch set at building entrance doorIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18634399
  • B
    MoldTrace and repair the source and abate the visible mold condition at celing 2sq. ft. in the kitchenIssued Sep 13, 2023 · fix by Oct 18, 2023 overdue · Violation #16226851
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15979499
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor near radiator in the 1st room from northIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15979501
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15979500
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15979497
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15979496
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15979495
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15979494
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Apr 11, 2022 · fix by May 16, 2022 overdue · Violation #15103458
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Apr 11, 2022 · fix by May 16, 2022 overdue · Violation #15103459
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Apr 11, 2022 · fix by May 16, 2022 overdue · Violation #15103457
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Apr 6, 2022 · fix by Apr 10, 2022 overdue · Violation #15095087
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Apr 6, 2022 · fix by Apr 10, 2022 overdue · Violation #15095088
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 28, 2019 · fix by Aug 2, 2019 overdue · Violation #13142334
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 28, 2019 · fix by Jul 19, 2019 overdue · Violation #13142384
  • C
    Broken doors or locksArrange and make self-closing the doors in the entranceIssued Jun 28, 2019 · fix by Jul 19, 2019 overdue · Violation #13142331
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 28, 2019 · fix by Aug 2, 2019 overdue · Violation #13142337
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 20, 2019 · fix by Jul 25, 2019 overdue · Violation #13128998
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Jun 20, 2019 · fix by Jul 25, 2019 overdue · Violation #13128999
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 20, 2019 · fix by Jul 11, 2019 overdue · Violation #13129002
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Jun 20, 2019 · fix by Jul 25, 2019 overdue · Violation #13129001
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued Jun 20, 2019 · fix by Jul 25, 2019 overdue · Violation #13129000
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in the bathroomIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13055137
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 8, 2019 · fix by May 29, 2019 overdue · Violation #13055124
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 8, 2019 · fix by May 29, 2019 overdue · Violation #13055123
  • B
    Other repairsProperly repair the broken or defective wood treads 5,6,7,8,9,10 and 11th from botttom at public hall stairs, 1st storyIssued May 8, 2019 · fix by Jun 12, 2019 overdue · Violation #13055089
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 8, 2019 · fix by May 29, 2019 overdue · Violation #13055084
  • B
    Other repairsProperly repair the broken or defective intercom system at west wall in the foyerIssued Mar 22, 2019 · fix by Apr 26, 2019 overdue · Violation #12971779
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 22, 2019 · fix by Apr 12, 2019 overdue · Violation #12971774
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 22, 2019 · fix by Apr 12, 2019 overdue · Violation #12971767
  • B
    Broken doors or locksArrange and make self-closing the doors in the entranceIssued Dec 10, 2018 · fix by Jan 14, 2019 overdue · Violation #12794236
  • B
    Broken doors or locksProperly repair the broken or defective catch lock at fire escape window in the 1st room from northIssued Dec 10, 2018 · fix by Jan 14, 2019 overdue · Violation #12794360
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold the ceiling and all walls 10 sq.ftIssued Nov 29, 2018 · fix by Jan 3, 2019 overdue · Violation #12777233
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the closetIssued Nov 29, 2018 · fix by Jan 3, 2019 overdue · Violation #12777237
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold aprox 12 sq ft at ceiling and west wall in the bathroomIssued Oct 10, 2018 · fix by Nov 14, 2018 overdue · Violation #12630403
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold aprox 6 sq ft, ceiling and south wall in the south closet. in the kitchenIssued Oct 10, 2018 · fix by Nov 14, 2018 overdue · Violation #12630413
  • B
    Other repairsProperly repair with similar material the broken or defective sloping wood floor in the 2nd room from northIssued Sep 26, 2018 · fix by Oct 31, 2018 overdue · Violation #12602218
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Aug 13, 2018 · fix by Sep 17, 2018 overdue · Violation #12519143
  • B
    Other repairsReplace with new the broken or defective air valve at heat riser in the bathroomIssued Aug 13, 2018 · fix by Sep 17, 2018 overdue · Violation #12519493
  • B
    RoachesAbate the nuisance consisting of roachesIssued Aug 13, 2018 · fix by Sep 17, 2018 overdue · Violation #12519489
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Feb 16, 2018 · fix by Mar 23, 2018 overdue · Violation #12242616
  • B
    RoachesAbate the nuisance consisting of roachesIssued Oct 6, 2016 · fix by Nov 10, 2016 overdue · Violation #11422905
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of telephone wires at south roof by gooseneck ladder creating a trip-hazardIssued Jun 3, 2010 · fix by Jul 8, 2010 overdue · Violation #8445909

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1142017
832018
352019
12021
112022
92023
82024
12025
162026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 489 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.